Tender For Supply Of Equipment / Material , Design, Erection, Testing , Commissioning For Sop To Hrtc Chamba For Proposed Newly Constructed Building Of Bus Stand At Bhanjraru By Prov. 11/.4 Kv 250 Kva S/Stn. At Bhanjraru Bus Stand A/W 11 Kv Ht And Lt-- 1 Supply part of 11/.4 KV 250 KVA DISTRIBUTION SUB STATION 2 11/.4 KV 250KVA DTR (REC Sep. ord 11/1976 3 Prov. ST PolePole 9 Mtr. Long W/L 200 Kgs 4 Muff for steel tubular pole with concrete filling 5 X-Arm: [Channel Iron (100x50x5 mm), Length : 2800 mm X 2 Nos] for incomer line 6 MS A.I.(50X50x6 mm), Length: 2800 mm x(1 Nos for LAs ) 7 X-Arm: [Channel Iron (75x40x5 mm), Length : 2800 mm X 4 Nos] for supporting DO fuse unit & GO switch 8 X-Arm: [Channel Iron (100x50x6 mm), Length : 2800 mm X 2 Nos] for transformer bed 9 X-Arm [Channel Iron (100x50x6 mm), Length : 460 mm x 2 Nos for supporting Main Channel of Transformer] 10 MS A.I.(50X50x6 mm), Length: (2800 mm) x 2 No. 11 MS Angle Iron (35X35x5 mm), Length : 460 mm x 2 Nos 12 MS A.I.(50X50x6 mm), Length: (950 mm) x 2 Nos. of bed knee bracing 13 MS Angle Iron (50X50x6 mm), Length : (2800 mm) x2 Nos for Transformer LT Distribution Box and G.O switch fixing assembly 14 MS Angle Iron (50X50x6 mm), Length : (450 mm)x1 Nos for Transformer LT Distribution Box and G.O switch fixing assembly 15 G.O. Switch handle supporting: [C.I. (75x40x6mm), length: 460mm for Transformer LT Distribution Box and G.O switch fixing assembly 16 G.O AB switch unit (11KV,400,663KA) Tripple pole O/D type 17 D.O Fuse unit 18 Surge Arrester, 9 kV Station Class 19 Discs insulator sets (comp. 1 No. Disc: ^^(Porcelain, BS, 12 kV, 90 kN) i/c Dead End Clamps etc.) 20 Stay set complete 21 Staywire (7/3.15mm)( 10 Kg per stay set) 22 Pipe earthing with GI,Charcoal & Salt 23 Prov. LT distribution panel with MCCB (400 A, 36 KA, 4P,1 No.) & SFU (100 A 4 No. rewireble) for 250KVA Trf. as per specification 24 Half clamp (M.S. Flat 50x6) 25 Full clamps (M.S. Flat 50x6) 26 M. S. Nuts & Bolts off sizes (Galvanised coated) [prefarably 16mm Ø or more (with flat and spring washer) 27 Aluminium Thimbles 28 Copper Thimble 29 Danger Plate 30 Barbed wire (REC Sp F 3/1981) 31 LT Cable 3-1/2 core-185mm sq. 32 Alluminium Paint 33 Prov.ACSR, 6/1/3.35 mm 34 prov. HP make AIQ Desktop Model HP 200 G4 with intell core 3-10110U-10 Gen.processor, 8GB DDR4 RAM expenditure upto 16 GB, ITB, HDO (T2QORPM)2st antiglare LED desplay withFHD (1920x1060) integrated HD Graphics & Webcam, 2xUSB, 3.0 2xUSB, 2.0 Cardreacer. Audio part VGNHDMI/DP Port, 10x100, 1000Mcomdliant LAN USB key board & mouse internalspl. connectivity BO2 11 b/g/n/ac PL windows etc. with three years on site warranty. (II) 650VA offline UPS system with12Vx7AHx2Nos: 158VAH/SMF batteryto povide20 Min. battery back upwith three year warrantyon UPS &battery from delivery with printer 35 Prov. Transformer Bed plinth for 250KVA S/Stn structure complete with CC 1:6:12 R.R. massonery & plastering etc. a/w Chain link fencing, Angle iron Gate etc. for DTR Fencing. 36 Erection part of 11/.4 KV 250 KVA DISTRIBUTION SUB STATION 37 11/.4 KV 250KVA DTR (REC Sep. ord 11/1976 38 Prov. ST PolePole 9 Mtr. Long W/L 200 Kgs 39 Muff for steel tubular pole with concrete filling 40 X-Arm: [Channel Iron (100x50x5 mm), Length : 2800 mm X 2 Nos] for incomer line 41 MS A.I.(50X50x6 mm), Length: 2800 mm x(1 Nos for LAs ) 42 X-Arm: [Channel Iron (75x40x5 mm), Length : 2800 mm X 4 Nos] for supporting DO fuse unit & GO switch 43 X-Arm: [Channel Iron (100x50x6 mm), Length : 2800 mm X 2 Nos] for transformer bed 44 X-Arm [Channel Iron (100x50x6 mm), Length : 460 mm x 2 Nos for supporting Main Channel of Transformer] 45 MS A.I.(50X50x6 mm), Length: (2800 mm) x 2 No. 46 MS Angle Iron (35X35x5 mm), Length : 460 mm x 2 Nos 47 MS A.I.(50X50x6 mm), Length: (950 mm) x 2 Nos. of bed knee bracing 48 MS Angle Iron (50X50x6 mm), Length : (2800 mm) x2 Nos for Transformer LT Distribution Box and G.O switch fixing assembly 49 MS Angle Iron (50X50x6 mm), Length : (450 mm)x1 Nos for Transformer LT Distribution Box and G.O switch fixing assembly 50 G.O. Switch handle supporting: [C.I. (75x40x6mm), length: 460mm for Transformer LT Distribution Box and G.O switch fixing assembly 51 G.O AB switch unit (11KV,400,663KA) Tripple pole O/D type 52 D.O Fuse unit 53 Surge Arrester, 9 kV Station Class 54 Discs insulator sets (comp. 1 No. Disc: ^^(Porcelain, BS, 12 kV, 90 kN) i/c Dead End Clamps etc.) 55 Stay set complete 56 Staywire (7/3.15mm)( 10 Kg per stay set) 57 Pipe earthing with GI,Charcoal & Salt 58 Prov. LT distribution panel with MCCB (400 A, 36 KA, 4P,1 No.) & SFU (100 A 4 No. rewireble) for 250KVA Trf. as per specification 59 Half clamp (M.S. Flat 50x6) 60 Full clamps (M.S. Flat 50x6) 61 M. S. Nuts & Bolts off sizes (Galvanised coated) [prefarably 16mm Ø or more (with flat and spring washer) 62 Aluminium Thimbles 63 Copper Thimble 64 Danger Plate 65 Barbed wire (REC Sp F 3/1981) 66 LT Cable 3-1/2 core-185mm sq. 67 Alluminium Paint 68 Prov.ACSR, 6/1/3.35 mm 69 prov. HP make AIQ Desktop Model HP 200 G4 with intell core 3-10110U-10 Gen.processor, 8GB DDR4 RAM expenditure upto 16 GB, ITB, HDO (T2QORPM)2st antiglare LED desplay withFHD (1920x1060) integrated HD Graphics & Webcam, 2xUSB, 3.0 2xUSB, 2.0 Cardreacer. Audio part VGNHDMI/DP Port, 10x100, 1000Mcomdliant LAN USB key board & mouse internalspl. connectivity BO2 11 b/g/n/ac PL windows etc. with three years on site warranty. (II) 650VA offline UPS system with12Vx7AHx2Nos: 158VAH/SMF batteryto povide20 Min. battery back upwith three year warrantyon UPS &battery from delivery with printer 70 Prov. Transformer Bed plinth for 250KVA S/Stn structure complete with CC 1:6:12 R.R. massonery & plastering etc. a/w Chain link fencing, Angle iron Gate etc. for DTR Fencing. 71 Supply Part of HT LINE WITH ACSR 6/1/3.35 mm sq. ON STEEL POLES (0.370 KM) 72 ACSR 6/1/3.35 (55mm²) {Includes 3 conductor lengths for 3F and Additional 1% (Sag, Jumpering and wastage} 73 Prov. Steel tubular poles. 9mtrs 74 Muff for steel tubular pole (2000mm long) with concrete filling 75 Cross Arm: [Channel Iron (100x50x6 mm), Length 1270 mm (i/c tolerence of 100mm either side) x2 structure( Run Through structure (Formation Tringle) 76 Angle Iron (50x50x5 mm), Length (2x750) mm x 1 structures (Run Through structure (Formation Tringle) 77 Pole Top Bracket [MSCI:100x50x6mm-100mm] 78 11 kV Pin Insulators (Porcelain, 12 kV, 10 KN): 3 No per pole structure (Run Through structure (Formation Tringle) 79 Belt Set - MS Angle Iron: 50x50x6, Length [1800 mm x 2 No.]for Dead End Structures 80 X-Bracing Set - MS Angle Iron: 50x50x6, Length [2125 mm x2 No.] for Dead End Structures 81 X-Arm(Horizental) - MS C. Iron: 50x50x6, Length [2340 mm x2 No.]for Dead End Structures 82 Discs insulator sets on Dead End structures (comprising 1 No. Disc: ^^(Porcelain, BS, 12 kV, 90 kN) including Dead End Clamps etc.) x (3 No. conductors) x (2 No. sides)for Dead End Structures 83 11 kV Pin Insulators (Porcelain, 12 kV, 10 KN): 3 No per pole structure for Dead End Structures 84 Stay set complete in all respect ( Single Pole-1No. , /D. Pole Structures-4Nos.) 85 Stay Wire (7/3.15 mm) (8.0 kg Per Stay Set) 86 HT earthing set complete (REC Constr. Standared J-1) 87 Single Continous Earth wire (GI, 8 SWG) {alongwith 1 wire lengths for avg. one road crossing @ 20 m and Additional 1% (Sag and wastage)} @ 0.102 kg/m 88 Eye Hook for earth wire 89 Earth Wire Clamp 90 MS Chanel Iron 75x40x6mm, length: 2400mm for road crossing/G.O Switch 91 Half clamp (on D/P dead end str:4Nos; on Run Through Str. 2Nos.) 92 Full clamp (on D/P dead end str:4Nos; on Run Through Str. 2Nos.) 93 Danger Plate (250X200X1.6 mm) 94 M. S. Nuts & Bolts off sizes (Galvanised coated) [prefarably 16mm Ø or more (with flat and spring washer) 95 Barbed wire (REC Sp F 3/1981) 96 G.O AB switch unit (11KV,400,663KA) Tripple pole O/D type 97 Alluminium Paint 98 Erection Part of HT LINE WITH ACSR 6/1/3.35 mm sq. ON STEEL POLES (0.370 KM) 99 ACSR 6/1/3.35 (55mm²) {Includes 3 conductor lengths for 3F and Additional 1% (Sag, Jumpering and wastage} 100 Prov. Steel tubular poles. 9mtrs 101 Muff for steel tubular pole (2000mm long) with concrete filling 102 Cross Arm: [Channel Iron (100x50x6 mm), Length 1270 mm (i/c tolerence of 100mm either side) x2 structure( Run Through structure (Formation Tringle) 103 Angle Iron (50x50x5 mm), Length (2x750) mm x 1 structures (Run Through structure (Formation Tringle) 104 Pole Top Bracket [MSCI:100x50x6mm-100mm] 105 11 kV Pin Insulators (Porcelain, 12 kV, 10 KN): 3 No per pole structure (Run Through structure (Formation Tringle) 106 Belt Set - MS Angle Iron: 50x50x6, Length [1800 mm x 2 No.]for Dead End Structures 107 X-Bracing Set - MS Angle Iron: 50x50x6, Length [2125 mm x2 No.] for Dead End Structures 108 X-Arm(Horizental) - MS C. Iron: 50x50x6, Length [2340 mm x2 No.]for Dead End Structures 109 Discs insulator sets on Dead End structures (comprising 1 No. Disc: ^^(Porcelain, BS, 12 kV, 90 kN) including Dead End Clamps etc.) x (3 No. conductors) x (2 No. sides)for Dead End Structures 110 11 kV Pin Insulators (Porcelain, 12 kV, 10 KN): 3 No per pole structure for Dead End Structures 111 Stay set complete in all respect ( Single Pole-1No. , /D. Pole Structures-4Nos.) 112 Stay Wire (7/3.15 mm) (8.0 kg Per Stay Set) 113 HT earthing set complete (REC Constr. Standared J-1) 114 Single Continous Earth wire (GI, 8 SWG) {alongwith 1 wire lengths for avg. one road crossing @ 20 m and Additional 1% (Sag and wastage)} @ 0.102 kg/m 115 Eye Hook for earth wire 116 Earth Wire Clamp 117 MS Chanel Iron 75x40x6mm, length: 2400mm for road crossing/G.O Switch 118 Half clamp (on D/P dead end str:4Nos; on Run Through Str. 2Nos.) 119 Full clamp (on D/P dead end str:4Nos; on Run Through Str. 2Nos.) 120 Danger Plate (250X200X1.6 mm) 121 M. S. Nuts & Bolts off sizes (Galvanised coated) [prefarably 16mm Ø or more (with flat and spring washer) 122 Barbed wire (REC Sp F 3/1981) 123 G.O AB switch unit (11KV,400,663KA) Tripple pole O/D type 124 Alluminium Paint 125 Supply Part of CT/PT Unit 126 Prov. 11KV CT-PT unit i.e. PT (1 unit, 11KV/110V):CT (3No.10-400/500A) accuracy class 0.5S. 127 Prov, Energy meter (3 phase, 4 wire) HT CT type for Above 128 Pvc Multistrand 4 mm Sq. copper wire with 1 inch GI pipe fir concealing 129 X-Arm: [Channel Iron (100x50x6 mm), Length : 460 mm X 2 Nos] for supporting main channel for CT-PT unit 130 CT-PT Unit Belting and Knee Bracing 131 MS Angle Iron (50x50x5 mm), Length : 2800mmx 4 Nos. 132 MS Angle Iron (35x35x5 mm), Length : 2800mmx 2 Nos. 133 Half clamp (MS Flat 50x6 mm) 134 Full clamp (MS Flat 50x6 mm) 135 Nut & Bolts off size 136 Aluminium Thimble 137 copper Thimble 138 Erection Part of CT/PT Unit 139 Prov. 11KV CT-PT unit i.e. PT (1 unit, 11KV/110V):CT (3No.10-400/500A) accuracy class 0.5S. 140 Prov, Energy meter (3 phase, 4 wire) HT CT type for Above 141 Pvc Multistrand 4 mm Sq. copper wire with 1 inch GI pipe fir concealing 142 X-Arm: [Channel Iron (100x50x6 mm), Length : 460 mm X 2 Nos] for supporting main channel for CT-PT unit 143 CT-PT Unit Belting and Knee Bracing 144 MS Angle Iron (50x50x5 mm), Length : 2800mmx 4 Nos. 145 MS Angle Iron (35x35x5 mm), Length : 2800mmx 2 Nos. 146 Half clamp (MS Flat 50x6 mm) 147 Full clamp (MS Flat 50x6 mm) 148 Nut & Bolts off size 149 Aluminium Thimble 150 copper Thimble 151 Supply Part of THREE PHASE LT LINE WITH ACSR 6/1/2.59 mm sq. ON STEEL POLES(0.390KM) 152 ACSR 6/1/2.59 mm sq. 153 Steel Pole 9 Mtr. Long (1800mm long) 154 Prov. Steel tubular poles. 2mtrs 155 Muff for steel tubular pole 156 Shackle insulators (16KN) (RECD-3/761)(ISS No 1445/1977) 157 D-iron (U-Clamp) (RECD-4/79)(ISS No 7935/1975) 158 Earth Knob 159 LT Saty Set CompleteREC No 31/1983 160 Stay Wire (7/3.15 mm) (8.0 kg Per Stay Set) 161 Prov. Full clamp 162 Coil Earthing (spec J-1/72) 163 G.I.Wire No 8 SWG Earth wire1.03km (Sep.G-2/72) for suporting cable 164 Spool Tie 165 M.S.Nuts & Bolt off Sizes 166 A.I. 75x75x6mm (Length 1.5+0.2Mtr.) 167 Aluminium paint 168 Erection Part of THREE PHASE LT LINE WITH ACSR 6/1/2.59 mm sq. ON STEEL POLES(0.390KM) 169 ACSR 6/1/2.59 mm sq. 170 Steel Pole 9 Mtr. Long (1800mm long) 171 Prov. Steel tubular poles. 2mtrs 172 Muff for steel tubular pole 173 Shackle insulators (16KN) (RECD-3/761)(ISS No 1445/1977) 174 D-iron (U-Clamp) (RECD-4/79)(ISS No 7935/1975) 175 Earth Knob 176 LT Saty Set CompleteREC No 31/1983 177 Stay Wire (7/3.15 mm) (8.0 kg Per Stay Set) 178 Prov. Full clamp 179 Coil Earthing (spec J-1/72) 180 G.I.Wire No 8 SWG Earth wire1.03km (Sep.G-2/72) for suporting cable 181 Spool Tie 182 M.S.Nuts & Bolt off Sizes 183 A.I. 75x75x6mm (Length 1.5+0.2Mtr.) 184 Aluminium paint