Himachal Pradesh State Electricity Board-HPSEB has published Tender For Supply Of Equipment / Material, Design, Erection, Testing, Commissioning, Forprov.Proposed 1 No. Of 11/0.4 Kv, 1000 Kva S/Stn For Ev Charging Station At Hrtc Workshop Dehra Under Esd, Hpsebl,Dehra. Submission Date for this Tender is 31-03-2023. Overhead Line Tenders in kangra Himachal Pradesh. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 27-Mar-2023 | SEOP - 52/2022-23 | Technical Bid | 31-03-2023 |
Sl. No. | Item Description |
1 | 11/0.4 KV 1000KVA Distribution Sub Station |
2 | Prov.11/.4KV Distribution Transformer 1000KVA 11/0.4KV Distribution Transformer O/D type conforming to ISI & BEE Specifications. Provided by HPSEBL |
3 | LT Distribution Panel fitted with Bakelite sheet 1600 Amp copper thimble ACB 1600 amp 3P 50kA-1 No. Make L&T,/Schneider/ ABB only, MCCB 630 amp 50kA 3P of L&T/ Schneider/ABB make only -3 Nos |
4 | Design, Manufacture, Supply of approved OEM make Outdoor 11 kV 3 Way RMU, ( 2 Load Breaker Swicthes+1 VCB) SF6 insulated, 1000 Amps, 21KA for 3 Sec. , BIL 75 KV peak, suitable CT with microprocessor based numerical over current relay (IDMT+Inst.) for protection provided with VCB , fully motorised operationalalongwith 11 KV HT Metering equipments, Trench, Cable Termination Kits (06 No. Touch Proof), fencing etc., complete in all respect. Make of RMU - ABB/Schneider/Siemens/L&T/Reputed make alreadyapproved by HPSEBL. Ring main unit consisting of copper busbar in SF6 insulated,alongwith right angle boot Touch Proof termination Kits, All isolators should have communicable FPI with LED digital display to detect E/F & O/C, surge arrestors.Auxillary PT, Battery Charger etc. for motorised operation of RMU to be provided. All the necessary wirings and space for FRTU to be given along with RMU for future compatibility with SCADA system (Supply of FRTU is not in scope). Mandatory Pre-commissioning test to be conducted at site under supervision of OEM are listed below: (a) MV side - Measurement of Insulation Resistance, High Voltage Test, Relay Test through primary current test kit (b) Earth pit - Earth resistance (c) Tightness of cable through Torque wrench only Contractor shall provide and supply all Tools & Tackles set with each RMU to HPSEBL (Touch Proof termination Kit Torque Wrench, Top Tool Socket Set(8mm to 32mm),, Cable stripping tool, D-Spanner Set, Allen Key Set , Screw Driver Socket Set, Cutting Plier, Cable Knife, Hand Drill, Make :Taparia/Top Tool/Stanley/Bosh., LPG Gas Blow Lamp, 5Kg LPG Cylinder etc.)Battery operated HT Megger 11KV,and other tools & Tackles which will be used at site for erection, testing and Commissioning of all equipments.These tools and tackles shall be handed over to Engineer-In Charge and shall not be taken away. |
5 | Prov. XLPE cable single 3*185mm2 (one spare)Provided by HPSEBL |
6 | Prov. XLPE armed cable 1000mm2 from transformer to LT Panel Provided by HPSEBL |
7 | Transformer Bed around DTR & RMU structure complete in all respect |
8 | Chain link fencing, angle iron gate for the transformer fencing |
9 | Add TPT Charges |
10 | Add Erection Charges |
11 | 11 KV HT Line |
12 | Prov. ACSR 6/1/4.72(100mm2) Provided by HPSEBL |
13 | Prov. ST Pole 11 Mtr.W/L 227 Kgf/m2 Provided by HPSEBL |
14 | Prov. RCC Muff with concerete filling |
15 | Run Thro Structures( ?Formation): on Single pole structures |
16 | Prov.X-arm-Channel Iron 100x50x6,Length 1270mm i/c tolerance of 100 mm either side) x 8 Str. |
17 | Prov.Angle Iron 50x50x6,Length 750mmx2 No. x 8 Str.) |
18 | Prov. Pole Top Bracket (MSCI:100x50x6 mm- 100 mm) |
19 | Prov. 11 KV Pin Insulators (Porcelain,12kV,10 KN): 3 No per str.Provided by HPSEBL |
20 | Dead End Structures: on Double pole structures |
21 | Prov.Belt Set -MS Angle Iron 50x50x6,Length(1800mmx2 No.) |
22 | Prov. X- Bracing Set MS Angle Iron 50x50x6,Length(2125mmx2 No.) |
23 | Prov.X-arm ( Horizontal) -MS Channel Iron 100x50x6,Length 2340mm x 2 Nos. (?Formation) |
24 | Prov. Disc Insulator Sets on Dead End Str.(comprising 1 No. Disc: (Porcelain,BS,12 KV,90 kN) incl Dead End Clamps etc.) x (3 Nos. cond) x (2 No. sides)Provided by HPSEBL |
25 | Prov. 11 KV Pin Insulators (Porcelain,12kV,10 KN): 3 No per str. Provided by HPSEBL |
26 | HT Stay / Guy Arrangement |
27 | Prov. Stay Set Complete in all respect(1 No./Single Pole, 4 No./double pole Str |
28 | Prov. Stay Wire(7/3.15 mm) Provided by HPSEBL |
29 | Earthing |
30 | Prov. HT Earthing set complete |
31 | Prov. Single continous Earth wire (G.I,8 SWG)Provided by HPSEBL |
32 | Prov. Eye Hook for earth wire |
33 | Prov. Earth wire clamp |
34 | Prov.MS C.I. (75X40X6),Length 2400mm for Road crossing |
35 | Prov.Half Clamps |
36 | Prov. Full Clamps |
37 | Prov. Danger Plate (250X200X1.6mm) |
38 | Prov. M.S. Nuts And Bolts Off Sizes |
39 | Prov. Barbed Wire |
40 | Prov. Red Oxide |
41 | Prov. Aluminium Paint |
42 | Add Transportation Charges |
43 | AddErection Charges |
44 | Recod. Of 11 KV HT Line |
45 | Prov. ACSR 7/4.26(100mm2)Provided by HPSEBL |
46 | AddTransportation Charges |
47 | AddErection Charges |
48 | Quantities are mentioned above are tentative and Actual Quantity shall be worked out after Check Survey to be carried out by the successful Tender and detailed Engineering and finalization of Tower location Chart. Payment shall be made as per Approved Bill of Material/Actual Quantities measured at site. |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail