Tender For Strengthening Of Sourceexisting Distribution Network Of Various Wss Under Jsv Sub.Division Theog(Sh:- Replacement Of Existing Rising Main Of Various Dia, Supply And Errection Of Pumping Machinery With Allied Accessories), theog-Himachal Pradesh

Irrigation And Public Health Department has published Tender For Strengthening Of Sourceexisting Distribution Network Of Various Wss Under Jsv Sub.Division Theog(Sh:- Replacement Of Existing Rising Main Of Various Dia, Supply And Errection Of Pumping Machinery With Allied Accessories). Submission Date for this Tender is 10-04-2023. Pump Supply Tenders in theog Himachal Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

36918104
Corrigendum : Tender For Strengthening Of Sourceexisting Distribution Network Of Various Wss Under Jsv Sub.Division Theog(Sh:- Replacement Of Existing Rising Main Of Various Dia, Supply And Errection Of Pumping Machinery With Allied Accessories)
Open Tender
Indian
Himachal Pradesh
theog
10-04-2023

Tender Details

Tender For Strengthening Of Sourceexisting Distribution Network Of Various Wss Under Jsv Sub.Division Theog ( Sh:- Replacement Of Existing Rising Main Of Various Dia, Supply And Errection Of Pumping Machinery With Allied Accessories )

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 29-Mar-2023 Date Extention Date 10-04-2023
2 04-Apr-2023 IE2 Motor Other 10-04-2023

Key Value

Document Fees
INR 2500 /-
EMD
INR 255355.0 /-
Tender Value
Refer document

BOQ Items

Name of Work:Strengthening of SourceExisting Distribution Network of Various WSS Under JSV Sub.Division Theog(SH:- Replacement of existing rising main of various dia, Supply and errection of pumping machinery with allied accessories)
Sl. No. Item Description
1Excavation in foundation,trenches (for pipes & pits) up to all depths in all classification of earth worksuch as pick work, jumper work, saturated soil including bailing or pumping out water, blasting soft/hard rock or chiselingsoft/hard rock where blasting is prohibited in all lifts including trimming &dressing of sides, levelling of beds to correct grade i/c shoring/strutting, planking,timbering & dewatering wherever required, stacking the usable & unusable material/soil separaterly & after laying, jointing & testing of pipes, returning the useable soil in trenches in 15 Cm layers including consolidating of such deposited layer by ramming & watering & then disposing of all surplus excavated soil/unusable material as directed with in all leads & lifts including restoration of unmetalled surfaces to its original condition & including cost of diversion for traffic,night signals, fixing caution boards, crossing over trenches for access to houses, fencing etc. complete in all respects with in all leads & lifts as per directions of Engineer - in - charge.
2Providing, laying, jointing and testing of API pipe of following dia meters confirming to ISO 3183-2012,(latest with upto date amendments) having wall thickness and grade as specified below with bevelled ends and capable of withstanding required test pressure in a random length of 4 to 7 meters, including manufacturing reducers / tapers , all short pieces, bends etc. as per site requirement made from parent tubes . The pipe ends shall be levelled suitable for circumferencial Butt welded joints by electrical arc welding to API pipe, welded in requisite number of weld runs so as to achieve the minimum effective throat thickness of weld conforming to IS: 816-1969 specifications, by using welding electrodesconforming to IS:814-1991.The laying of pipe shall include all operation such as cutting, welding, jointing, fabrication of bends, tees etc. including lowering and laying in excavated trenches to ensure required level including flushing, cleaning and hydraulic testing complete in all respects to the satisfaction of the Engineer in charge. The fabricated bends shall have three or four cuts having its radius not less than five times the dia of pipe. The pipes shall be factory galvanized (zinc coating both inside and outside) as per IS:4736-1986 (with upto date ammendments) with mass of Zinc Coatingshall be as per relevent code .The welding electrodesshall be as per IS 814:2004 of Advani Oerlikon/LT or IS marked make. Negative tolerance in thickness and mass of pipes will not be accepted.The rates also includes entire carriage of material ,flushing ,cleaning and hydroulic testing complete to the best satisfaction and direction of Engineer-in-Charge with in all leads and lifts. (earth work intrenches shall be measured and paid for seprately ) The laying shall confirm to BIS 5822-970 or latest with upto date ammendments to the entire satisfaction of Engineer-In-Charge. MS Flanges after 100 meter length shall be provided including all leads, lifts and carriage of materials at site and as per direction and to the entire satisfaction of the Engineer-In-Charge.
3LWSS Nagpur Chirmu
4API pipe 100 mm dia. withWall thickness of 4.8 mm of L 290 or X 42 Grade Flange table-28 atIst Stage RD 0/0 to RD 590
5API pipe 80 mm dia. withWall thickness of 4.8 mm of L 290 or X 42 Grade Flange table-28 atIInd Stage RD 0/0 to RD 480
6LWSS Down Tiyali
7API pipe 100 mm dia. withWall thickness of 4.8 mm of L 290 or X 42 Grade Flange table-28 atIst Stage RD 0/0 to RD 610
8API pipe 80 mm dia. withWall thickness of 4.8 mm of L 290 or X 42 Grade Flange table-28 atIInd Stage RD 0/0 to RD 440
9LWSS Tungesh Bhaila
10API pipe 125 mm dia. withWall thickness of 4.8 mm of L 290 or X 42 Grade Flange table-28 atIst Stage RD 0/0 to RD 380
11API pipe 100 mm dia. withWall thickness of 4.8 mm of L 290 or X 42 Grade Flange table-28 atIInd Stage RD 0/0 to RD 350
12LWSS Down Tiyali Stage-Ist.
13Supply, erection, testing & commissioning of horizontal spindle,horizontal split casing,radial split Single, /Multistages centrifugal pumpsor combination of pumps, in series/parallel of recommended make such as Mather and Platt/KSB//Becon weir/Kirloskar/ BE/Jyotior any other make approved from IPH Deptt.as per BIS 1520-1980 with upto date ammendments read with BIS 9137-1978 or latest edition to suitable for lifting clear water for under mentioned characteristics with bronze impellers/ priming funnels casing ring and shaft sleaves or bronze. shaft of steel grade-with cast iron casing coupled directly through a flexible coupling on a common C.I./Cast steel base plate (base plate to be from the manufacturers of the pumping unit only) to slip ring/squirrel cage screen protected drip proof induction motor of standard make such as Kirloskar/ Crompton/ Bhel/NGEF/ GEC/Siemen/Jyoti/ABBor any other make approved from IPH Deptt.suitable for operation on 415(+) /-10% volts, 50 cycles/ second, 3 phase AC electric supply. The power of electric motor should be atleast 10% in excess of the maximum power required by the pump in the operation range of (+) 10% and (-)15% of the duty point head. The motor should be as per IS:325-1978with upto date ammendments read with IS:900-1972. It should include cost of bearing nuts, bolts and pointing etc. and should meet the following requirements:- 1x110 = 110 HP
14TotalHead:-577.80 mtrs.
15Discharge of each pump set:- 25.00 cum/Hr per set.
16Dia of R/Main:- 100 mm.
17Length of Rising Main ( In metres).:- 1600 mtrs.
18SITE CONDITIONS& WATER CHARACTERSTICS:-
19Location of Site:-
20The altitude of place in which the motor is intended to work in ordinary service (in metres) :- To be filled by the Engineer Incharge.
21Humidity:-Weather generally remains humid during monsoon season.
22Nature of atmosphere:- As normally encountered in Shivalik ange.
23Detail of quality of water:-Potable drinking water.
24Water free from sand or not :-Free.
25Water corosive or not :-Not.
26Turbidity (if any):-To be filled by the Engineer Incharge.
27NPSH available:- To be filled by the Engineer Incharge.
28Any other information or requirement:-
29OPERATING CONDITIONS:-
30Type of current:- AC three/single phase
31Operating frequency:- 50 HZ
32Rated voltage:- 400 (+/-) 10% volts
33System of earthing if any to to be adopted.:-Double loop earthing as per BIS 3043-1987 latest with upto date ammendments.
34No. of working hours per day:- 8 hours
35Speed of revolution in RPM:- To be quoted by tenderer
36Direction of rotation:- To be quoted by tenderer
37The max. Temp. of cooling air & water in the place in which the motor is intented to work in ordinary service:- 35 Degree Centigrade.
38MOTOR:-
39Ref. to BIS code:- BIS 325-1978 read with BIS 900-1992(latest)with upto date ammendments
40Type of enclosure of motor:-SPDP(as per BIS 4691-1985 (latest)
41Type of duty:-Continuous as per IS-12824-1989 or latest with up to date ammendments
42Mechanical out put in KW:-Suitable for driving centrifugal pumps required for duties specified against pumps.To avoid overloading of motor amargin of about 15-20% may be kept in the rated out putof prime mover.
43Class of insulation:- Class ~B~
44Max.permissible temp.rise of motor reqd. if different from given in B(viii) above:-To be filled by the Engineer Incharge.
45Particulars of test reqd. & where they are to be conducted:-As per terms & conditions
46Particulars as to whether voltage limiting device will be employed:-ATS/Star delta starter, oil immersed, fully automatic to be installed between bus bar and motor shunt capacitor is also proposed to be installed for improving the power factor at site.
47(NOTE:- Star delta starter upto 37.5 KW, ATSbetween 37.5 KW to 50 KW and stator rotor starter with slip ring motor beyond 50 KW).
48Motor whether squirrel cage or slipring :-Squirrel cage/slip-ring (Note:- Squirrel cage upto 65 HP and slipring above 65 HP.
49Details of shaft extension reqd.:-Just sufficient to provide direct drive by flexible couplingto pump.
50Typeofslip-ringgearwhether continuously rated or for starting purposes only & whether to befitted with brush lifting or short circuit arrangements or both if interlocks are rquired.:-Continuously rated for Squirrel cage/ Slipring motor
51Breakway torque in terms of rated load torque & the correspondingbreakway starting current which may be taken from the supply withthe starting apparatus in circuit.:- Breakway torque to be given by the tenderer but the starting current should not exceed 2.5 times of the fullload current.
52Nature of load & any information regarding the driven machine whichhas a bearing upon the torque reqd. during the accelerated period, thekinetic energy of the moving partsto be accelrated & No.of startsduring a specified period.:- Sufficient to work the pump offered
53Where possible fault capacity ofthe system to which the motor is connected.:-The motor should be able to withstand initial current of 2.5 times the rated current for two minutes without sufferingdamages or permanent deformations.
54PUMP :-BIS 1520-1980read with BIS 9137-1978 bothwith up to date ammendments
55Nos of pumps reqd.:-1No. pumps .
56Spare parts required:-For 2 years normal maintenance as recommended by manufacturer.
57Optional fittings reqd.:-Air cock for exahausting air from each stage.
58PUMP OPERATING CONDITIONS:-
59TotalHead:-577.80 mtrs.
60Discharge of each pump set:- 25.00 cum/Hr per set.
61If total head is not known then
62following details be provided:-
63i) Static head ( in mtrs)533.00 Mtrs.
64ii) Minimum depth of water( in mtrs)
65iii) Variation in water level( in mtrs)
66iv) Ground level to max. water level ( in mtrs)
67v) Ground level to delivery point ( in mtrs)
68vi) Pressure in the suction tank(in Kg/cm^2 )
69vii) Pressure in the delivery tank (in Kg/cm^2 )
70Length of R/Main(in metres):-1600 mtrs
71Dia of R/Main (in mm):- 100 mm.
72Drive arrangement:-Direct through flexible coupling on acommon base plate
73Drive type:- Electric driven
74NPSH reqd.:-To be quoted by the tenderer
75Limits of total head in which the pump is reqd. to operate.:-(-) 15% to (+) 10% of total head.
76Suction/delivery size of pump:-To be specified by the tenderer
77Efficiency of pump at:- To be specified by the tenderer
78a) duty head
79b) (+)10 % head
80c) (-) 15 % head
81Material of construction:- To be specified by the tenderer (manufacturer"s certficate to be appended)
82Supply of suitable direct on line/oil immersed star delta /ATS/Starter rotor starter of standard makesuch as MEI/Kilburn/Jyuoti/ Siemens/ Larson and Turbo conforming to BIS-8544-1979 latest with upto date ammendments for squirrel cage/slip-ring motor (make to be specified by the tenderers) mounted on panel board with magnetic type overload release & dash pot, time lag,under voltage release with initial oil filling.1 Each
83Note:-Star delta starter upto 37.5 KW,ATS between 37.5 KW to 50 KW and starter rotor starter with slipring motor beyond 50 KW.
84Providing MS .sheet,16 SWG steel fabricated floor mounted closed(Almirah type) switch board including angle iron post of suitable height and size ISA 40x40x6mm,duly painted, comprising and capable of mounting the following accessories with all internal connections: The drawing of panel board shall be subject to approval of Engineer-in-charge.1 Job
85Ammeter AC supply 100mm dia circular dialAuto electrical AE/IMP/Havells make of suitable range for above motorwith selector switchesconforming to BIS:1248(P-II) 1983 with upto date ammendments. 1 Each
86Voltmeter A.C. Supply 100mm dia circular dia Auto electric/AE/IMP/Havells make of suitable range with selector switches as per IS:4064-1978 with upto date ammendments.1 Each
87ICTP switches with HRC fuses ofKilburn/L&T/Siemens/Standard/Havells make and having Capacity 30% extra of the operational rating as per IS:4064-1978 with upto date ammendments immediately after the power meter of HPSEB. ICTP SWITCHES: I) Type :ii)Make:- iii)CapacityAmp.1 Set
88Bus bar chamber having three copper bars of suitable rating for full length equal to the width of the board for three live phases and one copper bar of half the rating of full length for neutral phase as per BIS:8084-1976 and 11353-1985 read with 5578-1985 with upto date ammendments.BUS BAR CHAMBER:-i)Type: - . ii)Make:- iii)Rating 1 Set
89ACB/M.C.B/Oil Circuit Breaker of suitable capacity of Kilburn/ L&T/ MEI/GEC/Standard make on incoming feeder for motor offeredby the tenderer conforming to BIS-2516-1985 latest with upto date ammendments with initial oil filling whenever required and neutral linked under voltage release. 1 Each
90Three phase Indicating lamps complete with toggle switches for individual motors as per IS 3452(P-I&II) with upto date ammendments. THREE PHASE INDICATOR:- i) Type:-ii) Make:- iii) Capacity.1 Set
91Earth leakage circuit breaker relay of recommended make such as (Kilburn/L&T/MEI/ GEC) conformingto BIS- 2516-1977 withuptodate ammendment and of suitable range which should have control box operating handle and trip/reset bush button on/off indicators, re-indicating off spring condition of the circuit breaker for over current protection.The circuit should be equipped with magnet thermal release with metallic tape etc. It shouldalso befitted with earth fault for tripping of breaker on occurrence of earth fault on off breaker load side end. ELCB/ELR:- I)Make :-(CEI approved). ii)Type: iii) Range. 1 Each
92Providing Hour run meter of reputed make for four digit capacity conforming to BIS:722(Latest edition)/recommendations.HOUR RUN METER:- I) Type:-ii)Make:- iii)Capacity:- Hrs. 1 Each
93Suitable three phase voltage monitor relay with all protection and usual indicator and electric siren against single phasing No/ low voltage,high voltage& overloading and phase voltage difference as per IS:3842 with upto date ammendments. 1 Each
94Change over switch of reputed make and suitable capacity1 Each
95Single phase preventor of reputed make and suitable capacity conforming to IS:1248 (P-V)-1983 with upto date ammendments.1 Each
96Supplyof Kirloskar/Leader/KSB/fouress/pellicon make of Cast steel double flangedsluice valve having size nominal delivery size of pump and capable of withstanding nominal seat pressure as mentioned in item No.1 (a) & conforming to BIS/API-standards with upto date ammendments for delivery line of pump.1 Each
97(Note:- The sluice valve shall conform to BIS-780-1984 latest with upto date ammedments. However, if the seat pressure exceeds the limits prescribed in BIS: 780 then the sluice valves shall be of Cast steel conforming to class 150 ASA (Seat pressure 21 kg/cm^2 ) or Class 300- ASA )Seat pressure 52 kg/cm^2) as per BS: 1414(API -600).
98Supply of Kirloskar/Kilburn/IVC/Fouress/Gled/BHEL/Leader/Bir/Kartar/ Pelicon make of Cast Iron/Cast Steel double flanged swing check type reflux valve for delivery line of pump having bye pass arrangement & sizeone size higher than the normal delivery size of .pump and capable of withstanding nominal seat pressureas mentioned in item No.1 (a) & comforming toBIS/API standard with upto date ammendments for delivery line of pump.1 Each
99NOTE:- The reflux valve shall conform to BIS 5312-1984 (part I) latest with up to date ammendments. However if the seat pressure exceeds the limits prescribed in BIS 5312then the reflux valves shall be of cast steel conforming to class 150 ASA (Seat pressure 21 kg/cm^2)or Class 300 ASA (Seat pressure 52 kg/cm^2) as per BIS: 1414(API -600).
100Supply of Kirloskar/Kilburn/IVC/Fouress/Gled/BHEL/Leader/Bir/Kartar/ Pelicon make of suitable size Cast Steel double flanged swing check type reflux valve having bye pass arrangement & sizeequal to dia of Rising main as mentioned in item No.1 (c) for with standing normal seat pressure as per item No.1(a). 1 Each
101NOTE:- The reflux valve shall conform to BIS 5312-1984 (part I) latest with up to date ammendments. However if the seat pressure exceeds the limits prescribed in BIS 5312then the reflux valves shall be of cast steel conforming toClass 150 ASA ((Seat pressure 21 kg/cm^2class 300 ASA (Seat pressure 52 kg/cm^2) as per BS: 1414(API -600).
102Supply of Kirloskar/Jyoti/ Standard/Kilburn/Bir/ Kartar make cast iron flanged screwed type foot valve ( in case suction lift is involved) for suction pipe having size one or two size larger than suction size of pump such that velocity of flow is not more than 2.50 mtr/sec. with strainerhaving net area of its openings equal to three to four times of X-sectional area of flow in suction pipe conforming to BIS- 4038-1986 or latestwith up to date ammendments including all leads and lifts.1 Each
103Supply of Kirloskar/Kilburn/IVC/Fouress/Gled/BHEL/Leader/Bir/Kartar/ Pelicon make of Cast Iron double flanged sluice valve ( in case suction is +tive) for suction pipe havingsizeone or two size larger than suction size of pumpsuch that velocity of flow in suction pipe is not more than 2.50 mtrs/ sec. with stainerhet area of its openingequal to three to four timjes of X-sectional area of flow in suction pipe and conforming to BIS/API standards with upto date ammendments i/c all leads and lift and as directed by the Engineer-in-charge.1 Each
104NOTE:- The reflux valve shall conform to BIS 5312-1984 (part I) latest with up to date ammendments. However if the seat pressure exceeds the limits prescribed in BIS 5312then the reflux valves shall be of cast steel conforming to class 150 ASA (Seat pressure 21 kg/cm^2)or Class 300 ASA (Seat pressure 52 kg/cm^2) as per BIS: 1414(API -600).
105Prov. laying jointing and testing at site suitable size copper PVC insulated armoured power three and half core cable conforming to BIS 1554 (Part.I) 1988 or latest upto date ammendments or siemens/Gloster/ ICC/ EICO/National/IEC make from meter of HPSEB to circuit breaker and from circuit breaker to bus bar switch and starter (one cable carrying all three phases) including all other electrical equipment/accessories, such as thimbles, flexble pipe, solder, nuts and bolts, cable glands etc. laid in pipes or trenches under floor. The type, size and make will be subject to approval of HPSEB authorities. In case ofnon acceptance by HPSEB authorities it shall have to be replaced by the tenderer free of cost i/c cost of carriage of material in all leads and lifts and as directed by the Engineer-in-charge. 1 Job
106Prov. laying jointing and testing at site suitable size copper PVC insulated armoured power threecore cable conforming to BIS 1554 (Part.I) 1988 or latest upto date ammendments or siemens/Gloster/ ICC/ EICO/ National/ IEC make from meter of HPSEB to circuit breaker and from circuit breaker to bus bar switch and starter (one cable carrying all three phases) including all other electrical equipment/accessories, such as thimbles, flexble pipe, solder, nuts and bolts, cable glands etc. laid in pipes or trenches under floor. The type, size and make will be subject to approval of HPSEB authorities. In case ofnon acceptance by HPSEB authorities it shall have to be replaced by the tenderer free of cost i/c cost of carriage of material in all leads and lifts and as directed by the Engineer-in-charge. 1 Job
107Providing and laying double loop earthing with copper plate 600mmx600mmx3mm thick electrode complete with material such as charcoal and commonsalt G.I.Pipes thimbles nuts and bolts,digging of pits, G.I.Wiring and 25x5mm copper strips of required capacity conforming to BIS 3043-1987 latest with upto dateammendments suitable for above motors and other electrical equipmentsi/c cost of carriage of material in all leads and liftsand as directed by the Engineer-in-charge.1 Job
108Supply and errection of floor/wall mounted power factor shunt capacitor conforming to BIS:2834-1986 or latest with upto date ammendments of BHEL/GEC/Machneil/Mager/Bajaj/L&T make to raise the prevailing power factor at site to 0.95 for direct connection to induction motor individually of required KVAR according to HP of motor offered including cable Siemens/Gloster/ICC make from busbar chamber to capacitor & also including L&T/Kilburn/Standard/Siemens/Havells make ICTP switches conforming to BIS:4064-1978 or latest with HRC fuses (Range to be specified by the tenderer) i/c cost of carriage of material in all leads and lifts & as directed by Engineer-in-charge.1 L.S.
109Supply of 100mm circular dia pressure gauge of suitable range & standard make such as Fiebig/Bourden/ Precision/PREGA with all accessories such as stop cock, copper tubing etc.conformfing to BIS: 3624-1987 or latest with upto date ammendments. 1 Each
110Prov. and fixing double flanged suction, delivery pipe and common header considering site requirement, NPSH required and available & common header having area equal to two times the area of delivery branch of pump including tapers, flanges, rubber gaskets 3mm thick as per BIS:2712-1978 nuts and bolts as per 1264-1983 & special upto 5mtrs. away from the outer wall of pump house as per layout drawings approved by Engneer-in-charge. The pipes shall be capable of with standing minimum 1.5 times the total pressure as indicated in item No.1(a) or total dynamic pressure+ surge pressure whichever is more. The size of suction pipe shall be one or two sizes larger than the suction size of pump such that velocity of flow in suction pipe is not more than 2.50 mtrs./sec. & delivery pipe shall be of size one size larger than nominal delivery size of pump i/c cost of carriage of material in all leads and lifts and as per directed by the Engineer-in-charge.1 Job
111NOTE:- Actual laying to be done as per final drawings to be approved by the Engineer-in-charge.
112Supply of antivibration pads conforming to BIS 6337-1971 or latest with upto date ammendments of suitable size for above machinery. 1 Each
113Errection of allequipments including cost of tees, bends, tapers and any other fittings required as per site conditions & as per direction of Engineer-in-Charge. 1 Job
114LWSS Down Tiyali Stage-IInd.
115Supply, erection, testing & commissioning of horizontal spindle,horizontal split casing,radial split Single, /Multistages centrifugal pumpsor combination of pumps, in series/parallel of recommended make such as Mather and Platt/KSB//Becon weir/Kirloskar/ BE/Jyotior any other make approved from IPH Deptt.as per BIS 1520-1980 with upto date ammendments read with BIS 9137-1978 or latest edition to suitable for lifting clear water for under mentioned characteristics with bronze impellers/ priming funnels casing ring and shaft sleaves or bronze. shaft of steel grade-with cast iron casing coupled directly through a flexible coupling on a common C.I./Cast steel base plate (base plate to be from the manufacturers of the pumping unit only) to slip ring/squirrel cage screen protected drip proof induction motor of standard make such as Kirloskar/ Crompton/ Bhel/NGEF/ GEC/Siemen/Jyoti/ABBor any other make approved from IPH Deptt.suitable for operation on 415(+) /-10% volts, 50 cycles/ second, 3 phase AC electric supply. The power of electric motor should be atleast 10% in excess of the maximum power required by the pump in the operation range of (+) 10% and (-)15% of the duty point head. The motor should be as per IS:325-1978with upto date ammendments read with IS:900-1972. It should include cost of bearing nuts, bolts and pointing etc. and should meet the following requirements:-1x120 = 120 HP
116TotalHead:-634.00 mtrs.
117Discharge of each pump set:- 25.00 cum/Hr per set.
118Dia of R/Main:- 80 mm.
119Length of Rising Main ( In metres).:- 2300 mtrs.
120SITE CONDITIONS& WATER CHARACTERSTICS:-
121Location of Site:-
122The altitude of place in which the motor is intended to work in ordinary service (in metres) :- To be filled by the Engineer Incharge.
123Humidity:-Weather generally remains humid during monsoon season.
124Nature of atmosphere:- As normally encountered in Shivalik ange.
125Detail of quality of water:-Potable drinking water.
126Water free from sand or not :-Free.
127Water corosive or not :-Not.
128Turbidity (if any):-To be filled by the Engineer Incharge.
129NPSH available:- To be filled by the Engineer Incharge.
130Any other information or requirement:-
131OPERATING CONDITIONS:-
132Type of current:- AC three/single phase
133Operating frequency:- 50 HZ
134Rated voltage:- 400 (+/-) 10% volts
135System of earthing if any to to be adopted.:-Double loop earthing as per BIS 3043-1987 latest with upto date ammendments.
136No. of working hours per day:- 8 hours
137Speed of revolution in RPM:- To be quoted by tenderer
138Direction of rotation:- To be quoted by tenderer
139The max. Temp. of cooling air & water in the place in which the motor is intented to work in ordinary service:- 35 Degree Centigrade.
140MOTOR:-
141Ref. to BIS code:- BIS 325-1978 read with BIS 900-1992(latest)with upto date ammendments
142Type of enclosure of motor:-SPDP(as per BIS 4691-1985 (latest)
143Type of duty:-Continuous as per IS-12824-1989 or latest with up to date ammendments
144Mechanical out put in KW:-Suitable for driving centrifugal pumps required for duties specified against pumps.To avoid overloading of motor amargin of about 15-20% may be kept in the rated out putof prime mover.
145Class of insulation:- Class ~B~
146Max.permissible temp.rise of motor reqd. if different from given in B(viii) above:-To be filled by the Engineer Incharge.
147Particulars of test reqd. & where they are to be conducted:-As per terms & conditions
148Particulars as to whether voltage limiting device will be employed:-ATS/Star delta starter, oil immersed, fully automatic to be installed between bus bar and motor shunt capacitor is also proposed to be installed for improving the power factor at site.
149(NOTE:- Star delta starter upto 37.5 KW, ATSbetween 37.5 KW to 50 KW and stator rotor starter with slip ring motor beyond 50 KW).
150Motor whether squirrel cage or slipring :-Squirrel cage/slip-ring (Note:- Squirrel cage upto 65 HP and slipring above 65 HP.
151Details of shaft extension reqd.:-Just sufficient to provide direct drive by flexible couplingto pump.
152Typeofslip-ringgearwhether continuously rated or for starting purposes only & whether to befitted with brush lifting or short circuit arrangements or both if interlocks are rquired.:-Continuously rated for Squirrel cage/ Slipring motor
153Breakway torque in terms of rated load torque & the correspondingbreakway starting current which may be taken from the supply withthe starting apparatus in circuit.:- Breakway torque to be given by the tenderer but the starting current should not exceed 2.5 times of the fullload current.
154Nature of load & any information regarding the driven machine whichhas a bearing upon the torque reqd. during the accelerated period, thekinetic energy of the moving partsto be accelrated & No.of startsduring a specified period.:- Sufficient to work the pump offered
155Where possible fault capacity ofthe system to which the motor is connected.:-The motor should be able to withstand initial current of 2.5 times the rated current for two minutes without sufferingdamages or permanent deformations.
156PUMP :-BIS 1520-1980read with BIS 9137-1978 bothwith up to date ammendments
157Nos of pumps reqd.:-1No. pumps .
158Spare parts required:-For 2 years normal maintenance as recommended by manufacturer.
159Optional fittings reqd.:-Air cock for exahausting air from each stage.
160PUMP OPERATING CONDITIONS:-
161TotalHead:-634.00 mtrs.
162Discharge of each pump set:- 25.00 cum/Hr per set.
163If total head is not known then
164following details be provided:-
165i) Static head ( in mtrs) 538.34Mtrs.
166ii) Minimum depth of water( in mtrs)
167iii) Variation in water level( in mtrs)
168iv) Ground level to max. water level ( in mtrs)
169v) Ground level to delivery point ( in mtrs)
170vi) Pressure in the suction tank(in Kg/cm^2 )
171vii) Pressure in the delivery tank (in Kg/cm^2 )
172Length of R/Main(in metres):-2300 mtrs
173Dia of R/Main (in mm):- 80 mm.
174Drive arrangement:-Direct through flexible coupling on acommon base plate
175Drive type:- Electric driven
176NPSH reqd.:-To be quoted by the tenderer
177Limits of total head in which the pump is reqd. to operate.:-(-) 15% to (+) 10% of total head.
178Suction/delivery size of pump:-To be specified by the tenderer
179Efficiency of pump at:- To be specified by the tenderer
180a) duty head
181b) (+)10 % head
182c) (-) 15 % head
183Material of construction:- To be specified by the tenderer (manufacturer"s certficate to be appended) 1 Each
184Supply of suitable direct on line/oil immersed star delta /ATS/Starter rotor starter of standard makesuch as MEI/Kilburn/Jyuoti/ Siemens/ Larson and Turbo conforming to BIS-8544-1979 latest with upto date ammendments for squirrel cage/slip-ring motor (make to be specified by the tenderers) mounted on panel board with magnetic type overload release & dash pot, time lag,under voltage release with initial oil filling. 1 Each
185Note:-Star delta starter upto 37.5 KW,ATS between 37.5 KW to 50 KW and starter rotor starter with slipring motor beyond 50 KW.
186Providing MS .sheet,16 SWG steel fabricated floor mounted closed(Almirah type) switch board including angle iron post of suitable height and size ISA 40x40x6mm,duly painted, comprising and capable of mounting the following accessories with all internal connections: The drawing of panel board shall be subject to approval of Engineer-in-charge.1 Job
187Ammeter AC supply 100mm dia circular dialAuto electrical AE/IMP/Havells make of suitable range for above motorwith selector switchesconforming to BIS:1248(P-II) 1983 with upto date ammendments. 1 Each
188Voltmeter A.C. Supply 100mm dia circular dia Auto electric/AE/IMP/Havells make of suitable range with selector switches as per IS:4064-1978 with upto date ammendments. 1 Each
189ICTP switches with HRC fuses ofKilburn/L&T/Siemens/Standard/Havells make and having Capacity 30% extra of the operational rating as per IS:4064-1978 with upto date ammendments immediately after the power meter of HPSEB. ICTP SWITCHES: I) Type :ii)Make:- iii)CapacityAmp.1 Set
190Bus bar chamber having three copper bars of suitable rating for full length equal to the width of the board for three live phases and one copper bar of half the rating of full length for neutral phase as per BIS:8084-1976 and 11353-1985 read with 5578-1985 with upto date ammendments.BUS BAR CHAMBER:-i)Type: - . ii)Make:- iii)Rating 1 Set
191ACB/M.C.B/Oil Circuit Breaker of suitable capacity of Kilburn/ L&T/ MEI/GEC/Standard make on incoming feeder for motor offeredby the tenderer conforming to BIS-2516-1985 latest with upto date ammendments with initial oil filling whenever required and neutral linked under voltage release. 1 Each
192Three phase Indicating lamps complete with toggle switches for individual motors as per IS 3452(P-I&II) with upto date ammendments. THREE PHASE INDICATOR:- i) Type:-ii) Make:- iii) Capacity.1 Set
193Earth leakage circuit breaker relay of recommended make such as (Kilburn/L&T/MEI/ GEC) conformingto BIS- 2516-1977 withuptodate ammendment and of suitable range which should have control box operating handle and trip/reset bush button on/off indicators, re-indicating off spring condition of the circuit breaker for over current protection.The circuit should be equipped with magnet thermal release with metallic tape etc. It shouldalso befitted with earth fault for tripping of breaker on occurrence of earth fault on off breaker load side end. ELCB/ELR:- I)Make :-(CEI approved). ii)Type: iii) Range. 1 Each
194Providing Hour run meter of reputed make for four digit capacity conforming to BIS:722(Latest edition)/recommendations. HOUR RUN METER:- I) Type:-ii)Make:- iii)Capacity:- Hrs. 1 Each
195Suitable three phase voltage monitor relay with all protection and usual indicator and electric siren against single phasing No/ low voltage,high voltage& overloading and phase voltage difference as per IS:3842with upto date ammendments.1 Each
196Change over switch of reputed make and suitable capacity 1 Each
197Single phase preventor of reputed make and suitable capacity conforming to IS:1248 (P-V)-1983 with upto date ammendments.1 Each
198Supplyof Kirloskar/Leader/KSB/fouress/pellicon make of Cast steel double flangedsluice valve having size nominal delivery size of pump and capable of withstanding nominal seat pressure as mentioned in item No.10 (a)& conforming to BIS/API-standards with upto date ammendments for delivery line of pump.1 Each
199(Note:- The sluice valve shall conform to BIS-780-1984 latest with upto date ammedments. However, if the seat pressure exceeds the limits prescribed in BIS: 780 then the sluice valves shall be of Cast steel conforming to class 150 ASA (Seat pressure 21 kg/cm^2 ) or Class 300- ASA )Seat pressure 52 kg/cm^2) as per BS: 1414(API -600).
200Supply of Kirloskar/Kilburn/IVC/Fouress/Gled/BHEL/Leader/Bir/Kartar/ Pelocon make of Cast Iron/Cast Steel double flanged swing check type reflux valve for delivery line of pump having bye pass arrangement & sizeone size higher than the normal delivery size of .pump and capable of withstanding nominal seat pressureas mentioned in item No.1 0(a) & comforming toBIS/API standard with upto date ammendments for delivery line of pump.1 Each
201NOTE:- The reflux valve shall conform to BIS 5312-1984 (part I) latest with up to date ammendments. However if the seat pressure exceeds the limits prescribed in BIS 5312then the reflux valves shall be of cast steel conforming to class 150 ASA (Seat pressure 21 kg/cm^2)or Class 300 ASA (Seat pressure 52 kg/cm^2) as per BIS: 1414(API -600).
202Supply of Kirloskar/Kilburn/IVC/Fouress/Gled/BHEL/Leader/Bir/Kartar/ Pelocon make of suitable size Cast Steel double flanged swing check type reflux valve having bye pass arrangement & sizeequal to dia of Rising main as mentioned in item No.10 (c) for with standing normal seat pressure as per item No.10(a). 1 Each
203NOTE:- The reflux valve shall conform to BIS 5312-1984 (part I) latest with up to date ammendments. However if the seat pressure exceeds the limits prescribed in BIS 5312then the reflux valves shall be of cast steel conforming to Class 150 ASA ((Seat pressure 21 kg/cm^2 class 300 ASA (Seat pressure 52 kg/cm^2) as per BS: 1414(API -600).
204Supply of Kirloskar/Jyoti/ Standard/Kilburn/Bir/ Kartar make cast iron flanged screwed type foot valve ( in case suction lift is involved) for suction pipe having size one or two size larger than suction size of pump such that velocity of flow is not more than 2.50 mtr/sec. with strainerhaving net area of its openings equal to three to four times of X-sectional area of flow in suction pipe conforming to BIS- 4038-1986 or latestwith up to date ammendments including all leads and lifts.1 Each
205Supply of Kirloskar/Kilburn/IVC/Fouress/Gled/BHEL/Leader/Bir/Kartar/ Pelocon make of Cast Iron double flanged sluice valve ( in case suction is +tive) for suction pipe havingsizeone or two size larger than suction size of pumpsuch that velocity of flow in suction pipe is not more than 2.50 mtrs/ sec. with stainerhet area of its openingequal to three to four timjes of X-sectional area of flow in suction pipe and conforming to BIS/API standards with upto date ammendments i/c all leads and lift and as directed by the Engineer-in-charge. 1 Each
206NOTE:- The reflux valve shall conform to BIS 5312-1984 (part I) latest with up to date ammendments. However if the seat pressure exceeds the limits prescribed in BIS 5312then the reflux valves shall be of cast steel conforming to class 150 ASA (Seat pressure 21 kg/cm^2)or Class 300 ASA (Seat pressure 52 kg/cm^2) as per BIS: 1414(API -600).
207Prov. laying jointing and testing at site suitable size copper PVC insulated armoured power three and half core cable conforming to BIS 1554 (Part.I) 1988 or latest upto date ammendments or siemens/Gloster/ ICC/ EICO/National/IEC make from meter of HPSEB to circuit breaker and from circuit breaker to bus bar switch and starter (one cable carrying all three phases) including all other electrical equipment/accessories, such as thimbles, flexble pipe, solder, nuts and bolts, cable glands etc. laid in pipes or trenches under floor. The type, size and make will be subject to approval of HPSEB authorities. In case ofnon acceptance by HPSEB authorities it shall have to be replaced by the tenderer free of cost i/c cost of carriage of material in all leads and lifts and as directed by the Engineer-in-charge.1 Job
208Prov. laying jointing and testing at site suitable size copper PVC insulated armoured power threecore cable conforming to BIS 1554 (Part.I) 1988 or latest upto date ammendments or siemens/Gloster/ ICC/ EICO/ National/ IEC make from meter of HPSEB to circuit breaker and from circuit breaker to bus bar switch and starter (one cable carrying all three phases) including all other electrical equipment/ accessories, such as thimbles, flexble pipe, solder, nuts and bolts, cable glands etc. laid in pipes or trenches under floor. The type, size and make will be subject to approval of HPSEB authorities. In case ofnon acceptance by HPSEB authorities it shall have to be replaced by the tenderer free of cost i/c cost of carriage of material in all leads and lifts and as directed by the Engineer-in-charge.1 Job
209Providing and laying double loop earthing with copper plate 600mmx600mmx3mm thick electrode complete with material such as charcoal and commonsalt G.I.Pipes thimbles nuts and bolts,digging of pits, G.I.Wiring and 25x5mm copper strips of required capacity conforming to BIS 3043-1987 latest with upto dateammendments suitable for above motors and other electrical equipmentsi/c cost of carriage of material in all leads and liftsand as directed by the Engineer-in-charge. 1 Job
210Supply and errection of floor/wall mounted power factor shunt capacitor conforming to BIS:2834-1986 or latest with upto date ammendments of BHEL/GEC/Machneil/Mager/Bajaj/L&T make to raise the prevailing power factor at site to 0.95 for direct connection to induction motor individually of required KVAR according to HP of motor offered including cable Siemens/Gloster/ICC make from busbar chamber to capacitor & also including L&T/Kilburn/Standard/Siemens/Havells make ICTP switches conforming to BIS:4064-1978 or latest with HRC fuses (Range to be specified by the tenderer) i/c cost of carriage of material in all leads and lifts & as directed by Engineer-in-charge. 1 L.S.
211Supply of 100mm circular dia pressure gauge of suitable range & standard make such as Fiebig/Bourden/ Precision/PREGA with all accessories such as stop cock, copper tubing etc.conformfing to BIS: 3624-1987 or latest with upto date ammendments.1 Each
212Prov. and fixing double flanged suction, delivery pipe and common header considering site requirement, NPSH required and available & common header having area equal to two times the area of delivery branch of pump including tapers, flanges, rubber gaskets 3mm thick as per BIS:2712-1978 nuts and bolts as per 1264-1983 & special upto 5mtrs. away from the outer wall of pump house as per layout drawings approved by Engneer-in-charge. The pipes shall be capable of with standing minimum 1.5 times the total pressure as indicated in item No.1(a) or total dynamic pressure+ surge pressure whichever is more. The size of suction pipe shall be one or two sizes larger than the suction size of pump such that velocity of flow in suction pipe is not more than 2.50 mtrs./sec. & delivery pipe shall be of size one size larger than nominal delivery size of pump i/c cost of carriage of material in all leads and lifts and as per directed by the Engineer-in-charge. 1 Job
213NOTE:- Actual laying to be done as per final drawings to be approved by the Engineer-in-charge.
214Supply of antivibration pads conforming to BIS 6337-1971 or latest with upto date ammendments of suitable size for above machinery.1 Each
215Errection of allequipments including cost of tees, bends, tapers and any other fittings required as per site conditions & as per direction of Engineer-in-Charge.1 Job
216LWSS Galu Khurd Stage-Ist.
217Supply, erection, testing & commissioning of horizontal spindle,horizontal split casing,radial split Single, /Multistages centrifugal pumpsor combination of pumps, in series/parallel of recommended make such as Mather and Platt/KSB//Becon weir/Kirloskar/ BE/Jyotior any other make approved from IPH Deptt.as per BIS 1520-1980 with upto date ammendments read with BIS 9137-1978 or latest edition to suitable for lifting clear water for under mentioned characteristics with bronze impellers/ priming funnels casing ring and shaft sleaves or bronze. shaft of steel grade-with cast iron casing coupled directly through a flexible coupling on a common C.I./Cast steel base plate (base plate to be from the manufacturers of the pumping unit only) to slip ring/squirrel cage screen protected drip proof induction motor of standard make such as Kirloskar/ Crompton/ Bhel/NGEF/ GEC/Siemen/Jyoti/ABBor any other make approved from IPH Deptt.suitable for operation on 415(+) /-10% volts, 50 cycles/ second, 3 phase AC electric supply. The power of electric motor should be atleast 10% in excess of the maximum power required by the pump in the operation range of (+) 10% and (-)15% of the duty point head. The motor should be as per IS:325-1978with upto date ammendments read with IS:900-1972. It should include cost of bearing nuts, bolts and pointing etc. and should meet the following requirements:- 1x75 = 75 HP
218TotalHead:-301.00 mtrs.
219Discharge of each pump set:- 9.84 cum/Hr per set.
220Dia of R/Main:- 100 mm.
221Length of Rising Main ( In metres).:- 1200 mtrs.
222SITE CONDITIONS& WATER CHARACTERSTICS:-
223Location of Site:-
224The altitude of place in which the motor is intended to work in ordinary service (in metres) :- To be filled by the Engineer Incharge.
225Humidity:-Weather generally remains humid during monsoon season.
226Nature of atmosphere:- As normally encountered in Shivalik ange.
227Detail of quality of water:-Potable drinking water.
228Water free from sand or not :-Free.
229Water corosive or not :-Not.
230Turbidity (if any):-To be filled by the Engineer Incharge.
231NPSH available:- To be filled by the Engineer Incharge.
232Any other information or requirement:-
233OPERATING CONDITIONS:-
234Type of current:- AC three/single phase
235Operating frequency:- 50 HZ
236Rated voltage:- 400 (+/-) 10% volts
237System of earthing if any to to be adopted.:-Double loop earthing as per BIS 3043-1987 latest with upto date ammendments.
238No. of working hours per day:- 8 hours
239Speed of revolution in RPM:- To be quoted by tenderer
240Direction of rotation:- To be quoted by tenderer
241The max. Temp. of cooling air & water in the place in which the motor is intented to work in ordinary service:- 35 Degree Centigrade.
242MOTOR:-
243Ref. to BIS code:-BIS 325-1978 read with BIS 900-1992(latest)with upto date ammendments
244Type of enclosure of motor:-SPDP(as per BIS 4691-1985 (latest)
245Type of duty:-Continuous as per IS-12824-1989 or latest with up to date ammendments
246Mechanical out put in KW:-Suitable for driving centrifugal pumps required for duties specified against pumps.To avoid overloading of motor amargin of about 15-20% may be kept in the rated out putof prime mover.
247Class of insulation:- Class ~B~
248Max.permissible temp.rise of motor reqd. if different from given in B(viii) above:-To be filled by the Engineer Incharge.
249Particulars of test reqd. & where they are to be conducted:-As per terms & conditions
250Particulars as to whether voltage limiting device will be employed:-ATS/Star delta starter, oil immersed, fully automatic to be installed between bus bar and motor shunt capacitor is also proposed to be installed for improving the power factor at site.
251(NOTE:- Star delta starter upto 37.5 KW, ATSbetween 37.5 KW to 50 KW and stator rotor starter with slip ring motor beyond 50 KW).
252Motor whether squirrel cage or slipring :-Squirrel cage/slip-ring (Note:- Squirrel cage upto 65 HP and slipring above 65 HP.
253Details of shaft extension reqd.:-Just sufficient to provide direct drive by flexible couplingto pump.
254Typeofslip-ringgearwhether continuously rated or for starting purposes only & whether to befitted with brush lifting or short circuit arrangements or both if interlocks are rquired.:-Continuously rated for Squirrel cage/ Slipring motor
255Breakway torque in terms of rated load torque & the correspondingbreakway starting current which may be taken from the supply withthe starting apparatus in circuit.:- Breakway torque to be given by the tenderer but the starting current should not exceed 2.5 times of the fullload current.
256Nature of load & any information regarding the driven machine whichhas a bearing upon the torque reqd. during the accelerated period, thekinetic energy of the moving partsto be accelrated & No.of startsduring a specified period.:- Sufficient to work the pump offered
257Where possible fault capacity ofthe system to which the motor is connected.:-The motor should be able to withstand initial current of 2.5 times the rated current for two minutes without sufferingdamages or permanent deformations.
258PUMP :-BIS 1520-1980read with BIS 9137-1978 bothwith up to date ammendments
259Nos of pumps reqd.:-1No. pumps .
260Spare parts required:-For 2 years normal maintenance as recommended by manufacturer.
261Optional fittings reqd.:-Air cock for exahausting air from each stage.
262PUMP OPERATING CONDITIONS:-
263TotalHead:-301.00 mtrs.
264Discharge of each pump set:- 9.84 cum/Hr per set.
265If total head is not known then
266following details be provided:-
267i) Static head ( in mtrs) 273.04 Mtrs.
268ii) Minimum depth of water( in mtrs)
269iii) Variation in water level( in mtrs)
270iv) Ground level to max. water level ( in mtrs)
271v) Ground level to delivery point ( in mtrs)
272vi) Pressure in the suction tank(in Kg/cm^2 )
273vii) Pressure in the delivery tank (in Kg/cm^2 )
274Length of R/Main(in metres):-1200 mtrs
275Dia of R/Main (in mm):- 100 mm.
276Drive arrangement:-Direct through flexible coupling on acommon base plate
277Drive type:- Electric driven
278NPSH reqd.:-To be quoted by the tenderer
279Limits of total head in which the pump is reqd. to operate.:-(-) 15% to (+) 10% of total head.
280Suction/delivery size of pump:-To be specified by the tenderer
281Efficiency of pump at:- To be specified by the tenderer
282a) duty head
283b) (+)10 % head
284c) (-) 15 % head
285Material of construction:- To be specified by the tenderer (manufacturer"s certficate to be appended)
286Supply of suitable direct on line/oil immersed star delta /ATS/Starter rotor starter of standard makesuch as MEI/Kilburn/Jyuoti/ Siemens/ Larson and Turbo conforming to BIS-8544-1979 latest with upto date ammendments for squirrel cage/slip-ring motor (make to be specified by the tenderers) mounted on panel board with magnetic type overload release & dash pot, time lag,under voltage release with initial oil filling. 1 Each
287Note:-Star delta starter upto 37.5 KW,ATS between 37.5 KW to 50 KW and starter rotor starter with slipring motor beyond 50 KW.
288Providing MS .sheet,16 SWG steel fabricated floor mounted closed(Almirah type) switch board including angle iron post of suitable height and size ISA 40x40x6mm,duly painted, comprising and capable of mounting the following accessories with all internal connections: The drawing of panel board shall be subject to approval of Engineer-in-charge. 1 Job
289Ammeter AC supply 100mm dia circular dialAuto electrical AE/IMP/Havells make of suitable range for above motorwith selector switchesconforming to BIS:1248(P-II) 1983 with upto date ammendments.1 Each
290Voltmeter A.C. Supply 100mm dia circular dia Auto electric/AE/IMP/Havells make of suitable range with selector switches as per IS:4064-1978 with upto date ammendments.1 Each
291ICTP switches with HRC fuses ofKilburn/L&T/Siemens/Standard/Havells make and having Capacity 30% extra of the operational rating as per IS:4064-1978 with upto date ammendments immediately after the power meter of HPSEB. ICTP SWITCHES: I) Type :ii)Make:- iii)CapacityAmp.1 Set
292Bus bar chamber having three copper bars of suitable rating for full length equal to the width of the board for three live phases and one copper bar of half the rating of full length for neutral phase as per BIS:8084-1976 and 11353-1985 read with 5578-1985 with upto date ammendments.BUS BAR CHAMBER:-i)Type: - . ii)Make:- iii)Rating1 Set
293ACB/M.C.B/Oil Circuit Breaker of suitable capacity of Kilburn/ L&T/ MEI/GEC/Standard make on incoming feeder for motor offeredby the tenderer conforming to BIS-2516-1985 latest with upto date ammendments with initial oil filling whenever required and neutral linked under voltage release.1 Each
294Three phase Indicating lamps complete with toggle switches for individual motors as per IS 3452(P-I&II) with upto date ammendments. THREE PHASE INDICATOR:- i) Type:-ii) Make:- iii) Capacity.1 Set
295Earth leakage circuit breaker relay of recommended make such as (Kilburn/L&T/MEI/ GEC) conformingto BIS- 2516-1977 withuptodate ammendment and of suitable range which should have control box operating handle and trip/reset bush button on/off indicators, re-indicating off spring condition of the circuit breaker for over current protection.The circuit should be equipped with magnet thermal release with metallic tape etc. It shouldalso befitted with earth fault for tripping of breaker on occurrence of earth fault on off breaker load side end. ELCB/ELR:- I)Make :-(CEI approved). ii)Type: iii) Range. 1 Each
296Providing Hour run meter of reputed make for four digit capacity conforming to BIS:722(Latest edition)/recommendations. HOUR RUN METER:- I) Type:-ii)Make:- iii)Capacity:-Hrs.1 Each
297Suitable three phase voltage monitor relay with all protection and usual indicator and electric siren against single phasing No/ low voltage,high voltage& overloading and phase voltage difference as per IS:3842with upto date ammendments.1 Each
298Change over switch of reputed make and suitable capacity 1 Each
299Single phase preventor of reputed make and suitable capacity conforming to IS:1248 (P-V)-1983 with upto date ammendments.1 Each
300Supplyof Kirloskar/Leader/KSB/fouress/pellicon make of Cast steel double flangedsluice valve having size nominal delivery size of pump and capable of withstanding nominal seat pressure as mentioned in item No.1 (a)& conforming to BIS/API-standards with upto date ammendments for delivery line of pump. 1 Each
301(Note:- The sluice valve shall conform to BIS-780-1984 latest with upto date ammedments. However, if the seat pressure exceeds the limits prescribed in BIS: 780 then the sluice valves shall be of Cast steel conforming to class 150 ASA (Seat pressure 21 kg/cm^2 ) or Class 300- ASA )Seat pressure 52 kg/cm^2) as per BS: 1414(API -600).
302Supply of Kirloskar/Kilburn/IVC/Fouress/Gled/BHEL/Leader/Bir/Kartar/ Pelicon make of Cast Iron/Cast Steel double flanged swing check type reflux valve for delivery line of pump having bye pass arrangement & sizeone size higher than the normal delivery size of .pump and capable of withstanding nominal seat pressureas mentioned in item No.1 (a) & comforming toBIS/API standard with upto date ammendments for delivery line of pump. 1 Each
303NOTE:- The reflux valve shall conform to BIS 5312-1984 (part I) latest with up to date ammendments. However if the seat pressure exceeds the limits prescribed in BIS 5312then the reflux valves shall be of cast steel conforming to class 150 ASA (Seat pressure 21 kg/cm^2)or Class 300 ASA (Seat pressure 52 kg/cm^2) as per BIS: 1414(API -600).
304Supply of Kirloskar/Kilburn/IVC/Fouress/Gled/BHEL/Leader/Bir/Kartar/ Pelicon make of suitable size Cast Steel double flanged swing check type reflux valve having bye pass arrangement & sizeequal to dia of Rising main as mentioned in item No.1 (c) for with standing normal seat pressure as per item No.1(a).1 Each
305NOTE:- The reflux valve shall conform to BIS 5312-1984 (part I) latest with up to date ammendments. However if the seat pressure exceeds the limits prescribed in BIS 5312then the reflux valves shall be of cast steel conforming to Class 150 ASA ((Seat pressure 21 kg/cm^2 class 300 ASA (Seat pressure 52 kg/cm^2) as per BS: 1414(API -600).
306Supply of Kirloskar/Jyoti/ Standard/Kilburn/Bir/ Kartar make cast iron flanged screwed type foot valve ( in case suction lift is involved) for suction pipe having size one or two size larger than suction size of pump such that velocity of flow is not more than 2.50 mtr/sec. with strainerhaving net area of its openings equal to three to four times of X-sectional area of flow in suction pipe conforming to BIS- 4038-1986 or latestwith up to date ammendments including all leads and lifts. 1 Each
307Supply of Kirloskar/Kilburn/IVC/Fouress/Gled/BHEL/Leader/Bir/Kartar/ Pelicon make of Cast Iron double flanged sluice valve ( in case suction is +tive) for suction pipe havingsizeone or two size larger than suction size of pumpsuch that velocity of flow in suction pipe is not more than 2.50 mtrs/ sec. with stainerhet area of its openingequal to three to four timjes of X-sectional area of flow in suction pipe and conforming to BIS/API standards with upto date ammendments i/c all leads and lift and as directed by the Engineer-in-charge.1 Each
308NOTE:- The reflux valve shall conform to BIS 5312-1984 (part I) latest with up to date ammendments. However if the seat pressure exceeds the limits prescribed in BIS 5312then the reflux valves shall be of cast steel conforming to class 150 ASA (Seat pressure 21 kg/cm^2)or Class 300 ASA (Seat pressure 52 kg/cm^2) as per BIS: 1414(API -600).
309Prov. laying jointing and testing at site suitable size copper PVC insulated armoured power three and half core cable conforming to BIS 1554 (Part.I) 1988 or latest upto date ammendments or siemens/Gloster/ ICC/ EICO/National/IEC make from meter of HPSEB to circuit breaker and from circuit breaker to bus bar switch and starter (one cable carrying all three phases) including all other electrical equipment/accessories, such as thimbles, flexble pipe, solder, nuts and bolts, cable glands etc. laid in pipes or trenches under floor. The type, size and make will be subject to approval of HPSEB authorities. In case ofnon acceptance by HPSEB authorities it shall have to be replaced by the tenderer free of cost i/c cost of carriage of material in all leads and lifts and as directed by the Engineer-in-charge. 1 Job
310Prov. laying jointing and testing at site suitable size copper PVC insulated armoured power threecore cable conforming to BIS 1554 (Part.I) 1988 or latest upto date ammendments or siemens/Gloster/ ICC/ EICO/ National/ IEC make from meter of HPSEB to circuit breaker and from circuit breaker to bus bar switch and starter (one cable carrying all three phases) including all other electrical equipment/accessories, such as thimbles, flexble pipe, solder, nuts and bolts, cable glands etc. laid in pipes or trenches under floor. The type, size and make will be subject to approval of HPSEB authorities. In case ofnon acceptance by HPSEB authorities it shall have to be replaced by the tenderer free of cost i/c cost of carriage of material in all leads and lifts and as directed by the Engineer-in-charge. 1 Job
311Providing and laying double loop earthing with copper plate 600mmx600mmx3mm thick electrode complete with material such as charcoal and commonsalt G.I.Pipes thimbles nuts and bolts,digging of pits, G.I.Wiring and 25x5mm copper strips of required capacity conforming to BIS 3043-1987 latest with upto dateammendments suitable for above motors and other electrical equipmentsi/c cost of carriage of material in all leads and liftsand as directed by the Engineer-in-charge.1 Job
312Supply and errection of floor/wall mounted power factor shunt capacitor conforming to BIS:2834-1986 or latest with upto date ammendments of BHEL/GEC/Machneil/Mager/Bajaj/L&T make to raise the prevailing power factor at site to 0.95 for direct connection to induction motor individually of required KVAR according to HP of motor offered including cable Siemens/Gloster/ICC make from busbar chamber to capacitor & also including L&T/Kilburn/Standard/Siemens/Havells make ICTP switches conforming to BIS:4064-1978 or latest with HRC fuses (Range to be specified by the tenderer) i/c cost of carriage of material in all leads and lifts & as directed by Engineer-in-charge.1 L.S.
313Supply of 100mm circular dia pressure gauge of suitable range & standard make such as Fiebig/Bourden/ Precision/PREGA with all accessories such as stop cock, copper tubing etc.conformfing to BIS: 3624-1987 or latest with upto date ammendments. 1 Each
314Prov. and fixing double flanged suction, delivery pipe and common header considering site requirement, NPSH required and available & common header having area equal to two times the area of delivery branch of pump including tapers, flanges, rubber gaskets 3mm thick as per BIS:2712-1978 nuts and bolts as per 1264-1983 & special upto 5mtrs. away from the outer wall of pump house as per layout drawings approved by Engneer-in-charge. The pipes shall be capable of with standing minimum 1.5 times the total pressure as indicated in item No.1(a) or total dynamic pressure+ surge pressure whichever is more. The size of suction pipe shall be one or two sizes larger than the suction size of pump such that velocity of flow in suction pipe is not more than 2.50 mtrs./sec. & delivery pipe shall be of size one size larger than nominal delivery size of pump i/c cost of carriage of material in all leads and lifts and as per directed by the Engineer-in-charge. 1 Job
315NOTE:- Actual laying to be done as per final drawings to be approved by the Engineer-in-charge.
316Supply of antivibration pads conforming to BIS 6337-1971 or latest with upto date ammendments of suitable size for above machinery.1 Each
317Errection of allequipments including cost of tees, bends, tapers and any other fittings required as per site conditions & as per direction of Engineer-in-Charge.1 Job
318LWSS Galu Khurd Stage-IInd.
319Supply, erection, testing & commissioning of horizontal spindle,horizontal split casing,radial split Single, /Multistages centrifugal pumpsor combination of pumps, in series/parallel of recommended make such as Mather and Platt/KSB//Becon weir/Kirloskar/ BE/Jyotior any other make approved from IPH Deptt.as per BIS 1520-1980 with upto date ammendments read with BIS 9137-1978 or latest edition to suitable for lifting clear water for under mentioned characteristics with bronze impellers/ priming funnels casing ring and shaft sleaves or bronze. shaft of steel grade-with cast iron casing coupled directly through a flexible coupling on a common C.I./Cast steel base plate (base plate to be from the manufacturers of the pumping unit only) to slip ring/squirrel cage screen protected drip proof induction motor of standard make such as Kirloskar/ Crompton/ Bhel/NGEF/ GEC/Siemen/Jyoti/ABBor any other make approved from IPH Deptt.suitable for operation on 415(+) /-10% volts, 50 cycles/ second, 3 phase AC electric supply. The power of electric motor should be atleast 10% in excess of the maximum power required by the pump in the operation range of (+) 10% and (-)15% of the duty point head. The motor should be as per IS:325-1978with upto date ammendments read with IS:900-1972. It should include cost of bearing nuts, bolts and pointing etc. and should meet the following requirements:- 1x75 = 75 HP
320TotalHead:-292.00 mtrs.
321Discharge of each pump set:- 9.84 cum/Hr per set.
322Dia of R/Main:- 100 mm.
323Length of Rising Main ( In metres).:- 1100 mtrs.
324SITE CONDITIONS& WATER CHARACTERSTICS:-
325Location of Site:-
326The altitude of place in which the motor is intended to work in ordinary service (in metres) :- To be filled by the Engineer Incharge.
327Humidity:-Weather generally remains humid during monsoon season.
328Nature of atmosphere:- As normally encountered in Shivalik ange.
329Detail of quality of water:-Potable drinking water.
330Water free from sand or not :-Free.
331Water corosive or not :-Not.
332Turbidity (if any):-To be filled by the Engineer Incharge.
333NPSH available:- To be filled by the Engineer Incharge.
334Any other information or requirement:-
335OPERATING CONDITIONS:-
336Type of current:- AC three/single phase
337Operating frequency:- 50 HZ
338Rated voltage:- 400 (+/-) 10% volts
339System of earthing if any to to be adopted.:-Double loop earthing as per BIS 3043-1987 latest with upto date ammendments.
340No. of working hours per day:- 8 hours
341Speed of revolution in RPM:- To be quoted by tenderer
342Direction of rotation:- To be quoted by tenderer
343The max. Temp. of cooling air & water in the place in which the motor is intented to work in ordinary service:- 35 Degree Centigrade.
344MOTOR:-
345Ref. to BIS code:- BIS 325-1978 read with BIS 900-1992(latest)with upto date ammendments
346Type of enclosure of motor:-SPDP(as per BIS 4691-1985 (latest)
347Type of duty:-Continuous as per IS-12824-1989 or latest with up to date ammendments
348Mechanical out put in KW:-Suitable for driving centrifugal pumps required for duties specified against pumps.To avoid overloading of motor amargin of about 15-20% may be kept in the rated out putof prime mover.
349Class of insulation:- Class ~B~
350Max.permissible temp.rise of motor reqd. if different from given in B(viii) above:-To be filled by the Engineer Incharge.
351Particulars of test reqd. & where they are to be conducted:-As per terms & conditions
352Particulars as to whether voltage limiting device will be employed:-ATS/Star delta starter, oil immersed, fully automatic to be installed between bus bar and motor shunt capacitor is also proposed to be installed for improving the power factor at site.
353(NOTE:- Star delta starter upto 37.5 KW, ATSbetween 37.5 KW to 50 KW and stator rotor starter with slip ring motor beyond 50 KW).
354Motor whether squirrel cage or slipring :-Squirrel cage/slip-ring (Note:- Squirrel cage upto 65 HP and slipring above 65 HP.
355Details of shaft extension reqd.:-Just sufficient to provide direct drive by flexible couplingto pump.
356Typeofslip-ringgearwhether continuously rated or for starting purposes only & whether to befitted with brush lifting or short circuit arrangements or both if interlocks are rquired.:-Continuously rated for Squirrel cage/ Slipring motor
357Breakway torque in terms of rated load torque & the correspondingbreakway starting current which may be taken from the supply withthe starting apparatus in circuit.:- Breakway torque to be given by the tenderer but the starting current should not exceed 2.5 times of the fullload current.
358Nature of load & any information regarding the driven machine whichhas a bearing upon the torque reqd. during the accelerated period, thekinetic energy of the moving partsto be accelrated & No.of startsduring a specified period.:- Sufficient to work the pump offered
359Where possible fault capacity ofthe system to which the motor is connected.:-The motor should be able to withstand initial current of 2.5 times the rated current for two minutes without sufferingdamages or permanent deformations.
360PUMP :-BIS 1520-1980read with BIS 9137-1978 bothwith up to date ammendments
361Nos of pumps reqd.:-1No. pumps .
362Spare parts required:-For 2 years normal maintenance as recommended by manufacturer.
363Optional fittings reqd.:-Air cock for exahausting air from each stage.
364PUMP OPERATING CONDITIONS:-
365TotalHead:- 292.00 mtrs.
366Discharge of each pump set:- 9.84 cum/Hr per set.
367If total head is not known then
368following details be provided:-
369i) Static head ( in mtrs) 250.00Mtrs.
370ii) Minimum depth of water( in mtrs)
371iii) Variation in water level( in mtrs)
372iv) Ground level to max. water level ( in mtrs)
373v) Ground level to delivery point ( in mtrs)
374vi) Pressure in the suction tank(in Kg/cm^2 )
375vii) Pressure in the delivery tank (in Kg/cm^2 )
376Length of R/Main(in metres):-1100 mtrs
377Dia of R/Main (in mm):- 100 mm.
378Drive arrangement:-Direct through flexible coupling on acommon base plate
379Drive type:- Electric driven
380NPSH reqd.:-To be quoted by the tenderer
381Limits of total head in which the pump is reqd. to operate.:-(-) 15% to (+) 10% of total head.
382Suction/delivery size of pump:-To be specified by the tenderer
383Efficiency of pump at:- To be specified by the tenderer
384a) duty head
385b) (+)10 % head
386c) (-) 15 % head
387Material of construction:- To be specified by the tenderer (manufacturer"s certficate to be appended) 1 Each
388Supply of suitable direct on line/oil immersed star delta /ATS/Starter rotor starter of standard makesuch as MEI/Kilburn/Jyuoti/ Siemens/ Larson and Turbo conforming to BIS-8544-1979 latest with upto date ammendments for squirrel cage/slip-ring motor (make to be specified by the tenderers) mounted on panel board with magnetic type overload release & dash pot, time lag,under voltage release with initial oil filling. 1 Each
389Note:-Star delta starter upto 37.5 KW,ATS between 37.5 KW to 50 KW and starter rotor starter with slipring motor beyond 50 KW.
390Providing MS .sheet,16 SWG steel fabricated floor mounted closed(Almirah type) switch board including angle iron post of suitable height and size ISA 40x40x6mm,duly painted, comprising and capable of mounting the following accessories with all internal connections: The drawing of panel board shall be subject to approval of Engineer-in-charge.1 Job
391Ammeter AC supply 100mm dia circular dialAuto electrical AE/IMP/Havells make of suitable range for above motorwith selector switchesconforming to BIS:1248(P-II) 1983 with upto date ammendments. 1 Each
392Voltmeter A.C. Supply 100mm dia circular dia Auto electric/AE/IMP/Havells make of suitable range with selector switches as per IS:4064-1978 with upto date ammendments.1 Each
393ICTP switches with HRC fuses ofKilburn/L&T/Siemens/Standard/Havells make and having Capacity 30% extra of the operational rating as per IS:4064-1978 with upto date ammendments immediately after the power meter of HPSEB. ICTP SWITCHES: I) Type :ii)Make:- iii)CapacityAmp.1 Set
394Bus bar chamber having three copper bars of suitable rating for full length equal to the width of the board for three live phases and one copper bar of half the rating of full length for neutral phase as per BIS:8084-1976 and 11353-1985 read with 5578-1985 with upto date ammendments.BUS BAR CHAMBER:-i)Type: - . ii)Make:- iii)Rating 1 Set
395ACB/M.C.B/Oil Circuit Breaker of suitable capacity of Kilburn/ L&T/ MEI/GEC/Standard make on incoming feeder for motor offeredby the tenderer conforming to BIS-2516-1985 latest with upto date ammendments with initial oil filling whenever required and neutral linked under voltage release.1 Each
396Three phase Indicating lamps complete with toggle switches for individual motors as per IS 3452(P-I&II) with upto date ammendments. THREE PHASE INDICATOR:- i) Type:-ii) Make:- iii) Capacity.1 Set
397Earth leakage circuit breaker relay of recommended make such as (Kilburn/L&T/MEI/ GEC) conformingto BIS- 2516-1977 withuptodate ammendment and of suitable range which should have control box operating handle and trip/reset bush button on/off indicators, re-indicating off spring condition of the circuit breaker for over current protection.The circuit should be equipped with magnet thermal release with metallic tape etc. It shouldalso befitted with earth fault for tripping of breaker on occurrence of earth fault on off breaker load side end. ELCB/ELR:- I)Make :-(CEI approved). ii)Type: iii) Range. 1 Each
398Providing Hour run meter of reputed make for four digit capacity conforming to BIS:722(Latest edition)/recommendations. HOUR RUN METER:- I) Type:-ii)Make:- iii)Capacity:- Hrs. 1 Each
399Suitable three phase voltage monitor relay with all protection and usual indicator and electric siren against single phasing No/ low voltage,high voltage& overloading and phase voltage difference as per IS:3842with upto date ammendments. 1 Each
400Change over switch of reputed make and suitable capacity 1 Each
401Single phase preventor of reputed make and suitable capacity conforming to IS:1248 (P-V)-1983 with upto date ammendments. 1 Each
402Supplyof Kirloskar/Leader/KSB/fouress/pellicon make of Cast steel double flangedsluice valve having size nominal delivery size of pump and capable of withstanding nominal seat pressure as mentioned in item No.10 (a)& conforming to BIS/API-standards with upto date ammendments for delivery line of pump.1 Each
403(Note:- The sluice valve shall conform to BIS-780-1984 latest with upto date ammedments. However, if the seat pressure exceeds the limits prescribed in BIS: 780 then the sluice valves shall be of Cast steel conforming to class 150 ASA (Seat pressure 21 kg/cm^2 ) or Class 300- ASA )Seat pressure 52 kg/cm^2) as per BS: 1414(API -600).
404Supply of Kirloskar/Kilburn/IVC/Fouress/Gled/BHEL/Leader/Bir/Kartar/ Pelocon make of Cast Iron/Cast Steel double flanged swing check type reflux valve for delivery line of pump having bye pass arrangement & sizeone size higher than the normal delivery size of .pump and capable of withstanding nominal seat pressureas mentioned in item No.1 0(a) & comforming toBIS/API standard with upto date ammendments for delivery line of pump.1 Each
405NOTE:- The reflux valve shall conform to BIS 5312-1984 (part I) latest with up to date ammendments. However if the seat pressure exceeds the limits prescribed in BIS 5312then the reflux valves shall be of cast steel conforming to class 150 ASA (Seat pressure 21 kg/cm^2)or Class 300 ASA (Seat pressure 52 kg/cm^2) as per BIS: 1414(API -600).
406Supply of Kirloskar/Kilburn/IVC/Fouress/Gled/BHEL/Leader/Bir/Kartar/ Pelocon make of suitable size Cast Steel double flanged swing check type reflux valve having bye pass arrangement & sizeequal to dia of Rising main as mentioned in item No.10 (c) for with standing normal seat pressure as per item No.10(a). 1 Each
407NOTE:- The reflux valve shall conform to BIS 5312-1984 (part I) latest with up to date ammendments. However if the seat pressure exceeds the limits prescribed in BIS 5312then the reflux valves shall be of cast steel conforming to Class 150 ASA ((Seat pressure 21 kg/cm^2 class 300 ASA (Seat pressure 52 kg/cm^2) as per BS: 1414(API -600).
408Supply of Kirloskar/Jyoti/ Standard/Kilburn/Bir/ Kartar make cast iron flanged screwed type foot valve ( in case suction lift is involved) for suction pipe having size one or two size larger than suction size of pump such that velocity of flow is not more than 2.50 mtr/sec. with strainerhaving net area of its openings equal to three to four times of X-sectional area of flow in suction pipe conforming to BIS- 4038-1986 or latestwith up to date ammendments including all leads and lifts.1 Each
409Supply of Kirloskar/Kilburn/IVC/Fouress/Gled/BHEL/Leader/Bir/Kartar/ Pelocon make of Cast Iron double flanged sluice valve ( in case suction is +tive) for suction pipe havingsizeone or two size larger than suction size of pumpsuch that velocity of flow in suction pipe is not more than 2.50 mtrs/ sec. with stainerhet area of its openingequal to three to four timjes of X-sectional area of flow in suction pipe and conforming to BIS/API standards with upto date ammendments i/c all leads and lift and as directed by the Engineer-in-charge. 1 Each
410NOTE:- The reflux valve shall conform to BIS 5312-1984 (part I) latest with up to date ammendments. However if the seat pressure exceeds the limits prescribed in BIS 5312then the reflux valves shall be of cast steel conforming to class 150 ASA (Seat pressure 21 kg/cm^2)or Class 300 ASA (Seat pressure 52 kg/cm^2) as per BIS: 1414(API -600).
411Prov. laying jointing and testing at site suitable size copper PVC insulated armoured power three and half core cable conforming to BIS 1554 (Part.I) 1988 or latest upto date ammendments or siemens/Gloster/ ICC/ EICO/National/IEC make from meter of HPSEB to circuit breaker and from circuit breaker to bus bar switch and starter (one cable carrying all three phases) including all other electrical equipment/accessories, such as thimbles, flexble pipe, solder, nuts and bolts, cable glands etc. laid in pipes or trenches under floor. The type, size and make will be subject to approval of HPSEB authorities. In case ofnon acceptance by HPSEB authorities it shall have to be replaced by the tenderer free of cost i/c cost of carriage of material in all leads and lifts and as directed by the Engineer-in-charge.1 Job
412Prov. laying jointing and testing at site suitable size copper PVC insulated armoured power threecore cable conforming to BIS 1554 (Part.I) 1988 or latest upto date ammendments or siemens/Gloster/ ICC/ EICO/ National/ IEC make from meter of HPSEB to circuit breaker and from circuit breaker to bus bar switch and starter (one cable carrying all three phases) including all other electrical equipment/ accessories, such as thimbles, flexble pipe, solder, nuts and bolts, cable glands etc. laid in pipes or trenches under floor. The type, size and make will be subject to approval of HPSEB authorities. In case ofnon acceptance by HPSEB authorities it shall have to be replaced by the tenderer free of cost i/c cost of carriage of material in all leads and lifts and as directed by the Engineer-in-charge.1 Job
413Providing and laying double loop earthing with copper plate 600mmx600mmx3mm thick electrode complete with material such as charcoal and commonsalt G.I.Pipes thimbles nuts and bolts,digging of pits, G.I.Wiring and 25x5mm copper strips of required capacity conforming to BIS 3043-1987 latest with upto dateammendments suitable for above motors and other electrical equipmentsi/c cost of carriage of material in all leads and liftsand as directed by the Engineer-in-charge.1 Job
414Supply and errection of floor/wall mounted power factor shunt capacitor conforming to BIS:2834-1986 or latest with upto date ammendments of BHEL/GEC/Machneil/Mager/Bajaj/L&T make to raise the prevailing power factor at site to 0.95 for direct connection to induction motor individually of required KVAR according to HP of motor offered including cable Siemens/Gloster/ICC make from busbar chamber to capacitor & also including L&T/Kilburn/Standard/Siemens/Havells make ICTP switches conforming to BIS:4064-1978 or latest with HRC fuses (Range to be specified by the tenderer) i/c cost of carriage of material in all leads and lifts & as directed by Engineer-in-charge. 1 L.S.
415Supply of 100mm circular dia pressure gauge of suitable range & standard make such as Fiebig/Bourden/ Precision/PREGA with all accessories such as stop cock, copper tubing etc.conformfing to BIS: 3624-1987 or latest with upto date ammendments.1 Each
416Prov. and fixing double flanged suction, delivery pipe and common header considering site requirement, NPSH required and available & common header having area equal to two times the area of delivery branch of pump including tapers, flanges, rubber gaskets 3mm thick as per BIS:2712-1978 nuts and bolts as per 1264-1983 & special upto 5mtrs. away from the outer wall of pump house as per layout drawings approved by Engneer-in-charge. The pipes shall be capable of with standing minimum 1.5 times the total pressure as indicated in item No.1(a) or total dynamic pressure+ surge pressure whichever is more. The size of suction pipe shall be one or two sizes larger than the suction size of pump such that velocity of flow in suction pipe is not more than 2.50 mtrs./sec. & delivery pipe shall be of size one size larger than nominal delivery size of pump i/c cost of carriage of material in all leads and lifts and as per directed by the Engineer-in-charge. 1 Job
417NOTE:- Actual laying to be done as per final drawings to be approved by the Engineer-in-charge.
418Supply of antivibration pads conforming to BIS 6337-1971 or latest with upto date ammendments of suitable size for above machinery. 1 Each
419Errection of allequipments including cost of tees, bends, tapers and any other fittings required as per site conditions & as per direction of Engineer-in-Charge.1 Job
420LWSS Nagpur Chirmu Stage-Ist.
421Supply, erection, testing & commissioning of horizontal spindle,horizontal split casing,radial split Single, /Multistages centrifugal pumpsor combination of pumps, in series/parallel of recommended make such as Mather and Platt/KSB//Becon weir/Kirloskar/ BE/Jyotior any other make approved from IPH Deptt.as per BIS 1520-1980 with upto date ammendments read with BIS 9137-1978 or latest edition to suitable for lifting clear water for under mentioned characteristics with bronze impellers/ priming funnels casing ring and shaft sleaves or bronze. shaft of steel grade-with cast iron casing coupled directly through a flexible coupling on a common C.I./Cast steel base plate (base plate to be from the manufacturers of the pumping unit only) to slip ring/squirrel cage screen protected drip proof induction motor of standard make such as Kirloskar/ Crompton/ Bhel/NGEF/ GEC/Siemen/Jyoti/ABBor any other make approved from IPH Deptt.suitable for operation on 415(+) /-10% volts, 50 cycles/ second, 3 phase AC electric supply. The power of electric motor should be atleast 10% in excess of the maximum power required by the pump in the operation range of (+) 10% and (-)15% of the duty point head. The motor should be as per IS:325-1978with upto date ammendments read with IS:900-1972. It should include cost of bearing nuts, bolts and pointing etc. and should meet the following requirements:-1x150 = 150 HP
422TotalHead:- 751.00 mtrs.
423Discharge of each pump set:- 22.00 cum/Hr per set.
424Dia of R/Main:- 100 mm.
425Length of Rising Main ( In metres).:- 1980 mtrs.
426SITE CONDITIONS& WATER CHARACTERSTICS:-
427Location of Site:-
428The altitude of place in which the motor is intended to work in ordinary service (in metres) :- To be filled by the Engineer Incharge.
429Humidity:-Weather generally remains humid during monsoon season.
430Nature of atmosphere:- As normally encountered in Shivalik ange.
431Detail of quality of water:-Potable drinking water.
432Water free from sand or not :-Free.
433Water corosive or not :-Not.
434Turbidity (if any):-To be filled by the Engineer Incharge.
435NPSH available:- To be filled by the Engineer Incharge.
436Any other information or requirement:-
437OPERATING CONDITIONS:-
438Type of current:- AC three/single phase
439Operating frequency:- 50 HZ
440Rated voltage:- 400 (+/-) 10% volts
441System of earthing if any to to be adopted.:-Double loop earthing as per BIS 3043-1987 latest with upto date ammendments.
442No. of working hours per day:- 8 hours
443Speed of revolution in RPM:- To be quoted by tenderer
444Direction of rotation:- To be quoted by tenderer
445The max. Temp. of cooling air & water in the place in which the motor is intented to work in ordinary service:- 35 Degree Centigrade.
446MOTOR:-
447Ref. to BIS code:- BIS 325-1978 read with BIS 900-1992(latest)with upto date ammendments
448Type of enclosure of motor:-SPDP(as per BIS 4691-1985 (latest)
449Type of duty:-Continuous as per IS-12824-1989 or latest with up to date ammendments
450Mechanical out put in KW:-Suitable for driving centrifugal pumps required for duties specified against pumps.To avoid overloading of motor amargin of about 15-20% may be kept in the rated out putof prime mover.
451Class of insulation:- Class ~B~
452Max.permissible temp.rise of motor reqd. if different from given in B(viii) above:-To be filled by the Engineer Incharge.
453Particulars of test reqd. & where they are to be conducted:-As per terms & conditions
454Particulars as to whether voltage limiting device will be employed:-ATS/Star delta starter, oil immersed, fully automatic to be installed between bus bar and motor shunt capacitor is also proposed to be installed for improving the power factor at site.
455(NOTE:- Star delta starter upto 37.5 KW, ATSbetween 37.5 KW to 50 KW and stator rotor starter with slip ring motor beyond 50 KW).
456Motor whether squirrel cage or slipring :-Squirrel cage/slip-ring (Note:- Squirrel cage upto 65 HP and slipring above 65 HP.
457Details of shaft extension reqd.:-Just sufficient to provide direct drive by flexible couplingto pump.
458Typeofslip-ringgearwhether continuously rated or for starting purposes only & whether to befitted with brush lifting or short circuit arrangements or both if interlocks are rquired.:-Continuously rated for Squirrel cage/ Slipring motor
459Breakway torque in terms of rated load torque & the correspondingbreakway starting current which may be taken from the supply withthe starting apparatus in circuit.:- Breakway torque to be given by the tenderer but the starting current should not exceed 2.5 times of the fullload current.
460Nature of load & any information regarding the driven machine whichhas a bearing upon the torque reqd. during the accelerated period, thekinetic energy of the moving partsto be accelrated & No.of startsduring a specified period.:- Sufficient to work the pump offered
461Where possible fault capacity ofthe system to which the motor is connected.:-The motor should be able to withstand initial current of 2.5 times the rated current for two minutes without sufferingdamages or permanent deformations.
462PUMP :-BIS 1520-1980read with BIS 9137-1978 bothwith up to date ammendments
463Nos of pumps reqd.:-1No. pumps .
464Spare parts required:-For 2 years normal maintenance as recommended by manufacturer.
465Optional fittings reqd.:-Air cock for exahausting air from each stage.
466PUMP OPERATING CONDITIONS:-
467TotalHead:-751.00 mtrs.
468Discharge of each pump set:- 22.00 cum/Hr per set.
469If total head is not known then
470following details be provided:-
471i) Static head ( in mtrs)720.25 Mtrs.
472ii) Minimum depth of water( in mtrs)
473iii) Variation in water level( in mtrs)
474iv) Ground level to max. water level ( in mtrs)
475v) Ground level to delivery point ( in mtrs)
476vi) Pressure in the suction tank(in Kg/cm^2 )
477vii) Pressure in the delivery tank (in Kg/cm^2 )
478Length of R/Main(in metres):-1980 mtrs
479Dia of R/Main (in mm):- 100 mm.
480Drive arrangement:-Direct through flexible coupling on acommon base plate
481Drive type:- Electric driven
482NPSH reqd.:-To be quoted by the tenderer
483Limits of total head in which the pump is reqd. to operate.:-(-) 15% to (+) 10% of total head.
484Suction/delivery size of pump:-To be specified by the tenderer
485Efficiency of pump at:- To be specified by the tenderer
486a) duty head
487b) (+)10 % head
488c) (-) 15 % head
489Material of construction:-To be specified by the tenderer (manufacturer"s certficate to be appended)
490Supply of suitable direct on line/oil immersed star delta /ATS/Starter rotor starter of standard makesuch as MEI/Kilburn/Jyuoti/ Siemens/ Larson and Turbo conforming to BIS-8544-1979 latest with upto date ammendments for squirrel cage/slip-ring motor (make to be specified by the tenderers) mounted on panel board with magnetic type overload release & dash pot, time lag,under voltage release with initial oil filling.1 Each
491Note:-Star delta starter upto 37.5 KW,ATS between 37.5 KW to 50 KW and starter rotor starter with slipring motor beyond 50 KW.
492Providing MS .sheet,16 SWG steel fabricated floor mounted closed(Almirah type) switch board including angle iron post of suitable height and size ISA 40x40x6mm,duly painted, comprising and capable of mounting the following accessories with all internal connections: The drawing of panel board shall be subject to approval of Engineer-in-charge.1 Job
493Ammeter AC supply 100mm dia circular dialAuto electrical AE/IMP/Havells make of suitable range for above motorwith selector switchesconforming to BIS:1248(P-II) 1983 with upto date ammendments. 1 Each
494Voltmeter A.C. Supply 100mm dia circular dia Auto electric/AE/IMP/Havells make of suitable range with selector switches as per IS:4064-1978 with upto date ammendments. 1 Each
495ICTP switches with HRC fuses ofKilburn/L&T/Siemens/Standard/Havells make and having Capacity 30% extra of the operational rating as per IS:4064-1978 with upto date ammendments immediately after the power meter of HPSEB. ICTP SWITCHES: I) Type :ii)Make:- iii)CapacityAmp. 1 Set
496Bus bar chamber having three copper bars of suitable rating for full length equal to the width of the board for three live phases and one copper bar of half the rating of full length for neutral phase as per BIS:8084-1976 and 11353-1985 read with 5578-1985 with upto date ammendments.BUS BAR CHAMBER:-i)Type: - . ii)Make:- iii)Rating 1 Set
497ACB/M.C.B/Oil Circuit Breaker of suitable capacity of Kilburn/ L&T/ MEI/GEC/Standard make on incoming feeder for motor offeredby the tenderer conforming to BIS-2516-1985 latest with upto date ammendments with initial oil filling whenever required and neutral linked under voltage release.1 Each
498Three phase Indicating lamps complete with toggle switches for individual motors as per IS 3452(P-I&II) with upto date ammendments. THREE PHASE INDICATOR:- i) Type:-ii) Make:- iii) Capacity.1 Set
499Earth leakage circuit breaker relay of recommended make such as (Kilburn/L&T/MEI/ GEC) conformingto BIS- 2516-1977 withuptodate ammendment and of suitable range which should have control box operating handle and trip/reset bush button on/off indicators, re-indicating off spring condition of the circuit breaker for over current protection.The circuit should be equipped with magnet thermal release with metallic tape etc. It shouldalso befitted with earth fault for tripping of breaker on occurrence of earth fault on off breaker load side end. ELCB/ELR:- I)Make :-(CEI approved). ii)Type: iii) Range.1 Each
500Providing Hour run meter of reputed make for four digit capacity conforming to BIS:722(Latest edition)/recommendations. HOUR RUN METER:- I) Type:-ii)Make:- iii)Capacity:-Hrs.1 Each
501Suitable three phase voltage monitor relay with all protection and usual indicator and electric siren against single phasing No/ low voltage,high voltage& overloading and phase voltage difference as per IS:3842with upto date ammendments.1 Each
502Change over switch of reputed make and suitable capacity1 Each
503Single phase preventor of reputed make and suitable capacity conforming to IS:1248 (P-V)-1983 with upto date ammendments.1 Each
504Supplyof Kirloskar/Leader/KSB/fouress/pellicon make of Cast steel double flangedsluice valve having size nominal delivery size of pump and capable of withstanding nominal seat pressure as mentioned in item No.1 (a)& conforming to BIS/API-standards with upto date ammendments for delivery line of pump. 1 Each
505(Note:- The sluice valve shall conform to BIS-780-1984 latest with upto date ammedments. However, if the seat pressure exceeds the limits prescribed in BIS: 780 then the sluice valves shall be of Cast steel conforming to class 150 ASA (Seat pressure 21 kg/cm^2 ) or Class 300- ASA )Seat pressure 52 kg/cm^2) as per BS: 1414(API -600).
506Supply of Kirloskar/Kilburn/IVC/Fouress/Gled/BHEL/Leader/Bir/Kartar/ Pelicon make of Cast Iron/Cast Steel double flanged swing check type reflux valve for delivery line of pump having bye pass arrangement & sizeone size higher than the normal delivery size of .pump and capable of withstanding nominal seat pressureas mentioned in item No.1 (a) & comforming toBIS/API standard with upto date ammendments for delivery line of pump. 1 Each
507NOTE:- The reflux valve shall conform to BIS 5312-1984 (part I) latest with up to date ammendments. However if the seat pressure exceeds the limits prescribed in BIS 5312then the reflux valves shall be of cast steel conforming to class 150 ASA (Seat pressure 21 kg/cm^2)or Class 300 ASA (Seat pressure 52 kg/cm^2) as per BIS: 1414(API -600).
508Supply of Kirloskar/Kilburn/IVC/Fouress/Gled/BHEL/Leader/Bir/Kartar/ Pelicon make of suitable size Cast Steel double flanged swing check type reflux valve having bye pass arrangement & sizeequal to dia of Rising main as mentioned in item No.1 (c) for with standing normal seat pressure as per item No.1(a). 1 Each
509NOTE:- The reflux valve shall conform to BIS 5312-1984 (part I) latest with up to date ammendments. However if the seat pressure exceeds the limits prescribed in BIS 5312then the reflux valves shall be of cast steel conforming to Class 150 ASA ((Seat pressure 21 kg/cm^2 class 300 ASA (Seat pressure 52 kg/cm^2) as per BS: 1414(API -600).
510Supply of Kirloskar/Jyoti/ Standard/Kilburn/Bir/ Kartar make cast iron flanged screwed type foot valve ( in case suction lift is involved) for suction pipe having size one or two size larger than suction size of pump such that velocity of flow is not more than 2.50 mtr/sec. with strainerhaving net area of its openings equal to three to four times of X-sectional area of flow in suction pipe conforming to BIS- 4038-1986 or latestwith up to date ammendments including all leads and lifts. 1 Each
511Supply of Kirloskar/Kilburn/IVC/Fouress/Gled/BHEL/Leader/Bir/Kartar/ Pelicon make of Cast Iron double flanged sluice valve ( in case suction is +tive) for suction pipe havingsizeone or two size larger than suction size of pumpsuch that velocity of flow in suction pipe is not more than 2.50 mtrs/ sec. with stainerhet area of its openingequal to three to four timjes of X-sectional area of flow in suction pipe and conforming to BIS/API standards with upto date ammendments i/c all leads and lift and as directed by the Engineer-in-charge.1 Each
512NOTE:- The reflux valve shall conform to BIS 5312-1984 (part I) latest with up to date ammendments. However if the seat pressure exceeds the limits prescribed in BIS 5312then the reflux valves shall be of cast steel conforming to class 150 ASA (Seat pressure 21 kg/cm^2)or Class 300 ASA (Seat pressure 52 kg/cm^2) as per BIS: 1414(API -600).
513Prov. laying jointing and testing at site suitable size copper PVC insulated armoured power three and half core cable conforming to BIS 1554 (Part.I) 1988 or latest upto date ammendments or siemens/Gloster/ ICC/ EICO/National/IEC make from meter of HPSEB to circuit breaker and from circuit breaker to bus bar switch and starter (one cable carrying all three phases) including all other electrical equipment/accessories, such as thimbles, flexble pipe, solder, nuts and bolts, cable glands etc. laid in pipes or trenches under floor. The type, size and make will be subject to approval of HPSEB authorities. In case ofnon acceptance by HPSEB authorities it shall have to be replaced by the tenderer free of cost i/c cost of carriage of material in all leads and lifts and as directed by the Engineer-in-charge.1 Job
514Prov. laying jointing and testing at site suitable size copper PVC insulated armoured power threecore cable conforming to BIS 1554 (Part.I) 1988 or latest upto date ammendments or siemens/Gloster/ ICC/ EICO/ National/ IEC make from meter of HPSEB to circuit breaker and from circuit breaker to bus bar switch and starter (one cable carrying all three phases) including all other electrical equipment/accessories, such as thimbles, flexble pipe, solder, nuts and bolts, cable glands etc. laid in pipes or trenches under floor. The type, size and make will be subject to approval of HPSEB authorities. In case ofnon acceptance by HPSEB authorities it shall have to be replaced by the tenderer free of cost i/c cost of carriage of material in all leads and lifts and as directed by the Engineer-in-charge.1 Job
515Providing and laying double loop earthing with copper plate 600mmx600mmx3mm thick electrode complete with material such as charcoal and commonsalt G.I.Pipes thimbles nuts and bolts,digging of pits, G.I.Wiring and 25x5mm copper strips of required capacity conforming to BIS 3043-1987 latest with upto dateammendments suitable for above motors and other electrical equipmentsi/c cost of carriage of material in all leads and liftsand as directed by the Engineer-in-charge.1 Job
516Supply and errection of floor/wall mounted power factor shunt capacitor conforming to BIS:2834-1986 or latest with upto date ammendments of BHEL/GEC/Machneil/Mager/Bajaj/L&T make to raise the prevailing power factor at site to 0.95 for direct connection to induction motor individually of required KVAR according to HP of motor offered including cable Siemens/Gloster/ICC make from busbar chamber to capacitor & also including L&T/Kilburn/Standard/Siemens/Havells make ICTP switches conforming to BIS:4064-1978 or latest with HRC fuses (Range to be specified by the tenderer) i/c cost of carriage of material in all leads and lifts & as directed by Engineer-in-charge. 1 L.S.
517Supply of 100mm circular dia pressure gauge of suitable range & standard make such as Fiebig/Bourden/ Precision/PREGA with all accessories such as stop cock, copper tubing etc.conformfing to BIS: 3624-1987 or latest with upto date ammendments.1 Each
518Prov. and fixing double flanged suction, delivery pipe and common header considering site requirement, NPSH required and available & common header having area equal to two times the area of delivery branch of pump including tapers, flanges, rubber gaskets 3mm thick as per BIS:2712-1978 nuts and bolts as per 1264-1983 & special upto 5mtrs. away from the outer wall of pump house as per layout drawings approved by Engneer-in-charge. The pipes shall be capable of with standing minimum 1.5 times the total pressure as indicated in item No.1(a) or total dynamic pressure+ surge pressure whichever is more. The size of suction pipe shall be one or two sizes larger than the suction size of pump such that velocity of flow in suction pipe is not more than 2.50 mtrs./sec. & delivery pipe shall be of size one size larger than nominal delivery size of pump i/c cost of carriage of material in all leads and lifts and as per directed by the Engineer-in-charge. 1 Job
519NOTE:- Actual laying to be done as per final drawings to be approved by the Engineer-in-charge.
520Supply of antivibration pads conforming to BIS 6337-1971 or latest with upto date ammendments of suitable size for above machinery.1 Each
521Errection of allequipments including cost of tees, bends, tapers and any other fittings required as per site conditions & as per direction of Engineer-in-Charge.1 Job
522LWSS Nagpur Chirmu Stage-IInd.
523Supply, erection, testing & commissioning of horizontal spindle,horizontal split casing,radial split Single, /Multistages centrifugal pumpsor combination of pumps, in series/parallel of recommended make such as Mather and Platt/KSB//Becon weir/Kirloskar/ BE/Jyotior any other make approved from IPH Deptt.as per BIS 1520-1980 with upto date ammendments read with BIS 9137-1978 or latest edition to suitable for lifting clear water for under mentioned characteristics with bronze impellers/ priming funnels casing ring and shaft sleaves or bronze. shaft of steel grade-with cast iron casing coupled directly through a flexible coupling on a common C.I./Cast steel base plate (base plate to be from the manufacturers of the pumping unit only) to slip ring/squirrel cage screen protected drip proof induction motor of standard make such as Kirloskar/ Crompton/ Bhel/NGEF/ GEC/Siemen/Jyoti/ABBor any other make approved from IPH Deptt.suitable for operation on 415(+) /-10% volts, 50 cycles/ second, 3 phase AC electric supply. The power of electric motor should be atleast 10% in excess of the maximum power required by the pump in the operation range of (+) 10% and (-)15% of the duty point head. The motor should be as per IS:325-1978with upto date ammendments read with IS:900-1972. It should include cost of bearing nuts, bolts and pointing etc. and should meet the following requirements:- 1x135 = 135 HP
524TotalHead:-677.00 mtrs.
525Discharge of each pump set:- 15.64 cum/Hr per set.
526Dia of R/Main:- 80 mm.
527Length of Rising Main ( In metres).:- 3040 mtrs.
528SITE CONDITIONS& WATER CHARACTERSTICS:-
529Location of Site:-
530The altitude of place in which the motor is intended to work in ordinary service (in metres) :- To be filled by the Engineer Incharge.
531Humidity:-Weather generally remains humid during monsoon season.
532Nature of atmosphere:- As normally encountered in Shivalik ange.
533Detail of quality of water:-Potable drinking water.
534Water free from sand or not :-Free.
535Water corosive or not :-Not.
536Turbidity (if any):-To be filled by the Engineer Incharge.
537NPSH available:- To be filled by the Engineer Incharge.
538Any other information or requirement:-
539OPERATING CONDITIONS:-
540Type of current:- AC three/single phase
541Operating frequency:- 50 HZ
542Rated voltage:- 400 (+/-) 10% volts
543System of earthing if any to to be adopted.:-Double loop earthing as per BIS 3043-1987 latest with upto date ammendments.
544No. of working hours per day:- 8 hours
545Speed of revolution in RPM:- To be quoted by tenderer
546Direction of rotation:- To be quoted by tenderer
547The max. Temp. of cooling air & water in the place in which the motor is intented to work in ordinary service:- 35 Degree Centigrade.
548MOTOR:-
549Ref. to BIS code:-BIS 325-1978 read with BIS 900-1992(latest)with upto date ammendments
550Type of enclosure of motor:-SPDP(as per BIS 4691-1985 (latest)
551Type of duty:-Continuous as per IS-12824-1989 or latest with up to date ammendments
552Mechanical out put in KW:-Suitable for driving centrifugal pumps required for duties specified against pumps.To avoid overloading of motor amargin of about 15-20% may be kept in the rated out putof prime mover.
553Class of insulation:- Class ~B~
554Max.permissible temp.rise of motor reqd. if different from given in B(viii) above:-To be filled by the Engineer Incharge.
555Particulars of test reqd. & where they are to be conducted:-As per terms & conditions
556Particulars as to whether voltage limiting device will be employed:-ATS/Star delta starter, oil immersed, fully automatic to be installed between bus bar and motor shunt capacitor is also proposed to be installed for improving the power factor at site.
557(NOTE:- Star delta starter upto 37.5 KW, ATSbetween 37.5 KW to 50 KW and stator rotor starter with slip ring motor beyond 50 KW).
558Motor whether squirrel cage or slipring :-Squirrel cage/slip-ring (Note:- Squirrel cage upto 65 HP and slipring above 65 HP.
559Details of shaft extension reqd.:-Just sufficient to provide direct drive by flexible couplingto pump.
560Typeofslip-ringgearwhether continuously rated or for starting purposes only & whether to befitted with brush lifting or short circuit arrangements or both if interlocks are rquired.:-Continuously rated for Squirrel cage/ Slipring motor
561Breakway torque in terms of rated load torque & the correspondingbreakway starting current which may be taken from the supply withthe starting apparatus in circuit.:- Breakway torque to be given by the tenderer but the starting current should not exceed 2.5 times of the fullload current.
562Nature of load & any information regarding the driven machine whichhas a bearing upon the torque reqd. during the accelerated period, thekinetic energy of the moving partsto be accelrated & No.of startsduring a specified period.:- Sufficient to work the pump offered
563Where possible fault capacity ofthe system to which the motor is connected.:-The motor should be able to withstand initial current of 2.5 times the rated current for two minutes without sufferingdamages or permanent deformations.
564PUMP :-BIS 1520-1980read with BIS 9137-1978 bothwith up to date ammendments
565Nos of pumps reqd.:-1No. pumps .
566Spare parts required:-For 2 years normal maintenance as recommended by manufacturer.
567Optional fittings reqd.:-Air cock for exahausting air from each stage.
568PUMP OPERATING CONDITIONS:-
569TotalHead:-677.00 mtrs.
570Discharge of each pump set:- 15.64 cum/Hr per set.
571If total head is not known then
572following details be provided:-
573i) Static head ( in mtrs)607.65 Mtrs.
574ii) Minimum depth of water( in mtrs)
575iii) Variation in water level( in mtrs)
576iv) Ground level to max. water level ( in mtrs)
577v) Ground level to delivery point ( in mtrs)
578vi) Pressure in the suction tank(in Kg/cm^2 )
579vii) Pressure in the delivery tank (in Kg/cm^2 )
580Length of R/Main(in metres):- 3040 mtrs
581Dia of R/Main (in mm):-80 mm.
582Drive arrangement:-Direct through flexible coupling on acommon base plate
583Drive type:- Electric driven
584NPSH reqd.:-To be quoted by the tenderer
585Limits of total head in which the pump is reqd. to operate.:-(-) 15% to (+) 10% of total head.
586Suction/delivery size of pump:-To be specified by the tenderer
587Efficiency of pump at:- To be specified by the tenderer
588a) duty head
589b) (+)10 % head
590c) (-) 15 % head
591Material of construction:-To be specified by the tenderer (manufacturer"s certficate to be appended)1 Each
592Supply of suitable direct on line/oil immersed star delta /ATS/Starter rotor starter of standard makesuch as MEI/Kilburn/Jyuoti/ Siemens/ Larson and Turbo conforming to BIS-8544-1979 latest with upto date ammendments for squirrel cage/slip-ring motor (make to be specified by the tenderers) mounted on panel board with magnetic type overload release & dash pot, time lag,under voltage release with initial oil filling. 1 Each
593Note:-Star delta starter upto 37.5 KW,ATS between 37.5 KW to 50 KW and starter rotor starter with slipring motor beyond 50 KW.
594Providing MS .sheet,16 SWG steel fabricated floor mounted closed(Almirah type) switch board including angle iron post of suitable height and size ISA 40x40x6mm,duly painted, comprising and capable of mounting the following accessories with all internal connections: The drawing of panel board shall be subject to approval of Engineer-in-charge. 1 Job
595Ammeter AC supply 100mm dia circular dialAuto electrical AE/IMP/Havells make of suitable range for above motorwith selector switchesconforming to BIS:1248(P-II) 1983 with upto date ammendments.1 Each
596Voltmeter A.C. Supply 100mm dia circular dia Auto electric/AE/IMP/Havells make of suitable range with selector switches as per IS:4064-1978 with upto date ammendments. 1 Each
597ICTP switches with HRC fuses ofKilburn/L&T/Siemens/Standard/Havells make and having Capacity 30% extra of the operational rating as per IS:4064-1978 with upto date ammendments immediately after the power meter of HPSEB. ICTP SWITCHES: I) Type :ii)Make:- iii)CapacityAmp. 1 Set
598Bus bar chamber having three copper bars of suitable rating for full length equal to the width of the board for three live phases and one copper bar of half the rating of full length for neutral phase as per BIS:8084-1976 and 11353-1985 read with 5578-1985 with upto date ammendments.BUS BAR CHAMBER:-i)Type: - . ii)Make:- iii)Rating 1 Set
599ACB/M.C.B/Oil Circuit Breaker of suitable capacity of Kilburn/ L&T/ MEI/GEC/Standard make on incoming feeder for motor offeredby the tenderer conforming to BIS-2516-1985 latest with upto date ammendments with initial oil filling whenever required and neutral linked under voltage release. 1 Each
600Three phase Indicating lamps complete with toggle switches for individual motors as per IS 3452(P-I&II) with upto date ammendments. THREE PHASE INDICATOR:- i) Type:-ii) Make:- iii) Capacity. 1 Set
601Earth leakage circuit breaker relay of recommended make such as (Kilburn/L&T/MEI/ GEC) conformingto BIS- 2516-1977 withuptodate ammendment and of suitable range which should have control box operating handle and trip/reset bush button on/off indicators, re-indicating off spring condition of the circuit breaker for over current protection.The circuit should be equipped with magnet thermal release with metallic tape etc. It shouldalso befitted with earth fault for tripping of breaker on occurrence of earth fault on off breaker load side end. ELCB/ELR:- I)Make :-(CEI approved). ii)Type: iii) Range. 1 Each
602Providing Hour run meter of reputed make for four digit capacity conforming to BIS:722(Latest edition)/recommendations. HOUR RUN METER:- I) Type:-ii)Make:- iii)Capacity:- Hrs.1 Each
603Suitable three phase voltage monitor relay with all protection and usual indicator and electric siren against single phasing No/ low voltage,high voltage& overloading and phase voltage difference as per IS:3842with upto date ammendments.1 Each
604Change over switch of reputed make and suitable capacity1 Each
605Single phase preventor of reputed make and suitable capacity conforming to IS:1248 (P-V)-1983 with upto date ammendments.1 Each
606Supplyof Kirloskar/Leader/KSB/fouress/pellicon make of Cast steel double flangedsluice valve having size nominal delivery size of pump and capable of withstanding nominal seat pressure as mentioned in item No.10 (a)& conforming to BIS/API-standards with upto date ammendments for delivery line of pump.1 Each
607(Note:- The sluice valve shall conform to BIS-780-1984 latest with upto date ammedments. However, if the seat pressure exceeds the limits prescribed in BIS: 780 then the sluice valves shall be of Cast steel conforming to class 150 ASA (Seat pressure 21 kg/cm^2 ) or Class 300- ASA )Seat pressure 52 kg/cm^2) as per BS: 1414(API -600).
608Supply of Kirloskar/Kilburn/IVC/Fouress/Gled/BHEL/Leader/Bir/Kartar/ Pelocon make of Cast Iron/Cast Steel double flanged swing check type reflux valve for delivery line of pump having bye pass arrangement & sizeone size higher than the normal delivery size of .pump and capable of withstanding nominal seat pressureas mentioned in item No.1 0(a) & comforming toBIS/API standard with upto date ammendments for delivery line of pump.1 Each
609NOTE:- The reflux valve shall conform to BIS 5312-1984 (part I) latest with up to date ammendments. However if the seat pressure exceeds the limits prescribed in BIS 5312then the reflux valves shall be of cast steel conforming to class 150 ASA (Seat pressure 21 kg/cm^2)or Class 300 ASA (Seat pressure 52 kg/cm^2) as per BIS: 1414(API -600).
610Supply of Kirloskar/Kilburn/IVC/Fouress/Gled/BHEL/Leader/Bir/Kartar/ Pelocon make of suitable size Cast Steel double flanged swing check type reflux valve having bye pass arrangement & sizeequal to dia of Rising main as mentioned in item No.10 (c) for with standing normal seat pressure as per item No.10(a).1 Each
611NOTE:- The reflux valve shall conform to BIS 5312-1984 (part I) latest with up to date ammendments. However if the seat pressure exceeds the limits prescribed in BIS 5312then the reflux valves shall be of cast steel conforming to Class 150 ASA ((Seat pressure 21 kg/cm^2 class 300 ASA (Seat pressure 52 kg/cm^2) as per BS: 1414(API -600).
612Supply of Kirloskar/Jyoti/ Standard/Kilburn/Bir/ Kartar make cast iron flanged screwed type foot valve ( in case suction lift is involved) for suction pipe having size one or two size larger than suction size of pump such that velocity of flow is not more than 2.50 mtr/sec. with strainerhaving net area of its openings equal to three to four times of X-sectional area of flow in suction pipe conforming to BIS- 4038-1986 or latestwith up to date ammendments including all leads and lifts.1 Each
613Supply of Kirloskar/Kilburn/IVC/Fouress/Gled/BHEL/Leader/Bir/Kartar/ Pelocon make of Cast Iron double flanged sluice valve ( in case suction is +tive) for suction pipe havingsizeone or two size larger than suction size of pumpsuch that velocity of flow in suction pipe is not more than 2.50 mtrs/ sec. with stainerhet area of its openingequal to three to four timjes of X-sectional area of flow in suction pipe and conforming to BIS/API standards with upto date ammendments i/c all leads and lift and as directed by the Engineer-in-charge. 1 Each
614NOTE:- The reflux valve shall conform to BIS 5312-1984 (part I) latest with up to date ammendments. However if the seat pressure exceeds the limits prescribed in BIS 5312then the reflux valves shall be of cast steel conforming to class 150 ASA (Seat pressure 21 kg/cm^2)or Class 300 ASA (Seat pressure 52 kg/cm^2) as per BIS: 1414(API -600).
615Prov. laying jointing and testing at site suitable size copper PVC insulated armoured power three and half core cable conforming to BIS 1554 (Part.I) 1988 or latest upto date ammendments or siemens/Gloster/ ICC/ EICO/National/IEC make from meter of HPSEB to circuit breaker and from circuit breaker to bus bar switch and starter (one cable carrying all three phases) including all other electrical equipment/accessories, such as thimbles, flexble pipe, solder, nuts and bolts, cable glands etc. laid in pipes or trenches under floor. The type, size and make will be subject to approval of HPSEB authorities. In case ofnon acceptance by HPSEB authorities it shall have to be replaced by the tenderer free of cost i/c cost of carriage of material in all leads and lifts and as directed by the Engineer-in-charge. 1 Job
616Prov. laying jointing and testing at site suitable size copper PVC insulated armoured power threecore cable conforming to BIS 1554 (Part.I) 1988 or latest upto date ammendments or siemens/Gloster/ ICC/ EICO/ National/ IEC make from meter of HPSEB to circuit breaker and from circuit breaker to bus bar switch and starter (one cable carrying all three phases) including all other electrical equipment/ accessories, such as thimbles, flexble pipe, solder, nuts and bolts, cable glands etc. laid in pipes or trenches under floor. The type, size and make will be subject to approval of HPSEB authorities. In case ofnon acceptance by HPSEB authorities it shall have to be replaced by the tenderer free of cost i/c cost of carriage of material in all leads and lifts and as directed by the Engineer-in-charge.1 Job
617Providing and laying double loop earthing with copper plate 600mmx600mmx3mm thick electrode complete with material such as charcoal and commonsalt G.I.Pipes thimbles nuts and bolts,digging of pits, G.I.Wiring and 25x5mm copper strips of required capacity conforming to BIS 3043-1987 latest with upto dateammendments suitable for above motors and other electrical equipmentsi/c cost of carriage of material in all leads and liftsand as directed by the Engineer-in-charge. 1 Job
618Supply and errection of floor/wall mounted power factor shunt capacitor conforming to BIS:2834-1986 or latest with upto date ammendments of BHEL/GEC/Machneil/Mager/Bajaj/L&T make to raise the prevailing power factor at site to 0.95 for direct connection to induction motor individually of required KVAR according to HP of motor offered including cable Siemens/Gloster/ICC make from busbar chamber to capacitor & also including L&T/Kilburn/Standard/Siemens/Havells make ICTP switches conforming to BIS:4064-1978 or latest with HRC fuses (Range to be specified by the tenderer) i/c cost of carriage of material in all leads and lifts & as directed by Engineer-in-charge.1 L.S.
619Supply of 100mm circular dia pressure gauge of suitable range & standard make such as Fiebig/Bourden/ Precision/PREGA with all accessories such as stop cock, copper tubing etc.conformfing to BIS: 3624-1987 or latest with upto date ammendments.1 Each
620Prov. and fixing double flanged suction, delivery pipe and common header considering site requirement, NPSH required and available & common header having area equal to two times the area of delivery branch of pump including tapers, flanges, rubber gaskets 3mm thick as per BIS:2712-1978 nuts and bolts as per 1264-1983 & special upto 5mtrs. away from the outer wall of pump house as per layout drawings approved by Engneer-in-charge. The pipes shall be capable of with standing minimum 1.5 times the total pressure as indicated in item No.1(a) or total dynamic pressure+ surge pressure whichever is more. The size of suction pipe shall be one or two sizes larger than the suction size of pump such that velocity of flow in suction pipe is not more than 2.50 mtrs./sec. & delivery pipe shall be of size one size larger than nominal delivery size of pump i/c cost of carriage of material in all leads and lifts and as per directed by the Engineer-in-charge.1 Job
621NOTE:- Actual laying to be done as per final drawings to be approved by the Engineer-in-charge.
622Supply of antivibration pads conforming to BIS 6337-1971 or latest with upto date ammendments of suitable size for above machinery.1 Each
623Errection of allequipments including cost of tees, bends, tapers and any other fittings required as per site conditions & as per direction of Engineer-in-Charge.1 Job
624LWSS Tungesh Bhaila Stage-Ist.
625Supply, erection, testing & commissioning of horizontal spindle,horizontal split casing,radial split Single, /Multistages centrifugal pumpsor combination of pumps, in series/parallel of recommended make such as Mather and Platt/KSB//Becon weir/Kirloskar/ BE/Jyotior any other make approved from IPH Deptt.as per BIS 1520-1980 with upto date ammendments read with BIS 9137-1978 or latest edition to suitable for lifting clear water for under mentioned characteristics with bronze impellers/ priming funnels casing ring and shaft sleaves or bronze. shaft of steel grade-with cast iron casing coupled directly through a flexible coupling on a common C.I./Cast steel base plate (base plate to be from the manufacturers of the pumping unit only) to slip ring/squirrel cage screen protected drip proof induction motor of standard make such as Kirloskar/ Crompton/ Bhel/NGEF/ GEC/Siemen/Jyoti/ABBor any other make approved from IPH Deptt.suitable for operation on 415(+) /-10% volts, 50 cycles/ second, 3 phase AC electric supply. The power of electric motor should be atleast 10% in excess of the maximum power required by the pump in the operation range of (+) 10% and (-)15% of the duty point head. The motor should be as per IS:325-1978with upto date ammendments read with IS:900-1972. It should include cost of bearing nuts, bolts and pointing etc. and should meet the following requirements:-2x100 = 200 HP
626TotalHead:-384.00 mtrs.
627Discharge of each pump set:- 29.74 cum/Hr per set.
628Dia of R/Main:- 125 mm.
629Length of Rising Main ( In metres).:- 900 mtrs.
630SITE CONDITIONS& WATER CHARACTERSTICS:-
631Location of Site:-
632The altitude of place in which the motor is intended to work in ordinary service (in metres) :- To be filled by the Engineer Incharge.
633Humidity:-Weather generally remains humid during monsoon season.
634Nature of atmosphere:- As normally encountered in Shivalik ange.
635Detail of quality of water:-Potable drinking water.
636Water free from sand or not :-Free.
637Water corosive or not :-Not.
638Turbidity (if any):-To be filled by the Engineer Incharge.
639NPSH available:- To be filled by the Engineer Incharge.
640Any other information or requirement:-
641OPERATING CONDITIONS:-
642Type of current:- AC three/single phase
643Operating frequency:- 50 HZ
644Rated voltage:- 400 (+/-) 10% volts
645System of earthing if any to to be adopted.:-Double loop earthing as per BIS 3043-1987 latest with upto date ammendments.
646No. of working hours per day:- 8 hours
647Speed of revolution in RPM:- To be quoted by tenderer
648Direction of rotation:- To be quoted by tenderer
649The max. Temp. of cooling air & water in the place in which the motor is intented to work in ordinary service:- 35 Degree Centigrade.
650MOTOR:-
651Ref. to BIS code:-BIS 325-1978 read with BIS 900-1992(latest)with upto date ammendments
652Type of enclosure of motor:-SPDP(as per BIS 4691-1985 (latest)
653Type of duty:-Continuous as per IS-12824-1989 or latest with up to date ammendments
654Mechanical out put in KW:-Suitable for driving centrifugal pumps required for duties specified against pumps.To avoid overloading of motor amargin of about 15-20% may be kept in the rated out putof prime mover.
655Class of insulation:- Class ~B~
656Max.permissible temp.rise of motor reqd. if different from given in B(viii) above:-To be filled by the Engineer Incharge.
657Particulars of test reqd. & where they are to be conducted:-As per terms & conditions
658Particulars as to whether voltage limiting device will be employed:-ATS/Star delta starter, oil immersed, fully automatic to be installed between bus bar and motor shunt capacitor is also proposed to be installed for improving the power factor at site.
659(NOTE:- Star delta starter upto 37.5 KW, ATSbetween 37.5 KW to 50 KW and stator rotor starter with slip ring motor beyond 50 KW).
660Motor whether squirrel cage or slipring :-Squirrel cage/slip-ring (Note:- Squirrel cage upto 65 HP and slipring above 65 HP.
661Details of shaft extension reqd.:-Just sufficient to provide direct drive by flexible couplingto pump.
662Typeofslip-ringgearwhether continuously rated or for starting purposes only & whether to befitted with brush lifting or short circuit arrangements or both if interlocks are rquired.:-Continuously rated for Squirrel cage/ Slipring motor
663Breakway torque in terms of rated load torque & the correspondingbreakway starting current which may be taken from the supply withthe starting apparatus in circuit.:- Breakway torque to be given by the tenderer but the starting current should not exceed 2.5 times of the fullload current.
664Nature of load & any information regarding the driven machine whichhas a bearing upon the torque reqd. during the accelerated period, thekinetic energy of the moving partsto be accelrated & No.of startsduring a specified period.:- Sufficient to work the pump offered
665Where possible fault capacity ofthe system to which the motor is connected.:-The motor should be able to withstand initial current of 2.5 times the rated current for two minutes without sufferingdamages or permanent deformations.
666PUMP :-BIS 1520-1980read with BIS 9137-1978 bothwith up to date ammendments
667Nos of pumps reqd.:-2Nos. pumps .
668Spare parts required:-For 2 years normal maintenance as recommended by manufacturer.
669Optional fittings reqd.:-Air cock for exahausting air from each stage.
670PUMP OPERATING CONDITIONS:-
671TotalHead:- 384.00 mtrs.
672Discharge of each pump set:-29.74 cum/Hr per set.
673If total head is not known then
674following details be provided:-
675i) Static head ( in mtrs)336.00 Mtrs.
676ii) Minimum depth of water( in mtrs)
677iii) Variation in water level( in mtrs)
678iv) Ground level to max. water level ( in mtrs)
679v) Ground level to delivery point ( in mtrs)
680vi) Pressure in the suction tank(in Kg/cm^2 )
681vii) Pressure in the delivery tank (in Kg/cm^2 )
682Length of R/Main(in metres):-900 mtrs
683Dia of R/Main (in mm):- 125 mm.
684Drive arrangement:-Direct through flexible coupling on acommon base plate
685Drive type:- Electric driven
686NPSH reqd.:-To be quoted by the tenderer
687Limits of total head in which the pump is reqd. to operate.:-(-) 15% to (+) 10% of total head.
688Suction/delivery size of pump:-To be specified by the tenderer
689Efficiency of pump at:- To be specified by the tenderer
690a) duty head
691b) (+)10 % head
692c) (-) 15 % head
693Material of construction:- To be specified by the tenderer (manufacturer"s certficate to be appended)
694Supply of suitable direct on line/oil immersed star delta /ATS/Starter rotor starter of standard makesuch as MEI/Kilburn/Jyuoti/ Siemens/ Larson and Turbo conforming to BIS-8544-1979 latest with upto date ammendments for squirrel cage/slip-ring motor (make to be specified by the tenderers) mounted on panel board with magnetic type overload release & dash pot, time lag,under voltage release with initial oil filling. 2 Each
695Note:-Star delta starter upto 37.5 KW,ATS between 37.5 KW to 50 KW and starter rotor starter with slipring motor beyond 50 KW.
696Providing MS .sheet,16 SWG steel fabricated floor mounted closed(Almirah type) switch board including angle iron post of suitable height and size ISA 40x40x6mm,duly painted, comprising and capable of mounting the following accessories with all internal connections: The drawing of panel board shall be subject to approval of Engineer-in-charge.1 Job
697Ammeter AC supply 100mm dia circular dialAuto electrical AE/IMP/Havells make of suitable range for above motorwith selector switchesconforming to BIS:1248(P-II) 1983 with upto date ammendments.2 Each
698Voltmeter A.C. Supply 100mm dia circular dia Auto electric/AE/IMP/Havells make of suitable range with selector switches as per IS:4064-1978 with upto date ammendments.1 Each
699ICTP switches with HRC fuses ofKilburn/L&T/Siemens/Standard/Havells make and having Capacity 30% extra of the operational rating as per IS:4064-1978 with upto date ammendments immediately after the power meter of HPSEB. ICTP SWITCHES: I) Type :ii)Make:- iii)CapacityAmp. 2 Set
700Bus bar chamber having three copper bars of suitable rating for full length equal to the width of the board for three live phases and one copper bar of half the rating of full length for neutral phase as per BIS:8084-1976 and 11353-1985 read with 5578-1985 with upto date ammendments.BUS BAR CHAMBER:-i)Type: - . ii)Make:- iii)Rating 1 Set
701ACB/M.C.B/Oil Circuit Breaker of suitable capacity of Kilburn/ L&T/ MEI/GEC/Standard make on incoming feeder for motor offeredby the tenderer conforming to BIS-2516-1985 latest with upto date ammendments with initial oil filling whenever required and neutral linked under voltage release.1 Each
702Three phase Indicating lamps complete with toggle switches for individual motors as per IS 3452(P-I&II) with upto date ammendments. THREE PHASE INDICATOR:- i) Type:-ii) Make:- iii) Capacity.2 Set
703Earth leakage circuit breaker relay of recommended make such as (Kilburn/L&T/MEI/ GEC) conformingto BIS- 2516-1977 withuptodate ammendment and of suitable range which should have control box operating handle and trip/reset bush button on/off indicators, re-indicating off spring condition of the circuit breaker for over current protection.The circuit should be equipped with magnet thermal release with metallic tape etc. It shouldalso befitted with earth fault for tripping of breaker on occurrence of earth fault on off breaker load side end. ELCB/ELR:- I)Make :-(CEI approved). ii)Type: iii) Range. 1 Each
704Providing Hour run meter of reputed make for four digit capacity conforming to BIS:722(Latest edition)/recommendations. HOUR RUN METER:- I) Type:-ii)Make:- iii)Capacity:-Hrs. 2 Each
705Suitable three phase voltage monitor relay with all protection and usual indicator and electric siren against single phasing No/ low voltage,high voltage& overloading and phase voltage difference as per IS:3842with upto date ammendments.1 Each
706Change over switch of reputed make and suitable capacity1 Each
707Single phase preventor of reputed make and suitable capacity conforming to IS:1248 (P-V)-1983 with upto date ammendments.1 Each
708Supplyof Kirloskar/Leader/KSB/fouress/pellicon make of Cast steel double flangedsluice valve having size nominal delivery size of pump and capable of withstanding nominal seat pressure as mentioned in item No.1 (a)& conforming to BIS/API-standards with upto date ammendments for delivery line of pump. 2 Each
709(Note:- The sluice valve shall conform to BIS-780-1984 latest with upto date ammedments. However, if the seat pressure exceeds the limits prescribed in BIS: 780 then the sluice valves shall be of Cast steel conforming to class 150 ASA (Seat pressure 21 kg/cm^2 ) or Class 300- ASA )Seat pressure 52 kg/cm^2) as per BS: 1414(API -600).
710Supply of Kirloskar/Kilburn/IVC/Fouress/Gled/BHEL/Leader/Bir/Kartar/ Pelicon make of Cast Iron/Cast Steel double flanged swing check type reflux valve for delivery line of pump having bye pass arrangement & sizeone size higher than the normal delivery size of .pump and capable of withstanding nominal seat pressureas mentioned in item No.1 (a) & comforming toBIS/API standard with upto date ammendments for delivery line of pump.2 Each
711NOTE:- The reflux valve shall conform to BIS 5312-1984 (part I) latest with up to date ammendments. However if the seat pressure exceeds the limits prescribed in BIS 5312then the reflux valves shall be of cast steel conforming to class 150 ASA (Seat pressure 21 kg/cm^2)or Class 300 ASA (Seat pressure 52 kg/cm^2) as per BIS: 1414(API -600).
712Supply of Kirloskar/Kilburn/IVC/Fouress/Gled/BHEL/Leader/Bir/Kartar/ Pelicon make of suitable size Cast Steel double flanged swing check type reflux valve having bye pass arrangement & sizeequal to dia of Rising main as mentioned in item No.1 (c) for with standing normal seat pressure as per item No.1(a).1 Each
713NOTE:- The reflux valve shall conform to BIS 5312-1984 (part I) latest with up to date ammendments. However if the seat pressure exceeds the limits prescribed in BIS 5312then the reflux valves shall be of cast steel conforming to Class 150 ASA ((Seat pressure 21 kg/cm^2 class 300 ASA (Seat pressure 52 kg/cm^2) as per BS: 1414(API -600).
714Supply of Kirloskar/Jyoti/ Standard/Kilburn/Bir/ Kartar make cast iron flanged screwed type foot valve ( in case suction lift is involved) for suction pipe having size one or two size larger than suction size of pump such that velocity of flow is not more than 2.50 mtr/sec. with strainerhaving net area of its openings equal to three to four times of X-sectional area of flow in suction pipe conforming to BIS- 4038-1986 or latestwith up to date ammendments including all leads and lifts. 2 Each
715Supply of Kirloskar/Kilburn/IVC/Fouress/Gled/BHEL/Leader/Bir/Kartar/ Pelicon make of Cast Iron double flanged sluice valve ( in case suction is +tive) for suction pipe havingsizeone or two size larger than suction size of pumpsuch that velocity of flow in suction pipe is not more than 2.50 mtrs/ sec. with stainerhet area of its openingequal to three to four timjes of X-sectional area of flow in suction pipe and conforming to BIS/API standards with upto date ammendments i/c all leads and lift and as directed by the Engineer-in-charge. 2 Each
716NOTE:- The reflux valve shall conform to BIS 5312-1984 (part I) latest with up to date ammendments. However if the seat pressure exceeds the limits prescribed in BIS 5312then the reflux valves shall be of cast steel conforming to class 150 ASA (Seat pressure 21 kg/cm^2)or Class 300 ASA (Seat pressure 52 kg/cm^2) as per BIS: 1414(API -600).
717Prov. laying jointing and testing at site suitable size copper PVC insulated armoured power three and half core cable conforming to BIS 1554 (Part.I) 1988 or latest upto date ammendments or siemens/Gloster/ ICC/ EICO/National/IEC make from meter of HPSEB to circuit breaker and from circuit breaker to bus bar switch and starter (one cable carrying all three phases) including all other electrical equipment/accessories, such as thimbles, flexble pipe, solder, nuts and bolts, cable glands etc. laid in pipes or trenches under floor. The type, size and make will be subject to approval of HPSEB authorities. In case ofnon acceptance by HPSEB authorities it shall have to be replaced by the tenderer free of cost i/c cost of carriage of material in all leads and lifts and as directed by the Engineer-in-charge. 1 Job
718Prov. laying jointing and testing at site suitable size copper PVC insulated armoured power threecore cable conforming to BIS 1554 (Part.I) 1988 or latest upto date ammendments or siemens/Gloster/ ICC/ EICO/ National/ IEC make from meter of HPSEB to circuit breaker and from circuit breaker to bus bar switch and starter (one cable carrying all three phases) including all other electrical equipment/accessories, such as thimbles, flexble pipe, solder, nuts and bolts, cable glands etc. laid in pipes or trenches under floor. The type, size and make will be subject to approval of HPSEB authorities. In case ofnon acceptance by HPSEB authorities it shall have to be replaced by the tenderer free of cost i/c cost of carriage of material in all leads and lifts and as directed by the Engineer-in-charge. 1 Job
719Providing and laying double loop earthing with copper plate 600mmx600mmx3mm thick electrode complete with material such as charcoal and commonsalt G.I.Pipes thimbles nuts and bolts,digging of pits, G.I.Wiring and 25x5mm copper strips of required capacity conforming to BIS 3043-1987 latest with upto dateammendments suitable for above motors and other electrical equipmentsi/c cost of carriage of material in all leads and liftsand as directed by the Engineer-in-charge. 1 Job
720Supply and errection of floor/wall mounted power factor shunt capacitor conforming to BIS:2834-1986 or latest with upto date ammendments of BHEL/GEC/Machneil/Mager/Bajaj/L&T make to raise the prevailing power factor at site to 0.95 for direct connection to induction motor individually of required KVAR according to HP of motor offered including cable Siemens/Gloster/ICC make from busbar chamber to capacitor & also including L&T/Kilburn/Standard/Siemens/Havells make ICTP switches conforming to BIS:4064-1978 or latest with HRC fuses (Range to be specified by the tenderer) i/c cost of carriage of material in all leads and lifts & as directed by Engineer-in-charge. 2 L.S.
721Supply of 100mm circular dia pressure gauge of suitable range & standard make such as Fiebig/Bourden/ Precision/PREGA with all accessories such as stop cock, copper tubing etc.conformfing to BIS: 3624-1987 or latest with upto date ammendments.2 Each
722Prov. and fixing double flanged suction, delivery pipe and common header considering site requirement, NPSH required and available & common header having area equal to two times the area of delivery branch of pump including tapers, flanges, rubber gaskets 3mm thick as per BIS:2712-1978 nuts and bolts as per 1264-1983 & special upto 5mtrs. away from the outer wall of pump house as per layout drawings approved by Engneer-in-charge. The pipes shall be capable of with standing minimum 1.5 times the total pressure as indicated in item No.1(a) or total dynamic pressure+ surge pressure whichever is more. The size of suction pipe shall be one or two sizes larger than the suction size of pump such that velocity of flow in suction pipe is not more than 2.50 mtrs./sec. & delivery pipe shall be of size one size larger than nominal delivery size of pump i/c cost of carriage of material in all leads and lifts and as per directed by the Engineer-in-charge.1 Job
723NOTE:- Actual laying to be done as per final drawings to be approved by the Engineer-in-charge.
724Supply of antivibration pads conforming to BIS 6337-1971 or latest with upto date ammendments of suitable size for above machinery.2 Each
725Errection of allequipments including cost of tees, bends, tapers and any other fittings required as per site conditions & as per direction of Engineer-in-Charge. 1 Job
726LWSS Tungesh Bhaila Stage-IInd.
727Supply, erection, testing & commissioning of horizontal spindle,horizontal split casing,radial split Single, /Multistages centrifugal pumpsor combination of pumps, in series/parallel of recommended make such as Mather and Platt/KSB//Becon weir/Kirloskar/ BE/Jyotior any other make approved from IPH Deptt.as per BIS 1520-1980 with upto date ammendments read with BIS 9137-1978 or latest edition to suitable for lifting clear water for under mentioned characteristics with bronze impellers/ priming funnels casing ring and shaft sleaves or bronze. shaft of steel grade-with cast iron casing coupled directly through a flexible coupling on a common C.I./Cast steel base plate (base plate to be from the manufacturers of the pumping unit only) to slip ring/squirrel cage screen protected drip proof induction motor of standard make such as Kirloskar/ Crompton/ Bhel/NGEF/ GEC/Siemen/Jyoti/ABBor any other make approved from IPH Deptt.suitable for operation on 415(+) /-10% volts, 50 cycles/ second, 3 phase AC electric supply. The power of electric motor should be atleast 10% in excess of the maximum power required by the pump in the operation range of (+) 10% and (-)15% of the duty point head. The motor should be as per IS:325-1978with upto date ammendments read with IS:900-1972. It should include cost of bearing nuts, bolts and pointing etc. and should meet the following requirements:-1x50=50 HP
728TotalHead:-259.60 mtrs.
729Discharge of each pump set:- 29.62 cum/Hr per set.
730Dia of R/Main:- 100 mm.
731Length of Rising Main ( In metres).:- 850 mtrs.
732SITE CONDITIONS& WATER CHARACTERSTICS:-
733Location of Site:-
734The altitude of place in which the motor is intended to work in ordinary service (in metres) :- To be filled by the Engineer Incharge.
735Humidity:-Weather generally remains humid during monsoon season.
736Nature of atmosphere:- As normally encountered in Shivalik ange.
737Detail of quality of water:-Potable drinking water.
738Water free from sand or not :-Free.
739Water corosive or not :-Not.
740Turbidity (if any):-To be filled by the Engineer Incharge.
741NPSH available:- To be filled by the Engineer Incharge.
742Any other information or requirement:-
743OPERATING CONDITIONS:-
744Type of current:- AC three/single phase
745Operating frequency:- 50 HZ
746Rated voltage:- 400 (+/-) 10% volts
747System of earthing if any to to be adopted.:-Double loop earthing as per BIS 3043-1987 latest with upto date ammendments.
748No. of working hours per day:- 8 hours
749Speed of revolution in RPM:- To be quoted by tenderer
750Direction of rotation:- To be quoted by tenderer
751The max. Temp. of cooling air & water in the place in which the motor is intented to work in ordinary service:- 35 Degree Centigrade.
752MOTOR:-
753Ref. to BIS code:- BIS 325-1978 read with BIS 900-1992(latest)with upto date ammendments
754Type of enclosure of motor:-SPDP(as per BIS 4691-1985 (latest)
755Type of duty:-Continuous as per IS-12824-1989 or latest with up to date ammendments
756Mechanical out put in KW:-Suitable for driving centrifugal pumps required for duties specified against pumps.To avoid overloading of motor amargin of about 15-20% may be kept in the rated out putof prime mover.
757Class of insulation:- Class ~B~
758Max.permissible temp.rise of motor reqd. if different from given in B(viii) above:-To be filled by the Engineer Incharge.
759Particulars of test reqd. & where they are to be conducted:-As per terms & conditions
760Particulars as to whether voltage limiting device will be employed:-ATS/Star delta starter, oil immersed, fully automatic to be installed between bus bar and motor shunt capacitor is also proposed to be installed for improving the power factor at site.
761(NOTE:- Star delta starter upto 37.5 KW, ATSbetween 37.5 KW to 50 KW and stator rotor starter with slip ring motor beyond 50 KW).
762Motor whether squirrel cage or slipring :-Squirrel cage/slip-ring (Note:- Squirrel cage upto 65 HP and slipring above 65 HP.
763Details of shaft extension reqd.:-Just sufficient to provide direct drive by flexible couplingto pump.
764Typeofslip-ringgearwhether continuously rated or for starting purposes only & whether to befitted with brush lifting or short circuit arrangements or both if interlocks are rquired.:-Continuously rated for Squirrel cage/ Slipring motor
765Breakway torque in terms of rated load torque & the correspondingbreakway starting current which may be taken from the supply withthe starting apparatus in circuit.:- Breakway torque to be given by the tenderer but the starting current should not exceed 2.5 times of the fullload current.
766Nature of load & any information regarding the driven machine whichhas a bearing upon the torque reqd. during the accelerated period, thekinetic energy of the moving partsto be accelrated & No.of startsduring a specified period.:- Sufficient to work the pump offered
767Where possible fault capacity ofthe system to which the motor is connected.:-The motor should be able to withstand initial current of 2.5 times the rated current for two minutes without sufferingdamages or permanent deformations.
768PUMP :-BIS 1520-1980read with BIS 9137-1978 bothwith up to date ammendments
769Nos of pumps reqd.:-1No. pumps .
770Spare parts required:-For 2 years normal maintenance as recommended by manufacturer.
771Optional fittings reqd.:-Air cock for exahausting air from each stage.
772PUMP OPERATING CONDITIONS:-
773TotalHead:-259.60 mtrs.
774Discharge of each pump set:- 29.62 cum/Hr per set.
775If total head is not known then
776following details be provided:-
777i) Static head ( in mtrs)208.55 Mtrs.
778ii) Minimum depth of water( in mtrs)
779iii) Variation in water level( in mtrs)
780iv) Ground level to max. water level ( in mtrs)
781v) Ground level to delivery point ( in mtrs)
782vi) Pressure in the suction tank(in Kg/cm^2 )
783vii) Pressure in the delivery tank (in Kg/cm^2 )
784Length of R/Main(in metres):-850 mtrs
785Dia of R/Main (in mm):- 100 mm.
786Drive arrangement:-Direct through flexible coupling on acommon base plate
787Drive type:- Electric driven
788NPSH reqd.:-To be quoted by the tenderer
789Limits of total head in which the pump is reqd. to operate.:-(-) 15% to (+) 10% of total head.
790Suction/delivery size of pump:-To be specified by the tenderer
791Efficiency of pump at:- To be specified by the tenderer
792a) duty head
793b) (+)10 % head
794c) (-) 15 % head
795Material of construction:-To be specified by the tenderer (manufacturer"s certficate to be appended) 1 Each
796Supply of suitable direct on line/oil immersed star delta /ATS/Starter rotor starter of standard makesuch as MEI/Kilburn/Jyuoti/ Siemens/ Larson and Turbo conforming to BIS-8544-1979 latest with upto date ammendments for squirrel cage/slip-ring motor (make to be specified by the tenderers) mounted on panel board with magnetic type overload release & dash pot, time lag,under voltage release with initial oil filling. 1 Each
797Note:-Star delta starter upto 37.5 KW,ATS between 37.5 KW to 50 KW and starter rotor starter with slipring motor beyond 50 KW.
798Providing MS .sheet,16 SWG steel fabricated floor mounted closed(Almirah type) switch board including angle iron post of suitable height and size ISA 40x40x6mm,duly painted, comprising and capable of mounting the following accessories with all internal connections: The drawing of panel board shall be subject to approval of Engineer-in-charge. 1 Job
799Ammeter AC supply 100mm dia circular dialAuto electrical AE/IMP/Havells make of suitable range for above motorwith selector switchesconforming to BIS:1248(P-II) 1983 with upto date ammendments.1 Each
800Voltmeter A.C. Supply 100mm dia circular dia Auto electric/AE/IMP/Havells make of suitable range with selector switches as per IS:4064-1978 with upto date ammendments.1 Each
801ICTP switches with HRC fuses ofKilburn/L&T/Siemens/Standard/Havells make and having Capacity 30% extra of the operational rating as per IS:4064-1978 with upto date ammendments immediately after the power meter of HPSEB. ICTP SWITCHES: I) Type :ii)Make:- iii)CapacityAmp.1 Set
802Bus bar chamber having three copper bars of suitable rating for full length equal to the width of the board for three live phases and one copper bar of half the rating of full length for neutral phase as per BIS:8084-1976 and 11353-1985 read with 5578-1985 with upto date ammendments.BUS BAR CHAMBER:-i)Type: - . ii)Make:- iii)Rating 1 Set
803ACB/M.C.B/Oil Circuit Breaker of suitable capacity of Kilburn/ L&T/ MEI/GEC/Standard make on incoming feeder for motor offeredby the tenderer conforming to BIS-2516-1985 latest with upto date ammendments with initial oil filling whenever required and neutral linked under voltage release. 1 Each
804Three phase Indicating lamps complete with toggle switches for individual motors as per IS 3452(P-I&II) with upto date ammendments. THREE PHASE INDICATOR:- i) Type:-ii) Make:- iii) Capacity.1 Set
805Earth leakage circuit breaker relay of recommended make such as (Kilburn/L&T/MEI/ GEC) conformingto BIS- 2516-1977 withuptodate ammendment and of suitable range which should have control box operating handle and trip/reset bush button on/off indicators, re-indicating off spring condition of the circuit breaker for over current protection.The circuit should be equipped with magnet thermal release with metallic tape etc. It shouldalso befitted with earth fault for tripping of breaker on occurrence of earth fault on off breaker load side end. ELCB/ELR:- I)Make :-(CEI approved). ii)Type: iii) Range.1 Each
806Providing Hour run meter of reputed make for four digit capacity conforming to BIS:722(Latest edition)/recommendations. HOUR RUN METER:- I) Type:-ii)Make:- iii)Capacity:- Hrs. 1 Each
807Suitable three phase voltage monitor relay with all protection and usual indicator and electric siren against single phasing No/ low voltage,high voltage& overloading and phase voltage difference as per IS:3842with upto date ammendments.1 Each
808Change over switch of reputed make and suitable capacity1 Each
809Single phase preventor of reputed make and suitable capacity conforming to IS:1248 (P-V)-1983 with upto date ammendments.1 Each
810Supplyof Kirloskar/Leader/KSB/fouress/pellicon make of Cast steel double flangedsluice valve having size nominal delivery size of pump and capable of withstanding nominal seat pressure as mentioned in item No.10 (a)& conforming to BIS/API-standards with upto date ammendments for delivery line of pump.1 Each
811(Note:- The sluice valve shall conform to BIS-780-1984 latest with upto date ammedments. However, if the seat pressure exceeds the limits prescribed in BIS: 780 then the sluice valves shall be of Cast steel conforming to class 150 ASA (Seat pressure 21 kg/cm^2 ) or Class 300- ASA )Seat pressure 52 kg/cm^2) as per BS: 1414(API -600).
812Supply of Kirloskar/Kilburn/IVC/Fouress/Gled/BHEL/Leader/Bir/Kartar/ Pelocon make of Cast Iron/Cast Steel double flanged swing check type reflux valve for delivery line of pump having bye pass arrangement & sizeone size higher than the normal delivery size of .pump and capable of withstanding nominal seat pressureas mentioned in item No.1 0(a) & comforming toBIS/API standard with upto date ammendments for delivery line of pump.1 Each
813NOTE:- The reflux valve shall conform to BIS 5312-1984 (part I) latest with up to date ammendments. However if the seat pressure exceeds the limits prescribed in BIS 5312then the reflux valves shall be of cast steel conforming to class 150 ASA (Seat pressure 21 kg/cm^2)or Class 300 ASA (Seat pressure 52 kg/cm^2) as per BIS: 1414(API -600).
814Supply of Kirloskar/Kilburn/IVC/Fouress/Gled/BHEL/Leader/Bir/Kartar/ Pelocon make of suitable size Cast Steel double flanged swing check type reflux valve having bye pass arrangement & sizeequal to dia of Rising main as mentioned in item No.10 (c) for with standing normal seat pressure as per item No.10(a).1 Each
815NOTE:- The reflux valve shall conform to BIS 5312-1984 (part I) latest with up to date ammendments. However if the seat pressure exceeds the limits prescribed in BIS 5312then the reflux valves shall be of cast steel conforming to Class 150 ASA ((Seat pressure 21 kg/cm^2 class 300 ASA (Seat pressure 52 kg/cm^2) as per BS: 1414(API -600).
816Supply of Kirloskar/Jyoti/ Standard/Kilburn/Bir/ Kartar make cast iron flanged screwed type foot valve ( in case suction lift is involved) for suction pipe having size one or two size larger than suction size of pump such that velocity of flow is not more than 2.50 mtr/sec. with strainerhaving net area of its openings equal to three to four times of X-sectional area of flow in suction pipe conforming to BIS- 4038-1986 or latestwith up to date ammendments including all leads and lifts. 1 Each
817Supply of Kirloskar/Kilburn/IVC/Fouress/Gled/BHEL/Leader/Bir/Kartar/ Pelocon make of Cast Iron double flanged sluice valve ( in case suction is +tive) for suction pipe havingsizeone or two size larger than suction size of pumpsuch that velocity of flow in suction pipe is not more than 2.50 mtrs/ sec. with stainerhet area of its openingequal to three to four timjes of X-sectional area of flow in suction pipe and conforming to BIS/API standards with upto date ammendments i/c all leads and lift and as directed by the Engineer-in-charge. 1 Each
818NOTE:- The reflux valve shall conform to BIS 5312-1984 (part I) latest with up to date ammendments. However if the seat pressure exceeds the limits prescribed in BIS 5312then the reflux valves shall be of cast steel conforming to class 150 ASA (Seat pressure 21 kg/cm^2)or Class 300 ASA (Seat pressure 52 kg/cm^2) as per BIS: 1414(API -600).
819Prov. laying jointing and testing at site suitable size copper PVC insulated armoured power three and half core cable conforming to BIS 1554 (Part.I) 1988 or latest upto date ammendments or siemens/Gloster/ ICC/ EICO/National/IEC make from meter of HPSEB to circuit breaker and from circuit breaker to bus bar switch and starter (one cable carrying all three phases) including all other electrical equipment/accessories, such as thimbles, flexble pipe, solder, nuts and bolts, cable glands etc. laid in pipes or trenches under floor. The type, size and make will be subject to approval of HPSEB authorities. In case ofnon acceptance by HPSEB authorities it shall have to be replaced by the tenderer free of cost i/c cost of carriage of material in all leads and lifts and as directed by the Engineer-in-charge.1 Job
820Prov. laying jointing and testing at site suitable size copper PVC insulated armoured power threecore cable conforming to BIS 1554 (Part.I) 1988 or latest upto date ammendments or siemens/Gloster/ ICC/ EICO/ National/ IEC make from meter of HPSEB to circuit breaker and from circuit breaker to bus bar switch and starter (one cable carrying all three phases) including all other electrical equipment/ accessories, such as thimbles, flexble pipe, solder, nuts and bolts, cable glands etc. laid in pipes or trenches under floor. The type, size and make will be subject to approval of HPSEB authorities. In case ofnon acceptance by HPSEB authorities it shall have to be replaced by the tenderer free of cost i/c cost of carriage of material in all leads and lifts and as directed by the Engineer-in-charge. 1 Job
821Providing and laying double loop earthing with copper plate 600mmx600mmx3mm thick electrode complete with material such as charcoal and commonsalt G.I.Pipes thimbles nuts and bolts,digging of pits, G.I.Wiring and 25x5mm copper strips of required capacity conforming to BIS 3043-1987 latest with upto dateammendments suitable for above motors and other electrical equipmentsi/c cost of carriage of material in all leads and liftsand as directed by the Engineer-in-charge.1 Job
822Supply and errection of floor/wall mounted power factor shunt capacitor conforming to BIS:2834-1986 or latest with upto date ammendments of BHEL/GEC/Machneil/Mager/Bajaj/L&T make to raise the prevailing power factor at site to 0.95 for direct connection to induction motor individually of required KVAR according to HP of motor offered including cable Siemens/Gloster/ICC make from busbar chamber to capacitor & also including L&T/Kilburn/Standard/Siemens/Havells make ICTP switches conforming to BIS:4064-1978 or latest with HRC fuses (Range to be specified by the tenderer) i/c cost of carriage of material in all leads and lifts & as directed by Engineer-in-charge.1 L.S.
823Supply of 100mm circular dia pressure gauge of suitable range & standard make such as Fiebig/Bourden/ Precision/PREGA with all accessories such as stop cock, copper tubing etc.conformfing to BIS: 3624-1987 or latest with upto date ammendments. 1 Each
824Prov. and fixing double flanged suction, delivery pipe and common header considering site requirement, NPSH required and available & common header having area equal to two times the area of delivery branch of pump including tapers, flanges, rubber gaskets 3mm thick as per BIS:2712-1978 nuts and bolts as per 1264-1983 & special upto 5mtrs. away from the outer wall of pump house as per layout drawings approved by Engneer-in-charge. The pipes shall be capable of with standing minimum 1.5 times the total pressure as indicated in item No.1(a) or total dynamic pressure+ surge pressure whichever is more. The size of suction pipe shall be one or two sizes larger than the suction size of pump such that velocity of flow in suction pipe is not more than 2.50 mtrs./sec. & delivery pipe shall be of size one size larger than nominal delivery size of pump i/c cost of carriage of material in all leads and lifts and as per directed by the Engineer-in-charge. 1 Job
825NOTE:- Actual laying to be done as per final drawings to be approved by the Engineer-in-charge.
826Supply of antivibration pads conforming to BIS 6337-1971 or latest with upto date ammendments of suitable size for above machinery. 1 Each
827Errection of allequipments including cost of tees, bends, tapers and any other fittings required as per site conditions & as per direction of Engineer-in-Charge.1 Job
828LWSS Majhar Stage-Ist.
829Supply, erection, testing & commissioning of horizontal spindle,horizontal split casing,radial split Single, /Multistages centrifugal pumpsor combination of pumps, in series/parallel of recommended make such as Mather and Platt/KSB//Becon weir/Kirloskar/ BE/Jyotior any other make approved from IPH Deptt.as per BIS 1520-1980 with upto date ammendments read with BIS 9137-1978 or latest edition to suitable for lifting clear water for under mentioned characteristics with bronze impellers/ priming funnels casing ring and shaft sleaves or bronze. shaft of steel grade-with cast iron casing coupled directly through a flexible coupling on a common C.I./Cast steel base plate (base plate to be from the manufacturers of the pumping unit only) to slip ring/squirrel cage screen protected drip proof induction motor of standard make such as Kirloskar/ Crompton/ Bhel/NGEF/ GEC/Siemen/Jyoti/ABBor any other make approved from IPH Deptt.suitable for operation on 415(+) /-10% volts, 50 cycles/ second, 3 phase AC electric supply. The power of electric motor should be atleast 10% in excess of the maximum power required by the pump in the operation range of (+) 10% and (-)15% of the duty point head. The motor should be as per IS:325-1978with upto date ammendments read with IS:900-1972. It should include cost of bearing nuts, bolts and pointing etc. and should meet the following requirements:- 1x75 = 75 HP
830TotalHead:-448.00 mtrs.
831Discharge of each pump set:- 13.80 cum/Hr per set.
832Dia of R/Main:- 80 mm.
833Length of Rising Main ( In metres).:- 1290 mtrs.
834SITE CONDITIONS& WATER CHARACTERSTICS:-
835Location of Site:-
836The altitude of place in which the motor is intended to work in ordinary service (in metres) :- To be filled by the Engineer Incharge.
837Humidity:-Weather generally remains humid during monsoon season.
838Nature of atmosphere:- As normally encountered in Shivalik ange.
839Detail of quality of water:-Potable drinking water.
840Water free from sand or not :-Free.
841Water corosive or not :-Not.
842Turbidity (if any):-To be filled by the Engineer Incharge.
843NPSH available:- To be filled by the Engineer Incharge.
844Any other information or requirement:-
845OPERATING CONDITIONS:-
846Type of current:- AC three/single phase
847Operating frequency:- 50 HZ
848Rated voltage:- 400 (+/-) 10% volts
849System of earthing if any to to be adopted.:-Double loop earthing as per BIS 3043-1987 latest with upto date ammendments.
850No. of working hours per day:- 8 hours
851Speed of revolution in RPM:- To be quoted by tenderer
852Direction of rotation:- To be quoted by tenderer
853The max. Temp. of cooling air & water in the place in which the motor is intented to work in ordinary service:- 35 Degree Centigrade.
854MOTOR:-
855Ref. to BIS code:-BIS 325-1978 read with BIS 900-1992(latest)with upto date ammendments
856Type of enclosure of motor:-SPDP(as per BIS 4691-1985 (latest)
857Type of duty:-Continuous as per IS-12824-1989 or latest with up to date ammendments
858Mechanical out put in KW:-Suitable for driving centrifugal pumps required for duties specified against pumps.To avoid overloading of motor amargin of about 15-20% may be kept in the rated out putof prime mover.
859Class of insulation:- Class ~B~
860Max.permissible temp.rise of motor reqd. if different from given in B(viii) above:-To be filled by the Engineer Incharge.
861Particulars of test reqd. & where they are to be conducted:-As per terms & conditions
862Particulars as to whether voltage limiting device will be employed:-ATS/Star delta starter, oil immersed, fully automatic to be installed between bus bar and motor shunt capacitor is also proposed to be installed for improving the power factor at site.
863(NOTE:- Star delta starter upto 37.5 KW, ATSbetween 37.5 KW to 50 KW and stator rotor starter with slip ring motor beyond 50 KW).
864Motor whether squirrel cage or slipring :-Squirrel cage/slip-ring (Note:- Squirrel cage upto 65 HP and slipring above 65 HP.
865Details of shaft extension reqd.:-Just sufficient to provide direct drive by flexible couplingto pump.
866Typeofslip-ringgearwhether continuously rated or for starting purposes only & whether to befitted with brush lifting or short circuit arrangements or both if interlocks are rquired.:-Continuously rated for Squirrel cage/ Slipring motor
867Breakway torque in terms of rated load torque & the correspondingbreakway starting current which may be taken from the supply withthe starting apparatus in circuit.:- Breakway torque to be given by the tenderer but the starting current should not exceed 2.5 times of the fullload current.
868Nature of load & any information regarding the driven machine whichhas a bearing upon the torque reqd. during the accelerated period, thekinetic energy of the moving partsto be accelrated & No.of startsduring a specified period.:- Sufficient to work the pump offered
869Where possible fault capacity ofthe system to which the motor is connected.:-The motor should be able to withstand initial current of 2.5 times the rated current for two minutes without sufferingdamages or permanent deformations.
870PUMP :-BIS 1520-1980read with BIS 9137-1978 bothwith up to date ammendments
871Nos of pumps reqd.:-1No. pumps .
872Spare parts required:-For 2 years normal maintenance as recommended by manufacturer.
873Optional fittings reqd.:-Air cock for exahausting air from each stage.
874PUMP OPERATING CONDITIONS:-
875TotalHead:-448.00 mtrs.
876Discharge of each pump set:- 13.80 cum/Hr per set.
877If total head is not known then
878following details be provided:-
879i) Static head ( in mtrs)422.00 Mtrs.
880ii) Minimum depth of water( in mtrs)
881iii) Variation in water level( in mtrs)
882iv) Ground level to max. water level ( in mtrs)
883v) Ground level to delivery point ( in mtrs)
884vi) Pressure in the suction tank(in Kg/cm^2 )
885vii) Pressure in the delivery tank (in Kg/cm^2 )
886Length of R/Main(in metres):-1290 mtrs
887Dia of R/Main (in mm):- 80 mm.
888Drive arrangement:-Direct through flexible coupling on acommon base plate
889Drive type:- Electric driven
890NPSH reqd.:-To be quoted by the tenderer
891Limits of total head in which the pump is reqd. to operate.:-(-) 15% to (+) 10% of total head.
892Suction/delivery size of pump:-To be specified by the tenderer
893Efficiency of pump at:- To be specified by the tenderer
894a) duty head
895b) (+)10 % head
896c) (-) 15 % head
897Material of construction:- To be specified by the tenderer (manufacturer"s certficate to be appended)
898Supply of suitable direct on line/oil immersed star delta /ATS/Starter rotor starter of standard makesuch as MEI/Kilburn/Jyuoti/ Siemens/ Larson and Turbo conforming to BIS-8544-1979 latest with upto date ammendments for squirrel cage/slip-ring motor (make to be specified by the tenderers) mounted on panel board with magnetic type overload release & dash pot, time lag,under voltage release with initial oil filling. 1 Each
899Note:-Star delta starter upto 37.5 KW,ATS between 37.5 KW to 50 KW and starter rotor starter with slipring motor beyond 50 KW.
900Providing MS .sheet,16 SWG steel fabricated floor mounted closed(Almirah type) switch board including angle iron post of suitable height and size ISA 40x40x6mm,duly painted, comprising and capable of mounting the following accessories with all internal connections: The drawing of panel board shall be subject to approval of Engineer-in-charge.1 Job
901Ammeter AC supply 100mm dia circular dialAuto electrical AE/IMP/Havells make of suitable range for above motorwith selector switchesconforming to BIS:1248(P-II) 1983 with upto date ammendments.1 Each
902Voltmeter A.C. Supply 100mm dia circular dia Auto electric/AE/IMP/Havells make of suitable range with selector switches as per IS:4064-1978 with upto date ammendments.1 Each
903ICTP switches with HRC fuses ofKilburn/L&T/Siemens/Standard/Havells make and having Capacity 30% extra of the operational rating as per IS:4064-1978 with upto date ammendments immediately after the power meter of HPSEB. ICTP SWITCHES: I) Type :ii)Make:- iii)CapacityAmp.1 Set
904Bus bar chamber having three copper bars of suitable rating for full length equal to the width of the board for three live phases and one copper bar of half the rating of full length for neutral phase as per BIS:8084-1976 and 11353-1985 read with 5578-1985 with upto date ammendments.BUS BAR CHAMBER:-i)Type: - . ii)Make:- iii)Rating 1 Set
905ACB/M.C.B/Oil Circuit Breaker of suitable capacity of Kilburn/ L&T/ MEI/GEC/Standard make on incoming feeder for motor offeredby the tenderer conforming to BIS-2516-1985 latest with upto date ammendments with initial oil filling whenever required and neutral linked under voltage release.1 Each
906Three phase Indicating lamps complete with toggle switches for individual motors as per IS 3452(P-I&II) with upto date ammendments. THREE PHASE INDICATOR:- i) Type:-ii) Make:- iii) Capacity. 1 Set
907Earth leakage circuit breaker relay of recommended make such as (Kilburn/L&T/MEI/ GEC) conformingto BIS- 2516-1977 withuptodate ammendment and of suitable range which should have control box operating handle and trip/reset bush button on/off indicators, re-indicating off spring condition of the circuit breaker for over current protection.The circuit should be equipped with magnet thermal release with metallic tape etc. It shouldalso befitted with earth fault for tripping of breaker on occurrence of earth fault on off breaker load side end. ELCB/ELR:- I)Make :-(CEI approved). ii)Type: iii) Range.1 Each
908Providing Hour run meter of reputed make for four digit capacity conforming to BIS:722(Latest edition)/recommendations.HOUR RUN METER:- I) Type:-ii)Make:- iii)Capacity:-Hrs. 1 Each
909Suitable three phase voltage monitor relay with all protection and usual indicator and electric siren against single phasing No/ low voltage,high voltage& overloading and phase voltage difference as per IS:3842with upto date ammendments. 1 Each
910Change over switch of reputed make and suitable capacity1 Each
911Single phase preventor of reputed make and suitable capacity conforming to IS:1248 (P-V)-1983 with upto date ammendments.1 Each
912Supplyof Kirloskar/Leader/KSB/fouress/pellicon make of Cast steel double flangedsluice valve having size nominal delivery size of pump and capable of withstanding nominal seat pressure as mentioned in item No.1 (a)& conforming to BIS/API-standards with upto date ammendments for delivery line of pump.1 Each
913(Note:- The sluice valve shall conform to BIS-780-1984 latest with upto date ammedments. However, if the seat pressure exceeds the limits prescribed in BIS: 780 then the sluice valves shall be of Cast steel conforming to class 150 ASA (Seat pressure 21 kg/cm^2 ) or Class 300- ASA )Seat pressure 52 kg/cm^2) as per BS: 1414(API -600).
914Supply of Kirloskar/Kilburn/IVC/Fouress/Gled/BHEL/Leader/Bir/Kartar/ Pelicon make of Cast Iron/Cast Steel double flanged swing check type reflux valve for delivery line of pump having bye pass arrangement & sizeone size higher than the normal delivery size of .pump and capable of withstanding nominal seat pressureas mentioned in item No.1 (a) & comforming toBIS/API standard with upto date ammendments for delivery line of pump.1 Each
915NOTE:- The reflux valve shall conform to BIS 5312-1984 (part I) latest with up to date ammendments. However if the seat pressure exceeds the limits prescribed in BIS 5312then the reflux valves shall be of cast steel conforming to class 150 ASA (Seat pressure 21 kg/cm^2)or Class 300 ASA (Seat pressure 52 kg/cm^2) as per BIS: 1414(API -600).
916Supply of Kirloskar/Kilburn/IVC/Fouress/Gled/BHEL/Leader/Bir/Kartar/ Pelicon make of suitable size Cast Steel double flanged swing check type reflux valve having bye pass arrangement & sizeequal to dia of Rising main as mentioned in item No.1 (c) for with standing normal seat pressure as per item No.1(a).1 Each
917NOTE:- The reflux valve shall conform to BIS 5312-1984 (part I) latest with up to date ammendments. However if the seat pressure exceeds the limits prescribed in BIS 5312then the reflux valves shall be of cast steel conforming to Class 150 ASA ((Seat pressure 21 kg/cm^2 class 300 ASA (Seat pressure 52 kg/cm^2) as per BS: 1414(API -600).
918Supply of Kirloskar/Jyoti/ Standard/Kilburn/Bir/ Kartar make cast iron flanged screwed type foot valve ( in case suction lift is involved) for suction pipe having size one or two size larger than suction size of pump such that velocity of flow is not more than 2.50 mtr/sec. with strainerhaving net area of its openings equal to three to four times of X-sectional area of flow in suction pipe conforming to BIS- 4038-1986 or latestwith up to date ammendments including all leads and lifts. 1 Each
919Supply of Kirloskar/Kilburn/IVC/Fouress/Gled/BHEL/Leader/Bir/Kartar/ Pelicon make of Cast Iron double flanged sluice valve ( in case suction is +tive) for suction pipe havingsizeone or two size larger than suction size of pumpsuch that velocity of flow in suction pipe is not more than 2.50 mtrs/ sec. with stainerhet area of its openingequal to three to four timjes of X-sectional area of flow in suction pipe and conforming to BIS/API standards with upto date ammendments i/c all leads and lift and as directed by the Engineer-in-charge.1 Each
920NOTE:- The reflux valve shall conform to BIS 5312-1984 (part I) latest with up to date ammendments. However if the seat pressure exceeds the limits prescribed in BIS 5312then the reflux valves shall be of cast steel conforming to class 150 ASA (Seat pressure 21 kg/cm^2)or Class 300 ASA (Seat pressure 52 kg/cm^2) as per BIS: 1414(API -600).
921Prov. laying jointing and testing at site suitable size copper PVC insulated armoured power three and half core cable conforming to BIS 1554 (Part.I) 1988 or latest upto date ammendments or siemens/Gloster/ ICC/ EICO/National/IEC make from meter of HPSEB to circuit breaker and from circuit breaker to bus bar switch and starter (one cable carrying all three phases) including all other electrical equipment/accessories, such as thimbles, flexble pipe, solder, nuts and bolts, cable glands etc. laid in pipes or trenches under floor. The type, size and make will be subject to approval of HPSEB authorities. In case ofnon acceptance by HPSEB authorities it shall have to be replaced by the tenderer free of cost i/c cost of carriage of material in all leads and lifts and as directed by the Engineer-in-charge.1 Job
922Prov. laying jointing and testing at site suitable size copper PVC insulated armoured power threecore cable conforming to BIS 1554 (Part.I) 1988 or latest upto date ammendments or siemens/Gloster/ ICC/ EICO/ National/ IEC make from meter of HPSEB to circuit breaker and from circuit breaker to bus bar switch and starter (one cable carrying all three phases) including all other electrical equipment/accessories, such as thimbles, flexble pipe, solder, nuts and bolts, cable glands etc. laid in pipes or trenches under floor. The type, size and make will be subject to approval of HPSEB authorities. In case ofnon acceptance by HPSEB authorities it shall have to be replaced by the tenderer free of cost i/c cost of carriage of material in all leads and lifts and as directed by the Engineer-in-charge.1 Job
923Providing and laying double loop earthing with copper plate 600mmx600mmx3mm thick electrode complete with material such as charcoal and commonsalt G.I.Pipes thimbles nuts and bolts,digging of pits, G.I.Wiring and 25x5mm copper strips of required capacity conforming to BIS 3043-1987 latest with upto dateammendments suitable for above motors and other electrical equipmentsi/c cost of carriage of material in all leads and liftsand as directed by the Engineer-in-charge.1 Job
924Supply and errection of floor/wall mounted power factor shunt capacitor conforming to BIS:2834-1986 or latest with upto date ammendments of BHEL/GEC/Machneil/Mager/Bajaj/L&T make to raise the prevailing power factor at site to 0.95 for direct connection to induction motor individually of required KVAR according to HP of motor offered including cable Siemens/Gloster/ICC make from busbar chamber to capacitor & also including L&T/Kilburn/Standard/Siemens/Havells make ICTP switches conforming to BIS:4064-1978 or latest with HRC fuses (Range to be specified by the tenderer) i/c cost of carriage of material in all leads and lifts & as directed by Engineer-in-charge. 1 L.S.
925Supply of 100mm circular dia pressure gauge of suitable range & standard make such as Fiebig/Bourden/ Precision/PREGA with all accessories such as stop cock, copper tubing etc.conformfing to BIS: 3624-1987 or latest with upto date ammendments. 1 Each
926Prov. and fixing double flanged suction, delivery pipe and common header considering site requirement, NPSH required and available & common header having area equal to two times the area of delivery branch of pump including tapers, flanges, rubber gaskets 3mm thick as per BIS:2712-1978 nuts and bolts as per 1264-1983 & special upto 5mtrs. away from the outer wall of pump house as per layout drawings approved by Engneer-in-charge. The pipes shall be capable of with standing minimum 1.5 times the total pressure as indicated in item No.1(a) or total dynamic pressure+ surge pressure whichever is more. The size of suction pipe shall be one or two sizes larger than the suction size of pump such that velocity of flow in suction pipe is not more than 2.50 mtrs./sec. & delivery pipe shall be of size one size larger than nominal delivery size of pump i/c cost of carriage of material in all leads and lifts and as per directed by the Engineer-in-charge. 1 Job
927NOTE:- Actual laying to be done as per final drawings to be approved by the Engineer-in-charge.
928Supply of antivibration pads conforming to BIS 6337-1971 or latest with upto date ammendments of suitable size for above machinery. 1 Each
929Errection of allequipments including cost of tees, bends, tapers and any other fittings required as per site conditions & as per direction of Engineer-in-Charge. 1 Job
930LWSS Cheog Domehar Stage-Ist.
931Supply, erection, testing & commissioning of horizontal spindle,horizontal split casing,radial split Single, /Multistages centrifugal pumpsor combination of pumps, in series/parallel of recommended make such as Mather and Platt/KSB//Becon weir/Kirloskar/ BE/Jyotior any other make approved from IPH Deptt.as per BIS 1520-1980 with upto date ammendments read with BIS 9137-1978 or latest edition to suitable for lifting clear water for under mentioned characteristics with bronze impellers/ priming funnels casing ring and shaft sleaves or bronze. shaft of steel grade-with cast iron casing coupled directly through a flexible coupling on a common C.I./Cast steel base plate (base plate to be from the manufacturers of the pumping unit only) to slip ring/squirrel cage screen protected drip proof induction motor of standard make such as Kirloskar/ Crompton/ Bhel/NGEF/ GEC/Siemen/Jyoti/ABBor any other make approved from IPH Deptt.suitable for operation on 415(+) /-10% volts, 50 cycles/ second, 3 phase AC electric supply. The power of electric motor should be atleast 10% in excess of the maximum power required by the pump in the operation range of (+) 10% and (-)15% of the duty point head. The motor should be as per IS:325-1978with upto date ammendments read with IS:900-1972. It should include cost of bearing nuts, bolts and pointing etc. and should meet the following requirements:-1x60 = 60 HP
932TotalHead:-499.00 mtrs.
933Discharge of each pump set:- 9.15 cum/Hr per set.
934Dia of R/Main:- 65 mm.
935Length of Rising Main ( In metres).:- 1150 mtrs.
936SITE CONDITIONS& WATER CHARACTERSTICS:-
937Location of Site:-
938The altitude of place in which the motor is intended to work in ordinary service (in metres) :- To be filled by the Engineer Incharge.
939Humidity:-Weather generally remains humid during monsoon season.
940Nature of atmosphere:- As normally encountered in Shivalik ange.
941Detail of quality of water:-Potable drinking water.
942Water free from sand or not :-Free.
943Water corosive or not :-Not.
944Turbidity (if any):-To be filled by the Engineer Incharge.
945NPSH available:- To be filled by the Engineer Incharge.
946Any other information or requirement:-
947OPERATING CONDITIONS:-
948Type of current:- AC three/single phase
949Operating frequency:- 50 HZ
950Rated voltage:- 400 (+/-) 10% volts
951System of earthing if any to to be adopted.:-Double loop earthing as per BIS 3043-1987 latest with upto date ammendments.
952No. of working hours per day:- 8 hours
953Speed of revolution in RPM:- To be quoted by tenderer
954Direction of rotation:- To be quoted by tenderer
955The max. Temp. of cooling air & water in the place in which the motor is intented to work in ordinary service:- 35 Degree Centigrade.
956MOTOR:-
957Ref. to BIS code:-BIS 325-1978 read with BIS 900-1992(latest)with upto date ammendments
958Type of enclosure of motor:-SPDP(as per BIS 4691-1985 (latest)
959Type of duty:-Continuous as per IS-12824-1989 or latest with up to date ammendments
960Mechanical out put in KW:-Suitable for driving centrifugal pumps required for duties specified against pumps.To avoid overloading of motor amargin of about 15-20% may be kept in the rated out putof prime mover.
961Class of insulation:- Class ~B~
962Max.permissible temp.rise of motor reqd. if different from given in B(viii) above:-To be filled by the Engineer Incharge.
963Particulars of test reqd. & where they are to be conducted:-As per terms & conditions
964Particulars as to whether voltage limiting device will be employed:-ATS/Star delta starter, oil immersed, fully automatic to be installed between bus bar and motor shunt capacitor is also proposed to be installed for improving the power factor at site.
965(NOTE:- Star delta starter upto 37.5 KW, ATSbetween 37.5 KW to 50 KW and stator rotor starter with slip ring motor beyond 50 KW).
966Motor whether squirrel cage or slipring :-Squirrel cage/slip-ring (Note:- Squirrel cage upto 65 HP and slipring above 65 HP.
967Details of shaft extension reqd.:-Just sufficient to provide direct drive by flexible couplingto pump.
968Typeofslip-ringgearwhether continuously rated or for starting purposes only & whether to befitted with brush lifting or short circuit arrangements or both if interlocks are rquired.:-Continuously rated for Squirrel cage/ Slipring motor
969Breakway torque in terms of rated load torque & the correspondingbreakway starting current which may be taken from the supply withthe starting apparatus in circuit.:- Breakway torque to be given by the tenderer but the starting current should not exceed 2.5 times of the fullload current.
970Nature of load & any information regarding the driven machine whichhas a bearing upon the torque reqd. during the accelerated period, thekinetic energy of the moving partsto be accelrated & No.of startsduring a specified period.:- Sufficient to work the pump offered
971Where possible fault capacity ofthe system to which the motor is connected.:-The motor should be able to withstand initial current of 2.5 times the rated current for two minutes without sufferingdamages or permanent deformations.
972PUMP :-BIS 1520-1980read with BIS 9137-1978 bothwith up to date ammendments
973Nos of pumps reqd.:-1No. pumps .
974Spare parts required:-For 2 years normal maintenance as recommended by manufacturer.
975Optional fittings reqd.:-Air cock for exahausting air from each stage.
976PUMP OPERATING CONDITIONS:-
977TotalHead:-499.00 mtrs.
978Discharge of each pump set:- 9.15 cum/Hr per set.
979If total head is not known then
980following details be provided:-
981i) Static head ( in mtrs)415.00 Mtrs.
982ii) Minimum depth of water( in mtrs)
983iii) Variation in water level( in mtrs)
984iv) Ground level to max. water level ( in mtrs)
985v) Ground level to delivery point ( in mtrs)
986vi) Pressure in the suction tank(in Kg/cm^2 )
987vii) Pressure in the delivery tank (in Kg/cm^2 )
988Length of R/Main(in metres):-1150 mtrs
989Dia of R/Main (in mm):- 65 mm.
990Drive arrangement:-Direct through flexible coupling on acommon base plate
991Drive type:- Electric driven
992NPSH reqd.:-To be quoted by the tenderer
993Limits of total head in which the pump is reqd. to operate.:-(-) 15% to (+) 10% of total head.
994Suction/delivery size of pump:-To be specified by the tenderer
995Efficiency of pump at:- To be specified by the tenderer
996a) duty head
997b) (+)10 % head
998c) (-) 15 % head
999Material of construction:- To be specified by the tenderer (manufacturer"s certficate to be appended)1 Each
1000Supply of suitable direct on line/oil immersed star delta /ATS/Starter rotor starter of standard makesuch as MEI/Kilburn/Jyuoti/ Siemens/ Larson and Turbo conforming to BIS-8544-1979 latest with upto date ammendments for squirrel cage/slip-ring motor (make to be specified by the tenderers) mounted on panel board with magnetic type overload release & dash pot, time lag,under voltage release with initial oil filling.1 Each
1001Note:-Star delta starter upto 37.5 KW,ATS between 37.5 KW to 50 KW and starter rotor starter with slipring motor beyond 50 KW.
1002Providing MS .sheet,16 SWG steel fabricated floor mounted closed(Almirah type) switch board including angle iron post of suitable height and size ISA 40x40x6mm,duly painted, comprising and capable of mounting the following accessories with all internal connections: The drawing of panel board shall be subject to approval of Engineer-in-charge. 1 Job
1003Ammeter AC supply 100mm dia circular dialAuto electrical AE/IMP/Havells make of suitable range for above motorwith selector switchesconforming to BIS:1248(P-II) 1983 with upto date ammendments.1 Each
1004Voltmeter A.C. Supply 100mm dia circular dia Auto electric/AE/IMP/Havells make of suitable range with selector switches as per IS:4064-1978 with upto date ammendments.1 Each
1005ICTP switches with HRC fuses ofKilburn/L&T/Siemens/Standard/Havells make and having Capacity 30% extra of the operational rating as per IS:4064-1978 with upto date ammendments immediately after the power meter of HPSEB. ICTP SWITCHES: I) Type :ii)Make:- iii)CapacityAmp. 1 Set
1006Bus bar chamber having three copper bars of suitable rating for full length equal to the width of the board for three live phases and one copper bar of half the rating of full length for neutral phase as per BIS:8084-1976 and 11353-1985 read with 5578-1985 with upto date ammendments.BUS BAR CHAMBER:-i)Type: - . ii)Make:- iii)Rating1 Set
1007ACB/M.C.B/Oil Circuit Breaker of suitable capacity of Kilburn/ L&T/ MEI/GEC/Standard make on incoming feeder for motor offeredby the tenderer conforming to BIS-2516-1985 latest with upto date ammendments with initial oil filling whenever required and neutral linked under voltage release. 1 Each
1008Three phase Indicating lamps complete with toggle switches for individual motors as per IS 3452(P-I&II) with upto date ammendments. THREE PHASE INDICATOR:- i) Type:-ii) Make:- iii) Capacity.1 Set
1009Earth leakage circuit breaker relay of recommended make such as (Kilburn/L&T/MEI/ GEC) conformingto BIS- 2516-1977 withuptodate ammendment and of suitable range which should have control box operating handle and trip/reset bush button on/off indicators, re-indicating off spring condition of the circuit breaker for over current protection.The circuit should be equipped with magnet thermal release with metallic tape etc. It shouldalso befitted with earth fault for tripping of breaker on occurrence of earth fault on off breaker load side end. ELCB/ELR:- I)Make :-(CEI approved). ii)Type: iii) Range.1 Each
1010Providing Hour run meter of reputed make for four digit capacity conforming to BIS:722(Latest edition)/recommendations. HOUR RUN METER:- I) Type:-ii)Make:- iii)Capacity:- Hrs. 1 Each
1011Suitable three phase voltage monitor relay with all protection and usual indicator and electric siren against single phasing No/ low voltage,high voltage& overloading and phase voltage difference as per IS:3842with upto date ammendments. 1 Each
1012Change over switch of reputed make and suitable capacity1 Each
1013Single phase preventor of reputed make and suitable capacity conforming to IS:1248 (P-V)-1983 with upto date ammendments.1 Each
1014Supplyof Kirloskar/Leader/KSB/fouress/pellicon make of Cast steel double flangedsluice valve having size nominal delivery size of pump and capable of withstanding nominal seat pressure as mentioned in item No.10 (a)& conforming to BIS/API-standards with upto date ammendments for delivery line of pump.1 Each
1015(Note:- The sluice valve shall conform to BIS-780-1984 latest with upto date ammedments. However, if the seat pressure exceeds the limits prescribed in BIS: 780 then the sluice valves shall be of Cast steel conforming to class 150 ASA (Seat pressure 21 kg/cm^2 ) or Class 300- ASA )Seat pressure 52 kg/cm^2) as per BS: 1414(API -600).
1016Supply of Kirloskar/Kilburn/IVC/Fouress/Gled/BHEL/Leader/Bir/Kartar/ Pelocon make of Cast Iron/Cast Steel double flanged swing check type reflux valve for delivery line of pump having bye pass arrangement & sizeone size higher than the normal delivery size of .pump and capable of withstanding nominal seat pressureas mentioned in item No.1 0(a) & comforming toBIS/API standard with upto date ammendments for delivery line of pump.1 Each
1017NOTE:- The reflux valve shall conform to BIS 5312-1984 (part I) latest with up to date ammendments. However if the seat pressure exceeds the limits prescribed in BIS 5312then the reflux valves shall be of cast steel conforming to class 150 ASA (Seat pressure 21 kg/cm^2)or Class 300 ASA (Seat pressure 52 kg/cm^2) as per BIS: 1414(API -600).
1018Supply of Kirloskar/Kilburn/IVC/Fouress/Gled/BHEL/Leader/Bir/Kartar/ Pelocon make of suitable size Cast Steel double flanged swing check type reflux valve having bye pass arrangement & sizeequal to dia of Rising main as mentioned in item No.10 (c) for with standing normal seat pressure as per item No.10(a). 1 Each
1019NOTE:- The reflux valve shall conform to BIS 5312-1984 (part I) latest with up to date ammendments. However if the seat pressure exceeds the limits prescribed in BIS 5312then the reflux valves shall be of cast steel conforming to Class 150 ASA ((Seat pressure 21 kg/cm^2 class 300 ASA (Seat pressure 52 kg/cm^2) as per BS: 1414(API -600).
1020Supply of Kirloskar/Jyoti/ Standard/Kilburn/Bir/ Kartar make cast iron flanged screwed type foot valve ( in case suction lift is involved) for suction pipe having size one or two size larger than suction size of pump such that velocity of flow is not more than 2.50 mtr/sec. with strainerhaving net area of its openings equal to three to four times of X-sectional area of flow in suction pipe conforming to BIS- 4038-1986 or latestwith up to date ammendments including all leads and lifts.1 Each
1021Supply of Kirloskar/Kilburn/IVC/Fouress/Gled/BHEL/Leader/Bir/Kartar/ Pelocon make of Cast Iron double flanged sluice valve ( in case suction is +tive) for suction pipe havingsizeone or two size larger than suction size of pumpsuch that velocity of flow in suction pipe is not more than 2.50 mtrs/ sec. with stainerhet area of its openingequal to three to four timjes of X-sectional area of flow in suction pipe and conforming to BIS/API standards with upto date ammendments i/c all leads and lift and as directed by the Engineer-in-charge. 1 Each
1022NOTE:- The reflux valve shall conform to BIS 5312-1984 (part I) latest with up to date ammendments. However if the seat pressure exceeds the limits prescribed in BIS 5312then the reflux valves shall be of cast steel conforming to class 150 ASA (Seat pressure 21 kg/cm^2)or Class 300 ASA (Seat pressure 52 kg/cm^2) as per BIS: 1414(API -600).
1023Prov. laying jointing and testing at site suitable size copper PVC insulated armoured power three and half core cable conforming to BIS 1554 (Part.I) 1988 or latest upto date ammendments or siemens/Gloster/ ICC/ EICO/National/IEC make from meter of HPSEB to circuit breaker and from circuit breaker to bus bar switch and starter (one cable carrying all three phases) including all other electrical equipment/accessories, such as thimbles, flexble pipe, solder, nuts and bolts, cable glands etc. laid in pipes or trenches under floor. The type, size and make will be subject to approval of HPSEB authorities. In case ofnon acceptance by HPSEB authorities it shall have to be replaced by the tenderer free of cost i/c cost of carriage of material in all leads and lifts and as directed by the Engineer-in-charge.1 Job
1024Prov. laying jointing and testing at site suitable size copper PVC insulated armoured power threecore cable conforming to BIS 1554 (Part.I) 1988 or latest upto date ammendments or siemens/Gloster/ ICC/ EICO/ National/ IEC make from meter of HPSEB to circuit breaker and from circuit breaker to bus bar switch and starter (one cable carrying all three phases) including all other electrical equipment/ accessories, such as thimbles, flexble pipe, solder, nuts and bolts, cable glands etc. laid in pipes or trenches under floor. The type, size and make will be subject to approval of HPSEB authorities. In case ofnon acceptance by HPSEB authorities it shall have to be replaced by the tenderer free of cost i/c cost of carriage of material in all leads and lifts and as directed by the Engineer-in-charge. 1 Job
1025Providing and laying double loop earthing with copper plate 600mmx600mmx3mm thick electrode complete with material such as charcoal and commonsalt G.I.Pipes thimbles nuts and bolts,digging of pits, G.I.Wiring and 25x5mm copper strips of required capacity conforming to BIS 3043-1987 latest with upto dateammendments suitable for above motors and other electrical equipmentsi/c cost of carriage of material in all leads and liftsand as directed by the Engineer-in-charge. 1 Job
1026Supply and errection of floor/wall mounted power factor shunt capacitor conforming to BIS:2834-1986 or latest with upto date ammendments of BHEL/GEC/Machneil/Mager/Bajaj/L&T make to raise the prevailing power factor at site to 0.95 for direct connection to induction motor individually of required KVAR according to HP of motor offered including cable Siemens/Gloster/ICC make from busbar chamber to capacitor & also including L&T/Kilburn/Standard/Siemens/Havells make ICTP switches conforming to BIS:4064-1978 or latest with HRC fuses (Range to be specified by the tenderer) i/c cost of carriage of material in all leads and lifts & as directed by Engineer-in-charge.1 L. S.
1027Supply of 100mm circular dia pressure gauge of suitable range & standard make such as Fiebig/Bourden/ Precision/PREGA with all accessories such as stop cock, copper tubing etc.conformfing to BIS: 3624-1987 or latest with upto date ammendments. 1 Each
1028Prov. and fixing double flanged suction, delivery pipe and common header considering site requirement, NPSH required and available & common header having area equal to two times the area of delivery branch of pump including tapers, flanges, rubber gaskets 3mm thick as per BIS:2712-1978 nuts and bolts as per 1264-1983 & special upto 5mtrs. away from the outer wall of pump house as per layout drawings approved by Engneer-in-charge. The pipes shall be capable of with standing minimum 1.5 times the total pressure as indicated in item No.1(a) or total dynamic pressure+ surge pressure whichever is more. The size of suction pipe shall be one or two sizes larger than the suction size of pump such that velocity of flow in suction pipe is not more than 2.50 mtrs./sec. & delivery pipe shall be of size one size larger than nominal delivery size of pump i/c cost of carriage of material in all leads and lifts and as per directed by the Engineer-in-charge.1 Job
1029NOTE:- Actual laying to be done as per final drawings to be approved by the Engineer-in-charge.
1030Supply of antivibration pads conforming to BIS 6337-1971 or latest with upto date ammendments of suitable size for above machinery.1 Each
1031Errection of all equipment including cost of tees, bands, tapers and any other fittings required as per site conditions & as per direction of Engineer-in-Charge.1 Job
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail