Estimate For Children Park At Cha Sundari Project Block A1 P/No 11/52 S No Xvi Under Jaigaon -I G.P , Pwd(Wb),Building Works,Page-1/315,Item-2(B) Earth Work In Excavation Of Foundation Trenches Or Drains In All Sorts Of Soil (Including Mixed Soil But Excluding Laterite Or Sandstone) Including Removing,Spreading Or Stacking The Spoils Within A Lead Of 75M.As Directed. The Item Includes Necessary Trimming The Sides Of Trenches, Levelling, Dressing And Ramming The Bottom, Bailing Out Water As Required Complete. Depth Of Excavation Additional Depth Beyond 1500 Mm.And Upto 3000 Mm. But Not Requiring Shoring. In Footpath In Swing Post In Slide , Pwd(Wb),Building Works,Page-14/315,Item-01 Single Brick Flat Soling Of Picked Jhama Bricks Including Ramming Andin Swing Post In Slide In Footpath Below Benches , Pwd(Wb),Building Works,Page-24/315,Item-4(B)Ordinary Cement Concrete M-15 (Mix 4:2:1) With Graded Stone Chips (20Mm Down) Excluding Shuttring And Reinforcement, If Any, In Ground Floor As Per Is-456-2000. River Bazree In Swing Post In Slide In Footpath Below Benches , Pwd(Wb),Building Works,Page-1/315,Item-3(A) Earth Work In Filling In Foundation Trenches Or Plinth With Good Earthin Layers Not Exceeding 150 Mm. Including Watering And Ramming Etc.Layerby Layer Complete .(Payment To Be Made On The Basis Of Measurement Of Finished Quantity Of Work) (A) With Earth Obtained From Excavationof Foundation 30% Of Total Excavation2.13/30% , Pwd(Wb),Building Works,Page-43/315,Item-36(A) Hire And Labour Charge For Shuttering With Centreing And Necessary Staging Upto 4 M. Using Approved Stout Props And Thick Hard Wood Planks Of Approved Thickness With Required Bracing For Concrete Slabs, Columns, Lintels Curved Or Staight Including Fitting Fixing And Striking Out After Complection Of Works. (Upto Roof Of Ground Floor)25 Mm. To 30 Mm. Thick Wooden Shuttering As Per In Swing Post4 2.44 0.75 In Slide 2 3.04 0.91 In Footpath 1 47.58 0.08 Below Benches 4 6.00 0.15 , Pwd(Wb),Building Works,Page-74/315,Item-47 Supplying& Laying 20 Mm Designer Chequered Tiles Of Any Shade And Of Approved Quality As Per Is: 1237: 1980 Laid In Patterns As Directed In Pavement, Footpath Including Necessary Underlay 25 Mm Thick Average Cement Mortar (1:3) Complete In All Respect With All Labour And Materials [Using Cement Slurry @ 4.4 Kg/Sq.M At Back Side Of Tiles. Cement Of Mortar & Slurry Will Be Supplied By The Department. Border Concrete If Necessary To Be Paid Separately]. In Footpath 1 47.58 1.20 Below Benches 4 1.00 2.00 Sub Total Add 15 % Extra For Wastage Of Sub Total 14.23 Sq.M Total , Non-Scheduled Items:- Supplyingand Placing Of Grass Turfing Onentire Compound With Some Beautification Plants 1 4.00 Total , Supplying, Fitting, Fixingfibred Slides 1 2.00 Total , Supplying, Fitting, Fixingswings 1 2.00 Total , Add 1% Labour Cess , Add 12% Gst , Add Contigency 1.5% , Add Display Board