Housing Urban and Rular Development Local Bodies Closing in 0 days TDR #36893277

Tender For Providing New 10000 Ltr Over Head Tank, Bore Well, Motor And Pipe Line At Konampatti - 9 - Stage 2. Providing New Bore Well, Motor & Pipe Line To The Existing 1000 Ltr Oht At Konampatti3. Providing New 10000 Ltr Over Head Tank, Bore Well, Moto

Issued by Local Bodies · harur, Tamil Nadu
Tender Value
20 Lakhs
Estimated cost
Bid Submission
03 Apr 2023
0 days left
EMD
20000
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
harur → Tamil Nadu
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Providing New 10000 Ltr Over Head Tank, Bore Well, Motor And Pipe Line At Konampatti - 9 - Stage 2. Providing New Bore Well, Motor & Pipe Line To The Existing 1000 Ltr Oht At Konampatti3. Providing New 10000 Ltr Over Head Tank, Bore Well, Motor And Pipe Line At Old Konampatti - 9 - Stage

BOQ

Name of Work: TN04-03-16 / Harur Block /Agraharam / PMAGY - 2021-20221. Providing New 10000 Ltr Over Head Tank, Bore Well, Motor and Pipe Line at Konampatti - 9 - Stage 2. Providing New Bore Well, Motor & Pipe Line to the Existing 1000 Ltr OHT at Konampatti3. Providing New 10000 Ltr Over Head Tank, Bore Well, Motor and Pipe Line at Old Konampatti - 9 - Stage
Sl. No. Item Description
1Providing New 10000 Ltr Over Head Tank, Bore Well, Motor and Pipe Line at Konampatti - 9 - Stage
2Earth work excavation below G.L. and depositing on bank within an initial lead of 10 m and an initial lift of 2 m for the following classification of soil. In hard stiff clay, stiff black cotton soil, hard red earth, sales, murrams, gravel, stoney earth, earth mixed with small sized boulders and hard gravelly soil S.S. 20B
3For Column (0.00-0.30m)
4In soft disintegrated rock, laterite, soft rock or kankar not requiring blasting
5Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete. below 1.50 m from GL. - FOR FOOTING
6Earth work excavation below G.L. and depositing on bank within an initial lead of 10 m and an initial lift of 2 m for the following classification of soil. In hard stiff clay, stiff black cotton soil, hard red earth, sales, murrams, gravel, stoney earth, earth mixed with small sized boulders and hard gravelly soil S.S. 20B
7Column footing below 1.50 m from GL
8Coloumn below GL upto 1.50 m
9Column above GL upto 4.50 m
10Column above 4.50 m upto 7.32 m
11Column above 7.32 m upto 10.98 m
12Braces at GL
13Braces at 2.60 m from GL
14Braces at 6.00 m from GL
15Floor beam at 9.0m from G.L. Floor slab from 9.00m to 10.98m above G.L. Side wall from 9.15 m to 10.98 m above GL Haunch from 9.15 m to 10.98 m above G.L.
16Side wall from 10.98 m to 14.64 m above GL / Roof slab at 11.60 m above G.L.
17Earth work excavation below G.L. and depositing on bank within an initial lead of 10 m and an initial lift of 2 m for the following classification of soil. In hard stiff clay, stiff black cotton soil, hard red earth, sales, murrams, gravel, stoney earth, earth mixed with small sized boulders and hard gravelly soil S.S. 20B
18Column footing (plane surface)
19Square Column:
20Colum above 3.3m to 4.3 ht from GL
21Column above 4.30 m upto 5.30 m
22Column above 5.30 m upto 6.30 m
23Column above 6.30 m upto 7.30 m
24Column above 7.30 m upto 8.30 m
25Column above 8.30 m upto 9.30 m
26Plain Surface
27Brace at Ground Level
28Brace at 2.60 m above Ground Level
29Brace at 6.00 m above Ground Level
30Floor beam sides from 8.75 m to 9.30 m above GL - Inside
31Floor slab and working platform at 9.00 m above G.L..
32Roof slab at0- 3.30 m above floor slab
33Floor slab upto 3.30 m above plateform, Inner, Ohter Face, Platform
34Supply, fabrication, placing in position of steel rods cutting tying etc. complete including cost of reinforcement RTS rods.
35Exterior Emulsion Painting two coats overNew Cement Plastered surface usingExterior Emulsion Paint including with Priming one coat cost and conveyance of paint and all labour charges etc complete.
36Supplying and fixing of cutstone in C M 1:3 below inlet pipe
37Supply and Fixing of GI pipes for OHT connections including civil works
38Supply,delivery and fixing in position of MS ladder outside the Service reservoir
39Supplying and fixing of CI manhole cover with frame of size 0.60m X 0.60m
40Supplying andfixing of 100 mm dia AC Cowl for ventilators on the roof slab
41Providing RCC ladder inside the tank
42Providing Inline Cholorination
43Construction of Platform arrangements including all charges etc., complete
44Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering where ever necessary and laidin layers not more than 15.c.m. thick compacting etc. complete complying with standard specification.
45Brik work in CM 1:5 mix using good country bricks including cost and conveyance of all materials to site and all labour charge etc., complete
46Plastering with cment 1:5-12mm thic including cost and conveyance of all materials to site and all labour charges etc., complete.
47Provision for Soak pitarrangements
48Drilling of 150mm dia Borewell in Hard rock area
49Geophysical survey charges
50Over Burden soil for Insertion of Casing Pipe
51Upto 150Mbelow Ground Level
52165mm O/D PVC Casing pipe
53Supply, delivery & erection of Three phase Submersible pumpset
54Supply and delivery of Three phaseSubmersible Pumpset (As per IS 8034) including all tax charges.Pumpset : 5.00 HP,Duty : 50 Lpm x 175 m
55Three phase panel board with two level guard and auto starter including tax charges.
56Supply and delivery of followingUPVC pipes and specials conforming to IS 694/1990 for UPVC Pipes IS 1239/1990 part I required for pumpset erection.
574.00 sq.mm flat copper Submersible cable
5850mm UPVC Pipe
5940mm GI pipe
6040mmGI Elbow
6140mm GI Union
6240mm MS Clamp set
6340mm GM Non Return Valve
6420 mm PVC Pipe for Cable encasing including earth work, laying, refilling charges.
6520 mm PVC Elbow
6663 mm FTA/MTA
677/20 copper wire for Service Connection (SD 65)
6825mm GI pipe for Service connection
69Transport charges for All materials at the site.
70Labour charges for erection, testing and commissioning of the submersible pumpsets in the bore well including fixing and jointing the submersible cable with proper clamps up to the starter to the required depth using erection of clamps,valves,Panel Board
71Supply, delivery and erection of EB meter board with supply and fixing of 16 amps fuse unit 1 No. copper neutral link, indicator lamp with switch holder bulb and single phase main switch etc. complete.
72Supply,delivery, laying , jointing and testing of PVC/GI pipes specials including earthwork excavation refilling etc. 30 Mtr
73Earth work excavation and deposting on bank with in inintial lead of 10m and initial left of 2mts in hard stiff clay, stiff black cotton soil, hard rd earth earth mixied with small size boulders and hard gravely soil as per
74Supply of HDPE pipes inclding cost and conveyance of all materials to site and all labour charges etc., complete.
75Labour charges for laying and jointing HDPE pipes including all lbaourcharges for laying pipes in proper alingement and gradient including cost of solvent cement etc., complete.
76Refilling with excavated earth after laying of pipes including all labour chargessolvent cement etc., complete
77Construction of Sealing Arrangements
78Earth work excavation and depositing on bank with initial lead of 10m and lift of 2.00m in Hard stiff clay, Stiff Black Cotton soil, Hard red earth, Shaless, Murrams and earth mixed with small size boulders etc. as per SS 20B.
79Plain Cement Concrete 1:4:8 (one cement four sand and eight aggregate) using 40mm HBS for foundation including the cost of mixing concrete, ramming, curing etc., complete.
80Plain Cement Concrete 1:2:4 (one cement two sand and four aggregate) using 40mm HBS for foundation including the cost of mixing concrete, ramming, curing etc., complete.
81Supplying and erecting Steel centering for sides and soffits including necessary supports and shuttering to the required height for RCC items using MS sheets or suitable sizse of BG.10 stiffened with welded MS angles etc. complete.
82M.S.Cover plate for borewell
83Provision for 20HBG Stones for Embeding
84Provision for Name board
85Providing New Bore Well, Motor & Pipe Line to the Existing 10000 Ltr OHT at Konampatti
86Drilling of 150mm dia Borewell in Hard rock area
87Geophysical survey charges
88Over Burden soil for Insertion of Casing Pipe
89Upto 150Mbelow Ground Level
90From 151 upto 180m
91165mm O/D PVC Casing pipe
92Supply, delivery & erection of Three phase Submersible pumpset
93Supply and delivery of Three phaseSubmersible Pumpset (As per IS 8034) including all tax charges.Pumpset : 5.00 HP,Duty : 50 Lpm x 175 m
94Three phase panel board with two level guard and auto starter including tax charges.
95Supply and delivery of followingUPVC pipes and specials conforming to IS 694/1990 for UPVC Pipes IS 1239/1990 part I required for pumpset erection.
964.00 sq.mm flat copper Submersible cable
9750mm UPVC Pipe
9840mm GI pipe
9940mmGI Elbow
10040mm GI Union
10140mm MS Clamp set
10240mm GM Non Return Valve
10320 mm PVC Pipe for Cable encasing including earth work, laying, refilling charges.
10420 mm PVC Elbow
10563 mm FTA/MTA
1067/20 copper wire for Service Connection (SD 65)
10725mm GI pipe for Service connection
108Transport charges for All materials at the site.
109Labour charges for erection, testing and commissioning of the submersible pumpsets in the bore well including fixing and jointing the submersible cable with proper clamps up to the starter to the required depth using erection of clamps,valves,Panel Board
110Supply, delivery and erection of EB meter board with supply and fixing of 16 amps fuse unit 1 No. copper neutral link, indicator lamp with switch holder bulb and single phase main switch etc. complete.
111Supply,delivery, laying , jointing and testing of PVC/GI pipes specials including earthwork excavation refilling etc. 30 Mtr
112Earth work excavation and deposting on bank with in inintial lead of 10m and initial left of 2mts in hard stiff clay, stiff black cotton soil, hard rd earth earth mixied with small size boulders and hard gravely soil as per
113Supply of HDPE pipes inclding cost and conveyance of all materials to site and all labour charges etc., complete.
114Labour charges for laying and jointing HDPE pipes including all lbaourcharges for laying pipes in proper alingement and gradient including cost of solvent cement etc., complete.
115Refilling with excavated earth after laying of pipes including all labour chargessolvent cement etc., complete
116Construction of Masonry Pedestal for housing the Panel boardof size : 1.2 x 0.60X 0.75m (For OHT)
117Earth work excavation and depositing on bank with initial lead of 10m and lift of 2.00m in Hard stiff clay, Stiff Black Cotton soil, Hard red earth, Shaless, Murrams and earth mixed with small size boulders etc. as per SS 20B.
118Plain Cement concrete 1:4:8 mix using 40mm ISS metal including all cost and conveyance of all materials to site and all labour charges etc complete.
119Brick work CM 1:5 mix using good country bricks including cost and conveyance of all materials to site and all labour charges etc complete.
120Plastering with cement 1:5-12mm thick includingcost and conveyance of al materials to site and all labour charges etc complete.
121Supply and errection Centering for sides and soofits including necessary supports and struttings including cost and conveyance and all labour charges etc., complete
122Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works etc., complete
123Reinforced cement concrete 1:1.5:3 mix using 20mmISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc., complete.
124Suuply and fixing of Steel Door of sizes 1.20mm x 0.75mm in MS angle 40mm x 40m x 6mm, MS flat 25mm x 25mm x 6mm with MS sheet of 18 guage including ventilating arrangements using 20mm square MS rods with locking arrangements labour charges for cutting, welding, grinding, locking arrangements including locking arrangemts including two coats of approved enamel painting over one coats of priming etc., complete.
125Painting two coats with approved Exterior Emulsion over one coat of priming over the cement plastered exposed surface of the Pedestal including cleaning, preparing the surface and curing etc.
126Painting two coats over new iron works using ready mixed enamel paint including cost and conveyance of paint and all labour charges etc complete
127Construction of Sealing Arrangements
128Earth work excavation and depositing on bank with initial lead of 10m and lift of 2.00m in Hard stiff clay, Stiff Black Cotton soil, Hard red earth, Shaless, Murrams and earth mixed with small size boulders etc. as per SS 20B.
129Plain Cement Concrete 1:4:8 (one cement four sand and eight aggregate) using 40mm HBS for foundation including the cost of mixing concrete, ramming, curing etc., complete.
130Plain Cement Concrete 1:2:4 (one cement two sand and four aggregate) using 40mm HBS for foundation including the cost of mixing concrete, ramming, curing etc., complete.
131Supplying and erecting Steel centering for sides and soffits including necessary supports and shuttering to the required height for RCC items using MS sheets or suitable sizse of BG.10 stiffened with welded MS angles etc. complete.
132M.S.Cover plate for borewell
133Provision for 20HBG Stones for Embeding
134Provision for Name board
135Providing New 10000 Ltr Over Head Tank, Bore Well, Motor and Pipe Line at Old Konampatti - 9 - Stage
136Earth work excavation below G.L. and depositing on bank within an initial lead of 10 m and an initial lift of 2 m for the following classification of soil. In hard stiff clay, stiff black cotton soil, hard red earth, sales, murrams, gravel, stoney earth, earth mixed with small sized boulders and hard gravelly soil S.S. 20B
137For Column (0.00-0.30m)
138In soft disintegrated rock, laterite, soft rock or kankar not requiring blasting
139Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete. below 1.50 m from GL. - FOR FOOTING
140Earth work excavation below G.L. and depositing on bank within an initial lead of 10 m and an initial lift of 2 m for the following classification of soil. In hard stiff clay, stiff black cotton soil, hard red earth, sales, murrams, gravel, stoney earth, earth mixed with small sized boulders and hard gravelly soil S.S. 20B
141Column footing below 1.50 m from GL
142Coloumn below GL upto 1.50 m
143Column above GL upto 4.50 m
144Column above 4.50 m upto 7.32 m
145Column above 7.32 m upto 10.98 m
146Braces at GL
147Braces at 2.60 m from GL
148Braces at 6.00 m from GL
149Floor beam at 9.0m from G.L. Floor slab from 9.00m to 10.98m above G.L. Side wall from 9.15 m to 10.98 m above GL Haunch from 9.15 m to 10.98 m above G.L.
150Side wall from 10.98 m to 14.64 m above GL / Roof slab at 11.60 m above G.L.
151Earth work excavation below G.L. and depositing on bank within an initial lead of 10 m and an initial lift of 2 m for the following classification of soil. In hard stiff clay, stiff black cotton soil, hard red earth, sales, murrams, gravel, stoney earth, earth mixed with small sized boulders and hard gravelly soil S.S. 20B
152Column footing (plane surface)
153Square Column:
154Colum above 3.3m to 4.3 ht from GL
155Column above 4.30 m upto 5.30 m
156Column above 5.30 m upto 6.30 m
157Column above 6.30 m upto 7.30 m
158Column above 7.30 m upto 8.30 m
159Column above 8.30 m upto 9.30 m
160Plain Surface
161Brace at Ground Level
162Brace at 2.60 m above Ground Level
163Brace at 6.00 m above Ground Level
164Floor beam sides from 8.75 m to 9.30 m above GL - Inside
165Floor slab and working platform at 9.00 m above G.L..
166Roof slab at0- 3.30 m above floor slab
167Floor slab upto 3.30 m above plateform, Inner, Ohter Face, Platform
168Supply, fabrication, placing in position of steel rods cutting tying etc. complete including cost of reinforcement RTS rods.
169Exterior Emulsion Painting two coats overNew Cement Plastered surface usingExterior Emulsion Paint including with Priming one coat cost and conveyance of paint and all labour charges etc complete.
170Supplying and fixing of cutstone in C M 1:3 below inlet pipe
171Supply and Fixing of GI pipes for OHT connections including civil works
172Supply,delivery and fixing in position of MS ladder outside the Service reservoir
173Supplying and fixing of CI manhole cover with frame of size 0.60m X 0.60m
174Supplying andfixing of 100 mm dia AC Cowl for ventilators on the roof slab
175Providing RCC ladder inside the tank
176Providing Inline Cholorination
177Construction of Platform arrangements including all charges etc., complete
178Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering where ever necessary and laidin layers not more than 15.c.m. thick compacting etc. complete complying with standard specification.
179Brik work in CM 1:5 mix using good country bricks including cost and conveyance of all materials to site and all labour charge etc., complete
180Plastering with cment 1:5-12mm thic including cost and conveyance of all materials to site and all labour charges etc., complete.
181Provision for Soak pitarrangements
182Drilling of 150mm dia Borewell in Hard rock area
183Geophysical survey charges
184Over Burden soil for Insertion of Casing Pipe
185Upto 150Mbelow Ground Level
186165mm O/D PVC Casing pipe
187Supply, delivery & erection of Three phase Submersible pumpset
188Supply and delivery of Three phaseSubmersible Pumpset (As per IS 8034) including all tax charges.Pumpset : 5.00 HP,Duty : 50 Lpm x 175 m
189Three phase panel board with two level guard and auto starter including tax charges.
190Supply and delivery of followingUPVC pipes and specials conforming to IS 694/1990 for UPVC Pipes IS 1239/1990 part I required for pumpset erection.
1914.00 sq.mm flat copper Submersible cable
19250mm UPVC Pipe
19340mm GI pipe
19440mmGI Elbow
19540mm GI Union
19640mm MS Clamp set
19740mm GM Non Return Valve
19820 mm PVC Pipe for Cable encasing including earth work, laying, refilling charges.
19920 mm PVC Elbow
20063 mm FTA/MTA
2017/20 copper wire for Service Connection (SD 65)
20225mm GI pipe for Service connection
203Transport charges for All materials at the site.
204Labour charges for erection, testing and commissioning of the submersible pumpsets in the bore well including fixing and jointing the submersible cable with proper clamps up to the starter to the required depth using erection of clamps,valves,Panel Board
205Supply, delivery and erection of EB meter board with supply and fixing of 16 amps fuse unit 1 No. copper neutral link, indicator lamp with switch holder bulb and single phase main switch etc. complete.
206Supply,delivery, laying , jointing and testing of PVC/GI pipes specials including earthwork excavation refilling etc. 30 Mtr
207Earth work excavation and deposting on bank with in inintial lead of 10m and initial left of 2mts in hard stiff clay, stiff black cotton soil, hard rd earth earth mixied with small size boulders and hard gravely soil as per
208Supply of HDPE pipes inclding cost and conveyance of all materials to site and all labour charges etc., complete.
209Labour charges for laying and jointing HDPE pipes including all lbaourcharges for laying pipes in proper alingement and gradient including cost of solvent cement etc., complete.
210Refilling with excavated earth after laying of pipes including all labour chargessolvent cement etc., complete
211Construction of Sealing Arrangements
212Earth work excavation and depositing on bank with initial lead of 10m and lift of 2.00m in Hard stiff clay, Stiff Black Cotton soil, Hard red earth, Shaless, Murrams and earth mixed with small size boulders etc. as per SS 20B.
213Plain Cement Concrete 1:4:8 (one cement four sand and eight aggregate) using 40mm HBS for foundation including the cost of mixing concrete, ramming, curing etc., complete.
214Plain Cement Concrete 1:2:4 (one cement two sand and four aggregate) using 40mm HBS for foundation including the cost of mixing concrete, ramming, curing etc., complete.
215Supplying and erecting Steel centering for sides and soffits including necessary supports and shuttering to the required height for RCC items using MS sheets or suitable sizse of BG.10 stiffened with welded MS angles etc. complete.
216M.S.Cover plate for borewell
217Provision for 20HBG Stones for Embeding
218Provision for Name board
219GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package}

AI Tender Summary

OUR REF NO 36893277
AUTHORITY Local Bodies
TENDER VALUE 20 Lakhs
LAST DATE 03-04-2023
Authority
Authority Name Rural Development And Panchayats Department
Work Description Providing New 10000 Ltr Over Head Tank, Bore Well, Motor And Pipe Line At Konampatti - 9 - Stage 2. Providing New Bore Well, Motor & Pipe Line To The Existing 1000 Ltr Oht At Konampatti3. Providing New 10000 Ltr Over Head Tank, Bore Well, Motor And Pipe Line At Old Konampatti - 9 - Stage
Basic Detail
Tender No Roc.No.903/2023/A3 Dt.20.03.2023 P16
Bidding Type Tender
Location
City harur
State Tamil Nadu
Key Dates
Publish Date 20 Mar 2023
Submission Date 03 Apr 2023
Open Date 03 Apr 2023
Finance
Tender Value 20 Lakhs
Tender Fee Ref. Documents
EMD 20000
Exemption Not Available
Document List
cb5258af-3a30-46b2-b419-9d57891384c3.html
BOQ_351513.xls
Tendedocument.pdf
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Mar 20, 2023
11:30 IST

Tender Published

Tender notice published.

Completed
Apr 03, 2023
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Apr 03, 2023

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

cb5258af-3a30-46b2-b419-9d57891384c3.html

xls

BOQ_351513.xls

pdf

Tendedocument.pdf

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders