Appointment Of Master System Integrator ( Msi ) For Supply, Implementation, Integration, Operations And Maintenance Of Smart City Ict Components At Integrated Industrial Township ( Iit ) , Greater Noida
Tender Overview
Project Description
Appointment Of Master System Integrator ( Msi ) For Supply, Implementation, Integration, Operations And Maintenance Of Smart City Ict Components At Integrated Industrial Township ( Iit ) , Greater Noida
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 03-Apr-2023 | CORRIGENDUM | Technical Bid | 18-Apr-2023 |
| 2 | 19-Apr-2023 | DATEEXTENSION | Date | 25-Apr-2023 |
| 3 | 26-Apr-2023 | DATE EXTENSION | Date | 02-May-2023 |
BOQ
| Sl. No. | Item Description |
| 1 | Fibre Optic Infrastructure |
| 2 | HDPE Duct 1x40mm for Backbone, Distribution and device connectivity |
| 3 | Trenching (Hand Trench and Micro Trench) (Quantity as per Bidder\"s Solution) |
| 4 | 48 Count Fibre Optic Cable (FOC) |
| 5 | 24 Count Fibre Optic Cable (FOC) |
| 6 | 6 Count Fibre Optic Cable (FOC) |
| 7 | Manholes with accessories and core cutting (As per finalized design in DPR) (As per Bidder’s Solution) |
| 8 | Handholes with accessories and core cutting (As per finalized design in DPR) (As per Bidder’s Solution) |
| 9 | UTP Copper Cable and Patch Cords (As per Bidder’s Solution) |
| 10 | Copper Patch Panels (As per Bidder’s Solution) |
| 11 | Fibre Optic Splice Closure (FOSC) (As per Bidder’s Solution) |
| 12 | Optical Connectors (As per Bidder’s Solution) |
| 13 | Fibre Patch Cords (As per Bidder’s Solution) |
| 14 | Fibre Distribution Management System (FDMS) |
| 15 | 48 Count Fibre Termination Panel (FTP) (As per Bidder’s Solution) |
| 16 | 24 Count Fibre Termination Panel (FTP) (As per Bidder’s Solution) |
| 17 | 6 Count Fibre Termination Panel (FTP) (As per Bidder’s Solution) |
| 18 | Fibre Optic Patch Panel |
| 19 | Type I: Industrial Grade Field Switch |
| 20 | Distribution Switch |
| 21 | Core Switch |
| 22 | Core Router |
| 23 | Server/Workstation Connectivity Ethernet Switch |
| 24 | Network Management System (NMS) and Enterprise Management System (EMS) |
| 25 | Mini POP Room (including all civil, interiors, electrical, mechanical, structural, communications, fire, furniture and fitouts) - 200 Sq. Ft. |
| 26 | Rodent Repellent System |
| 27 | Any other Hardware or Software required to meet the RFQ cum RFP requirements |
| 28 | City Surveillance Cameras |
| 29 | CCTV – Fixed |
| 30 | CCTV – PTZ |
| 31 | Video Management System (VMS) including Central Application |
| 32 | Variable Message Display (VMD) including software and mounting structures |
| 33 | Poles for Field Devices |
| 34 | Any other Hardware or Software required to meet the RFQ cum RFP requirements |
| 35 | IIT Software Modules (ISM) |
| 36 | GIS |
| 37 | Customer Relationship Management (CRM) |
| 38 | Portal |
| 39 | Water Utility Management and Billing |
| 40 | Citizen Grievances Redressal |
| 41 | e-Mail Solution and Instant Messenger with Online Storage for DMIC IITGNL |
| 42 | Dashboards |
| 43 | Mobile Applications (All Platform) |
| 44 | SOA based integration framework for Applications |
| 45 | Any other Hardware or Software required to meet the RFQ cum RFP requirements |
| 46 | Environmental Sensors |
| 47 | Environmental Sensors - Hardware and Software |
| 48 | Any other Hardware or Software required to meet the RFQ cum RFP requirements |
| 49 | IT and Other Common Infrastructure |
| 50 | Data Security: Firewall with Anti-Virus |
| 51 | Operator Workstations |
| 52 | Communication Cabinets with 42U Racks |
| 53 | Outdoor Enclosure/ Field Cabinets |
| 54 | Servers |
| 55 | UPS Inside Mini POP & at site Control Centre |
| 56 | UPS Inside CCC |
| 57 | UPS for Field Devices |
| 58 | Cloud Service Provider |
| 59 | On-Premise Storage |
| 60 | Third Party Testing, Inspection and Audit |
| 61 | Any other Hardware or Software required to meet the RFQ cum RFP requirements |
| 62 | Command and Control Center (CCC) |
| 63 | 4 x 70” Video Wall Cubes with Controller |
| 64 | LCD Display (70”) (Including 200Sqft Fitouts) |
| 65 | Operator Console |
| 66 | Multi-Functional Printer including Scanner |
| 67 | Smart City Platform |
| 68 | Command & Control Centre Civil works including interiors, electrical, mechanical, communications, fire, fitouts, furniture etc. (Approx. 500 Sqft) |
| 69 | Integration with Third Party Systems |
| 70 | Telecom Connectivity (2 links) |
| 71 | SMS, e-Mail, WhatsApp gateway |
| 72 | Any other Hardware or Software required to meet the RFQ cum RFP requirements |
| 73 | Miscellaneous Cost |
| 74 | Content Writer - 1 Personnel (Commitment required over the duration of the Contract) |
| 75 | Recurrent Cost (O&M) |
| 76 | Total cost for 1st Year |
| 77 | Total cost for 2nd Year |
| 78 | Total cost for 3rd Year |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-2 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-3 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender