| 1 | Earth work in excavation of foundation trenches or drains in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing,spreading or stacking the spoils within a lead of 75m.as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete.B. Depth of excavation not exceeding 1500 mm |
| 2 | Single brick flat soling of Picked Jhama Bricks including ramming and dressing the bed to Proper level and filling joints with powderes earth or local sand. |
| 3 | Cement concrete with 30 mm down graded shingles excluding shuttering. In ground floor. In ground floor with N.B Varietya). 6:3:1 proportion. |
| 4 | Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work) (a) With earth obtained from excavation of foundation.1/5 Th in filling in foundation and rest for levelling compound |
| 5 | Ordinary cement concrete (mix 1:1.5:3) with graded stone chips (20mm nominal size) excluding shuttring and reinforcement, if any, in ground floor as per relevant IS codes.(b) River bazree |
| 6 | Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc. initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every inter-section, complete as per drawing and direction.(a) For works in foundation, basement and upto roof of ground floor/upto 4m.Tor steel/Mild steel(Other than TATA) |
| 7 | Hire and labour charge for shuttering with centreing and necessary staging upto 4 m. using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or staight including fitting, fixing and striking out after complection of works. (upto roof of ground floor)(a) 25 mm. to 30 mm. thick wooden shuttering as per decision & direction of Engineer-in-charge. (A) In Foundation and Plinth |
| 8 | (B) In Superstructure |
| 9 | 125 mm. thick brick work with 1st class bricks in cement mortar (1:4) in ground floor. Wall |
| 10 | Plaster ( to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering conrners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (ground floor). (Excluding cost of chipping over concrete surface)With 1:4 cement mortar. 10 mm. thick plaster |
| 11 | 15 mm. thick plaster |
| 12 | M.S or W.I ornamental grill of approved design joints continuously welded with M.S , W.I Flats and bars of windows , railingetc fitted and fixed with necessary screws and lugs in ground floor . (ii) Grill weighing above 16 Kg/Sq.mtr and above. |
| 13 | (I) For hanging and locking arrangements including supply of materials and labour complete.(15% extra over the corresponding item of grill ) |
| 14 | Neat cement punning about 1.5 mm. thick in wall, dado, window, sills, floor, drain etc. |
| 15 | Priming one coat on Steel or other Metal surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc. |
| 16 | Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sandparpering etc. in cluding using of approved putty etc. on the surface , if necessary. (b) On Steel or other Metal surface:With super gloss (hi-gloss) (iv) Two coats (with any shade except white). |
| 17 | Applying decorative cement base praint of approved quility after preparing the surface including scraping the same thoroughly (plastered or concrete surface) as per manufacturer\"s specification(i) In Ground floor(b) Two coats |
| 18 | with carried earth arranged by the contractor within a radius of 3km |
| 19 | GST 18% |
| 20 | CESS 1 |