Tender For Procurement Of Furnace Flame Viewing Camera For Sgtpp Under Capex 2022-23
Tender Overview
Project Description
Procurement Of Furnace Flame Viewing Camera For Sgtpp Under Capex 2022-23 Supply, Installation And Commissioning Of Furnace Flame Viewing Camera For Sgtpp Unit 1 To 4 Under Capex 2022-23 , Supply, Installation And Commissioning Of Furnace Flame Viewing Camera For Sgtpp Unit 1 To 4 Under Capex 2022-23 , Furnace Flame Viewing Camera For Furnace ( A) Furnace Camera System: 2 No B) Retract System: 2 No C) Air Filter System: 2 No D) Video Connector For Camera: 2 No E) Port_Shutter: 2 No F) Control Cabinet With Accessories And Hoses: 2 No G) 19 Led Monitor: 1 No H) Fiber Optics Cable,Sm,4F: 600 Mtr. I) Ethernet To Fiber Optic Converter (Liu, Pigtail, Patch Cord & Media Converter With Power Supply): 2 No J) Ethernet Cable: 50 Mtr. K) Nvr With Recording Facility 1 Tb Hdd : 2 No L) Wall Mounting Box And Multiplexing Unit In Ccr: 1 No M) Power Cable (3Cx1.5 Sq Mm), Armoured: 300 Mtr. N) 25 Mm Perforated Cable Tray: 75 Mtr. O) 1/2 Gi Pipe: 30 Mtr.) , Mandatory Spare For Furnace Camera ( A) Furnace Camera System: 1 No B) Retract System: 1 No C) Air Filter System: 2 No D) Video Connector For Camera: 2 No E) Port_Shutter: 2 No F) Control Cabinet With Accessories And Hoses: 1 No G) 19 Led Monitor: 1 No H) Ethernet To Fiber Optic Converter (Liu,Pigtail, Patchc Cord & Media Converter With Power Supply): 2 No I) Nvr With Recording Facility 1 Tb Hdd : 1 No J) Wall Mounting Box And Multiplexing Unit In Ccr: 1 No K) Vortex Cooler: 2 No L) Digital Temperature Controller: 2 No M) Thermocouple: 4 No N) Front Sensor: 2 No ) , Erection ,Installation And Testing
BOQ
| Sl. No. | Item Description |
| 1 | SUPPLY, INSTALLATION AND COMMISSIONING OF FURNACE FLAME VIEWING CAMERA FOR SGTPP UNIT 1 TO 4 UNDER CAPEX 2022-23 |
| 2 | FURNACE FLAME VIEWING CAMERA FOR FURNACE ( a) Furnace camera system: 2 NO b) Retract system: 2 NO c) Air Filter system: 2 NO d) Video connector for Camera: 2 NO e) PORT_SHUTTER: 2 NO f) Control Cabinet with accessories and hoses: 2 NO g) 19\" LED monitor: 1 NO h) Fiber optics cable,SM,4F: 600 Mtr. i) Ethernet to Fiber optic converter (LIU, Pigtail, Patch cord & Media converter with power supply): 2 NO j) Ethernet cable: 50 Mtr. k) NVR with recording facility 1 TB HDD : 2 NO l) Wall mounting box and Multiplexing unit in CCR: 1 NO m) Power cable (3Cx1.5 sq mm), Armoured: 300 Mtr. n) 25 mm perforated cable tray: 75 Mtr. o) 1/2\" GI pipe: 30 Mtr.) |
| 3 | MANDATORY SPARE FOR FURNACE CAMERA ( a) Furnace camera system: 1 NO b) Retract system: 1 NO c) Air Filter system: 2 NO d) Video connector for Camera: 2 NO e) PORT_SHUTTER: 2 NO f) Control Cabinet with accessories and hoses: 1 NO g) 19\" LED monitor: 1 NO h) Ethernet to Fiber optic converter (LIU,Pigtail, Patchc cord & Media converter with power supply): 2 NO i) NVR with recording facility 1 TB HDD : 1 NO j) Wall mounting box and Multiplexing unit in CCR: 1 NO k) Vortex Cooler: 2 NO l) Digital temperature controller: 2 NO m) Thermocouple: 4 NO n) Front sensor: 2 NO ) |
| 4 | ERECTION ,INSTALLATION AND TESTING |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender