Uttarakhand Power Corporation Limited-UPCL has published Tender For Replacement Of Existing 11Kv Acsr Weasal Conductor To Aaac Covered Conductor 70 Sqmm For 11Kv Kedarnath Feeder From Sonprayag To Rambada Under 33/11Kv S/S Sonprayag Under Edd, Rudraprayag On Semi-Turnkey Basisrudraprayag On Semi-Turnkey Basis. Submission Date for this Tender is 25-03-2023. Feeder Pillar Tenders in rudraprayag Uttarakhand. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 24-Mar-2023 | Due Date Extended - Due to some issues in accessing portals, all the tenders due for closing on 24-Mar-2023 have been extended by 24 hours as per System Malfunction Procedure. Inconvenience caused is deeply regretted. | Admin Corrigendum Date Extend | 25-03-2023 |
Sl. No. | Item Description |
1 | SUPPLY OF MATERIAL PORTION |
2 | 11 KV AAAC70 Sq mm covered conductor {As per EN. 50397(2006)} Aconductor shall be strended round non-compacted and water tight 2006 The standred conductor shall be longitudinally water blocked by the mean of water blocking material The semi-conductring screen inner insulation and outer insulation should be extrucded in one step The outer covering insulation shall ber UV-Stablized tracking resistance black XLPE |
3 | MVCC Accessories (As per EN - 50397-2) as below: |
4 | 11 KV tension with ball and IPC |
5 | 33 KV cable ties for Pin insulator |
6 | 11 KV IPC for covered to covered connection |
7 | 11 KV IPC for covered to bare conductor |
8 | 11 KV Mid span jointing kit |
9 | IPC with Aluminium bail for earthing |
10 | PP & clamp sp-23 with N&B |
11 | STAY SET 16*1800 MM |
12 | STAY WIRE 7/10 SWG |
13 | LABOUR PORTION |
14 | Cartage of material from central store Srinagar to road side including loading and unloding dist 0-80km |
15 | ST pole SP 23 (galvanised hot dip) |
16 | Small Material |
17 | Head load cartage of following material from road side to work side dist. Approx 03 km loading/unloading complete |
18 | ST pole SP 23 (galvanised hot dip) |
19 | Small Material |
20 | Removing of old conductor with opening of existing jumpering and making of bundle with carriage from pit to JE Store including loading/unloading complete |
21 | laying spreading stringing sagging of 11kv line in 3 phase of the following wire as phase wire including proper sagging with binding and jumoering as per user mannual and sagging complete work |
22 | 11 kv grade conductor covered conductor AAAC with 70 sq mm. |
23 | Excavation of earth and erection of 11 kv single support with cc COMP |
24 | Fixing , tightening and Nozzeling of StayWith pole and Stay rod on required Tension as per per drawing |
25 | Digging Pit of Stay Set 0.6x0.6x1.2 Mtr in All Type of Soil |
26 | Grouting of Stay in Size 0.6x0.6x0.3x444=13.716 Cub mtr in CC ratio (cement sand & Stone ballast Back Fiiling of Soil and boulder in pit |
27 | Fabrication citting and drilling of steel |
28 | Fixing of MVCC Accessories |
29 | 11 KV tension with ball and IPC |
30 | 33 KV cable ties for Pin insulator |
31 | 11 KV IPC for covered to covered connection |
32 | 11 KV IPC for covered to bare conductor |
33 | 11 KV Mid span jointing kit |
34 | Chemical Earthing on pole structure (Existing/New) |
35 | PP & clamp sp-23 with N&B |