Tender For Litch Pit And Silt Pit Under Grey Water Management Project At Fakna Mouza Under Naxalbari Gram Panchayat
Tender Value
2.76 Lakhs
Estimated cost
Bid Submission
24 Mar 2023
0 days left
EMD
5534
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
naxalbari → West Bengal
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender For Litch Pit And Silt Pit Under Grey Water Management Project At Fakna Mouza Under Naxalbari Gram Panchayat
BOQ
| Sl. No. | Item Description |
| 1 | It. No. 2(a) / Page. No. 1 of 315 ( Building Schedule ):- Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete.(a) Depth of excavation not exceeding 1,500 mm. |
| 2 | It. No. 2(a) / Page. No. 1 of 315 ( Building Schedule ):- Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete.(b) Depth of excavation for additional depth beyond 1,500 mm. and upto 3,000 mm. but not requiring shoring |
| 3 | Item No:- 02 [ Page: 14, It No. 01]Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand.( PWD-W.B. Building Schedule Rate wef 01.11.2017 And as per 3rd Corrigenda & Addenda,Dated-04.06.2018) |
| 4 | It. No. 10(ii)// Page No. 24 of 315 ( Building Schedule ) :- Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes |
| 5 | Item No:- 04 [ Page: 15, It No. 7(a)Brick work with 1st class bricks in cement mortar (1:4)(a) In foundation and plinth.( PWD-W.B. Building Schedule Rate wef 01.11.2017 And as per 3rd Corrigenda & Addenda,Dated-04.06.2018) |
| 6 | It. No. 10(ii)// Page No. 26 of 315 ( Building Schedule ) :- Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes. |
| 7 | Item no:- 06 page 43,44Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders drawing and direction. III. Other than Manufacturar not specified. In Ground floor: (PWD-W.B. Building Schedule Rate wef 01.11.2017 And as per 10th Corrigenda & Addenda,Dated-22.01.2020 Rate analysis enclosed) |
| 8 | Item No.36(f), Page No: 42 of 315 (As per Building schedule):- Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) (f) 25 mm to 30 mm shuttering without staging in foundation. |
| 9 | Item No:- 08 [ Page: 02, It No. 04] (A) Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity) .(PWD-W.B. Building Schedule Rate wef 01.11.2017 |
| 10 | Item No:- 09[ Page: 212/213, It No. 21(A-ii)]Supplying, fitting & fixing UPVC pipes A- Type and fittings conforming to IS:13592-1992 with all necessary clamps, nails, including making holes in walls, floor etc. cutting trenches in any soil through masonry concrete structuresetc if necessary and mending good damages including joining with jointing materails (Spun Yarn, Valamoid/Bitumen/M-Seal etc) complete. (ii) 110 mm. Dia |
| 11 | Item No:- 10[ Page: 212/213, It No. 21(B-ii)]B) UPVC Fittings: a) Plain Tee (ii) 110 mm. Dia |
| 12 | Item No:- 11[ Page: 212/213, It No. 21(C-ii)] c) Bend 87.5 degree(ii) 110 mm. Dia |
| 13 | Item No:- 12Supply of Stone Shingles & Course Sand.1st Layer |
| 14 | Item No:- 12Supply of Stone Shingles & Course Sand,2nd Layer |
| 15 | Item No:- 12Supply of Stone Shingles & Course Sand,3rd Layer |
| 16 | Item No:- 12Supply of Stone Shingles & Course Sand, Course sand |
| 17 | GST 18% for Litch pit |
| 18 | Cess for Litch pit |
| 19 | It. No. 2(a) / Page. No. 1 of 315 ( Building Schedule ):- Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete.(a) Depth of excavation not exceeding 1,500 mm. |
| 20 | Item No:- 02 [ Page: 14, It No. 01]Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand.( PWD-W.B. Building Schedule Rate wef 01.11.2017 And as per 3rd Corrigenda & Addenda,Dated-04.06.2018) |
| 21 | It. No. 10(ii)// Page No. 24 of 315 ( Building Schedule ) :- Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes |
| 22 | Item No:- 04 [ Page: 15, It No. 7(a)Brick work with 1st class bricks in cement mortar (1:4)(a) In foundation and plinth.( PWD-W.B. Building Schedule Rate wef 01.11.2017 And as per 3rd Corrigenda & Addenda,Dated-04.06.2018) |
| 23 | It. No. 10(ii)// Page No. 26 of 315 ( Building Schedule ) :- Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes. |
| 24 | Item no:- 06 page 43,44Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders drawing and direction. III. Other than Manufacturar not specified. In Ground floor: (PWD-W.B. Building Schedule Rate wef 01.11.2017 And as per 10th Corrigenda & Addenda,Dated-22.01.2020 Rate analysis enclosed) |
| 25 | Item No.36(f), Page No: 42 of 315 (As per Building schedule):- Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) (f) 25 mm to 30 mm shuttering without staging in foundation. |
| 26 | Item No:- 08 [ Page: 73]Li) Nahani Trap 90mm |
| 27 | GST 18% for silt chamber |
| 28 | Cess for silt chamber |
AI Tender Summary
Tender Timeline
Mar 18, 2023
11:30 IST
Tender Published
Tender notice published.
CompletedMar 24, 2023
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedMar 27, 2023
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender