Kerala State Chalachitra Academy has published Tender For The Works At The Proposed Storage Area At Cifra. Submission Date for this Tender is 25-03-2023. Civil Work Tenders in Thiruvananthapuram Kerala. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 21-Mar-2023 | Fee | Fee | 25-03-2023 |
Sl. No. | Item Description |
1 | CONFERENCE HALL |
2 | Providing and laying vitrified floor tiles in different sizes (thickness to be specified by the manufacturer) |
3 | with water absorption less than 0.08% and conforming to IS : 15622, of approved make, in all colours and |
4 | shades, laid on 20 mm thick cement mortar 1:4(1 cement : 4 coarse sand), including epoxi grouting the joints |
5 | with epoxiand matching pigments etc., complete.Size of Tile 600 x 600 mm. |
6 | floor |
7 | closeing out side window by using 18mm thick multy wood pley wood with necessery arrigements and painting work including the cost of all materiels and labour chargesetc complete |
8 | window |
9 | providing and fixing of power coatedaluminium windows by using two track frames and 4mm thick plain glass and necessery locking arrigements including the cost of all materiels and labour charges etc complete |
10 | window |
11 | providing and fixing of verticle blints(woolen cloth) including the cost of all materiels and laboue chargesetc complete |
12 | window |
13 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure |
14 | above plinth level up to floor V level in all shapes and sizes in:Cement mortar 1:4 ( 1 cement : 4 coarse sand) including the cost of all materiels and labour charges etc complete |
15 | wall |
16 | parapet hole |
17 | 12 mm cement plaster of mix:1:4 ( 1 cement : 4 coarse sand) including the cost of all materiels and labour charges etc complete |
18 | wall |
19 | parapet hole |
20 | Applying one coat of water thinnable cement primer of approved brand and manufacture on wall |
21 | surface:Water thinnable cement primer including the cost of all materiels and labour charges etc complete |
22 | wall |
23 | parapet hole |
24 | hall |
25 | deductions-door |
26 | window |
27 | Wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade:Two |
28 | or more coats on new work including the cost of all materiels and labour charges etc complete |
29 | wall |
30 | parapet hole |
31 | hall |
32 | deductions-door |
33 | window |
34 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and |
35 | manufacturer, over the plastered wall surface to prepare the surface even and smooth complete including the cost of all materiels and labour charges etc complete |
36 | wall |
37 | parapet hole |
38 | hall |
39 | deductions-door |
40 | window |
41 | Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed |
42 | and fixed in position with hold fast lugs or with dash fasteners of required dia & length ( hold fast lugs or |
43 | dash fastener shall be paid for separately) using good quality teakwood including the cost of all materiels and labour charges etc complete |
44 | door-100*210 |
45 | Providing and fixing panelled or panelled and glazed shutters for doors, windows and clerestory windows, |
46 | 35 mm thick shutters including ISI marked M.S. pressed butt hinges bright finished of required sized with |
47 | necessary screws, excluding panelling which will be paid for separately, all complete as per direction of |
48 | Engineer in-charge using teak wood including the cost of all materiels and labour charges etc complete |
49 | door-100*210 |
50 | Providing and fixing paneling or paneling and glazing in paneled or paneled and glazed shutters for |
51 | doors, windows and clerestory windows (Area of opening for panel inserts excluding portion inside |
52 | grooves or rebates to be measured). Paneling for paneled or paneled and glazed shutters 25 mm to 40 |
53 | mm thick using good quality teakwood including the cost of all materiels and labour charges etc complete |
54 | door-100*210 |
55 | Providing 40x5 mm flat iron hold fast 40 cm long including fixing to frame with 10 mm diameter bolts, nuts |
56 | and wooden plugs and embeddings in cement concrete block 30x10x15 cm 1:3:6 mix ( 1 cement : 3 |
57 | coarse sand : 6 graded stone aggregate 20 mm nominal size) including the cost of all materiels and labour charges etc complete |
58 | door-100*210 |
59 | Providing and fixing ISI markedbrass Tower bolt of size 200mm*10mm with necessary screws ,including the cost of all materiels and labour charges etc complete |
60 | door-100*210 |
61 | Providing and fixing bright finished brass handles with screws including the cost of all materiels and labour chargesetc. complete:125 mm |
62 | door-100*210 |
63 | Providing and fixing chromium plated brass 100 mm mortice latch and lock with 6 levers and a pair of |
64 | lever handles of approved quality with necessary screws including the cost of all materiels and labour charges etc. complete. |
65 | door-100*210 |
66 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an |
67 | even shade:Two or more coats on new work over an under coat of suitable shade with ordinary paint of |
68 | approved brand and manufacture .or polishing the door including the cost of all materiels and labour charges etc complete |
69 | door-100*210 |
70 | providing and fixing of cubicles partitions by using g I tubes 40mm*40mm*2.5mm and 18mm thick multy wood ply wood including all necessery fittings ,painting,and locking arrigements etc including cost of all materiles and labourcharges etc complete |
71 | partition |
72 | providing and fixing of filmspool storage rackof size( 8feet*8feet ) with g I square pipe 40mm*40mm*2.5mmof frameand necessery arrigements , and painting work including the cost of all materiels and labour chargesetc complete |
73 | film spool storage rack |
74 | LOBBY |
75 | Providing and laying vitrified floor tiles in different sizes (thickness to be specified by the manufacturer) |
76 | with water absorption less than 0.08% and conforming to IS : 15622, of approved make, in all colours and |
77 | shades, laid on 20 mm thick cement mortar 1:4(1 cement : 4 coarse sand), including epoxi grouting the joints |
78 | with eopxi and matching pigments etc., complete.Size of Tile 600 x 600 mm.including the cost of all materiels and labour charges etc complete |
79 | floor |
80 | providing and fixing of cubicles partitions by using g I tubes 40mm*40mm*2.5mm and 18mm thick multy wood ply wood including all necessery fittings and locking arrigements etc including cost of all materiles and labourcharges etc complete |
81 | partition |
82 | providing and fixing of power coated aluminium windows by using two track frames and 4mm thick plain glass and necessery locking arrigements including cost of all materiels and labour chargesetc complete |
83 | window |
84 | providing and fixing ofpower coatedaluminium sliding door including locking arrigements and fixing of hydralic door closer ,including thecost of all materiels and labour charges etc complete |
85 | door |
86 | providing and fixing of power coated aluminiumwindows(movable) and 4mm thick plain glass and necessery locking arrigements including cost of all materiels and labour chargesetc complete |
87 | window |
88 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure |
89 | above plinth level up to floor V level in all shapes and sizes in:Cement mortar 1:4 ( 1 cement : 4 coarse sand)including the cost of all materiels and labour charges etc complete |
90 | wall lift |
91 | deductions door |
92 | 12 mm cement plaster of mix:1:4 ( 1 cement : 4 coarse sand) including the cost of all materiels and labour charges etc complete |
93 | wall lift |
94 | deductions door |
95 | Applying one coat of water thinnable cement primer of approved brand and manufacture on wall |
96 | surface:Water thinnable cement primer including the cost of all materiels and laboue charges etc complete |
97 | wall lift |
98 | lobby |
99 | deductions door |
100 | Wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade:Two |
101 | or more coats on new work including the cost of all materiels and labour charges etc complete |
102 | wall lift |
103 | lobby |
104 | deductions door |
105 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and |
106 | manufacturer, over the plastered wall surface to prepare the surface even and smooth including the cost of all materiels and labour charges etc complete complete |
107 | wall lift |
108 | lobby |
109 | deductions door |
110 | Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15* landings, |
111 | balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor |
112 | five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : |
113 | 1.5 coarse sand (Zone III) : 3 graded stone aggregate 20 mm nominal size).including the cost of all materiels and labour charges etc complete |
114 | for lift beam |
115 | slab |
116 | Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, |
117 | girders bressumers and cantilevers |
118 | for lift beam |
119 | Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, |
120 | landings, balconies and access platform |
121 | slab |
122 | Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and |
123 | binding all complete above plinth level.Thermo - Mechanically Treated bars of grade Fe-500D or more including the cost of all materiels and labour charges etc complete |
124 | concrete 0.86m3*120kg/m3 |
125 | 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including the cost of all materiels and labour charges etc complete |
126 | slab |
127 | Distempering with oil bound washable distemper of approved brand and manufacture to give an even |
128 | shade:New work ( Two or more coats) over and including priming coat with water thinnable cement primer including the cost of all materiels and labour charges etc complete |
129 | slab |
130 | STORE |
131 | Providing and laying vitrified floor tiles in different sizes (thickness to be specified by the manufacturer) |
132 | with water absorption less than 0.08% and conforming to IS : 15622, of approved make, in all colours and |
133 | shades, laid on 20 mm thick cement mortar 1:4(1 cement : 4 coarse sand), including epoxi grouting the joints |
134 | with epoxi and matching pigments etc., complete.Size of Tile 600 x 600 mm.including the cost of all materiels and labour charges etc complete |
135 | floor |
136 | providing and fixing ofpartitions by using g I tubes 40mm*40mm*2.5mm and 8mm v boardincluding all necessery fittings and locking arrigements ,painting worketc including cost of all materiles and labourcharges etc complete |
137 | partition |
138 | providing and fixing of power coatedaluminium sliding door including locking arrigements and fixing of hydralic door closer ,including thecost of all materiels and labour charges etc complete |
139 | door |
140 | providing and fixing of bookstorage rackof size( 8feet*8feet ) with g I square pipe 40mm*40mm*2.5mmof frameand 18mm thick multy wood ply wood includingnecessery arrigements , and painting work including the cost of all materiels and labour charges etc complete |
141 | bookstorage rack |
142 | providing and fixing of 150mm pvc gutter including cost of all materiels and labour charges ete complete |
143 | gutter |
144 | OUT SIDE TERRESE |
145 | providing and fixing of handrails by using of g I tubes for duct in open terrese including painting and including cost of all materiels and labour charges etc complete |
146 | open terrese |
147 | TOILETS |
148 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure |
149 | above plinth level up to floor V level in all shapes and sizes in:Cement mortar 1:4 ( 1 cement : 4 coarse sand) including the cost of all materiels and labour charges etc complete |
150 | wall |
151 | deductions door |
152 | 12 mm cement plaster of mix:1:4 ( 1 cement : 4 coarse sand) including the cost of all materiels and labour charges etc complete |
153 | wall |
154 | deductions door |
155 | Applying one coat of water thinnable cement primer of approved brand and manufacture on wall |
156 | surface:Water thinnable cement primer including the cost of all materiels and labour charges etc complete |
157 | wall |
158 | deductions door |
159 | Wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade:Two |
160 | or more coats on new work including the cost of all materiels and labour charges etc complete |
161 | wall |
162 | deductions door |
163 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and |
164 | manufacturer, over the plastered wall surface to prepare the surface even and smooth including the cost of all materiels and labour charges etc complete |
165 | wall |
166 | deductions door |
167 | Supplying and fixing PVC doors wth 3 nos stainless steel hnges 2 nos tower bolt and 2 nos |
168 | handle,screws,joining cleats and gum etc complete including the cost of all materiels and labour charges etc complete as |
169 | per specificaton and direction by the Engneer-in-charge |
170 | door-80*210 |
171 | Providing and fixing Ist quality ceramic glazed wall tiles conforming to IS: 15622(thickness to be specified |
172 | by the manufacturer), of approved make, in all colours,shades except burgundy, bottle green, black of |
173 | any size as approved by Engineerin-Charge,in skirting, risers of steps and dados, over 12 mm thick bed |
174 | of cementmortar 1:3 (1 cement : 3 coarse sand) and jointing with grey cement slurry @3.3kg per sqm, |
175 | including pointing with epoxi groutting mixed with pigment of matchingshade complete. |
176 | toilets |
177 | deductions |
178 | Providing and laying Ceramic glazed floor tiles of size 300x300 mm (thickness to be specified by the |
179 | manufacturer), of 1st quality conforming to IS : 15622, of approved make, in colours such as White, Ivory, |
180 | Grey, Fume Red Brown, laid on 20 mm thick cement mortar 1:4 (1 Cement : 4 Coarse sand), including |
181 | pointing the joints with epoxi groutting and matching pigment etc., complete.including the cost of all materiels and labour charges etc complete |
182 | toilet |
183 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and |
184 | shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 20mm nominal size including the cost of all materiels and labour charges etc complete |
185 | bath rooms |
186 | Providing and fixing white vitreous china pedestal type water closet (European type W.C. pan) with seat |
187 | and lid, 10 litre low level white P.V.C. flushing cistern, including flush pipe, with manually controlled |
188 | device (handle lever), conforming to IS : 7231, with all fittings and fixtures complete, including cutting and |
189 | making good the walls and floors wherever required:W.C. pan with ISI marked white |
190 | solid plastic seat and lid including the cost of all materiels and labour charges etc complete |
191 | toilet |
192 | Providing and fixing wash basin with C.I. brackets, 15 mm C.P. brass pillar taps, 32 mm C.P. brass waste |
193 | of standard pattern, including painting of fittings and brackets, cutting and making good the walls |
194 | wherever require:White Vitreous China Flat back wash basin size 450x300 mm with single 15 mm C.P.brass piller tap |
195 | Cera or Equivalent including the cost of all materiels and labour charges etc complete |
196 | toilet |
197 | Providing and fixing mirror of superior glass ( of approved quality) and |
198 | of required shape and size with plastic moulded frame of approved make and |
199 | shade with 6 mm thick hard board backing :Rectangular shape 453x357 mm including the cost of all materiels and labour charges etc complete |
200 | toilet |
201 | Supplying and fixing 15mm CP health faucet and angle valve good quality |
202 | including the cost of materials and labour charges etc. as per the |
203 | direction of site engineer -in-charge |
204 | toilet |
205 | Providing and fixing of floor traps (4"") to toilet floors and making good |
206 | the concrete floor as per direction of engineer in charge including the cost of all materiels and labour charges etc complete |
207 | toilet |
208 | Providing and fixing PVC pipes, fittings including fixing the pipe with clamps at |
209 | 1.00 m spacing. This includes jointing of pipes & fittings with one step |
210 | pvc solvent cement and testing of joints complete as per direction of |
211 | engineer in Charge. Concealed work, including cutting chases and making good the wall etc. 25mmpipe 10kgf/cm2 including the cost of all materiels and labour charges etc complete |
212 | toilet |
213 | Providing and fixing PTMT towel rail complete with brackets fixed to wooden |
214 | cleats with CP brass screws with concealed fitting arrangement of |
215 | approved quality and colour450 mm long towel rail with total length of 495 mm, 78mm |
216 | wide and effective height of 88 mm. weighing not less than 170 gms including the cost of all materiels and labour charges etc complete |
217 | toilet |
218 | Providing and fixing C.P. brass long body bib cock of approved quality |
219 | conforming to IS standards and weighing not less than 690 gms.15 mm |
220 | nominal bore including the cost of all materiels and labour charges etc complete |
221 | toilet |
222 | Providing and fixing PVC pipes including fixing the pipe with clamps/ clips/ at |
223 | 1.00 m spacing . This includes jointing of pipes with one step PVC solvent |
224 | cement and testing of joints complete as per direction of Engineer-in- |
225 | charge 110 mm dia 6 Kgf/cm2 - External work- Exposed on wall including the cost of all materiels and labour charges etc complte |
226 | toilet |
227 | Providing and fixing PVC pipes, fittings including fixing the pipe with clamps at |
228 | 1.00 m spacing. This includes jointing of pipes with one step PVC solvent |
229 | cement and testing of joints complete as per direction of Engineer-in- |
230 | chargeConcealed work, including cutting chases and making good the wall etc. 75 mm pipe 6kgf/cm2 including the cost of all materiels and labour charges etc complete |
231 | toilet |
232 | Providing and fixing PVC pipes, fittings including fixing the pipe with clamps at |
233 | 1.00 m spacing. This includes jointing of pipes with one step PVC solvent |
234 | cement and testing of joints complete as per direction of Engineer-in- |
235 | charge in exposed on walls 75 mm pipe 6kgf/cm2 including the cost of all materiels and labour charges etc complete |
236 | toilet |
237 | Providing and fixing PVC pipes, fittings including fixing the pipe with clamps at |
238 | 1.00 m spacing. This includes jointing of pipes with one step PVC solvent |
239 | cement and testing of joints complete as per direction of Engineer-in- |
240 | chargeConcealed work, including cutting chases and making good the wall etc. 110 mm pipe 6kgf/cm2 including the cost of all materiels and labour charges etc complete |
241 | toilet |
242 | Providing and fixing ball valve (brass) of approved quality, High or low pressure, with plastic floats |
243 | complete:25 mm nominal bore including the cost of all materiels and labour charges etc complete |
244 | toilet |
245 | Providing and fixing PVC pipes, fittings including fixing the pipe with clamps at 1.00 m spacing. This |
246 | includes jointing of pipes & fittings with one step PVC solvent cement and testing of joints complete as |
247 | per direction of Engineer-in-Charge. concealed work, including cutting chases and making good the wall |
248 | etc. 40 mm pipe 10 kgf/ cm2 including the cost of all materiels and labour charges etc complete |
249 | toilet |
250 | Providing and fixing PVC pipes, fittings including fixing the pipe with clamps at |
251 | 1.00 m spacing. This includes jointing of pipes & fittings with one step |
252 | pvc solvent cement and testing of joints complete as per direction of |
253 | engineer in Charge. Exposed onwall etc. 25mmpipe 10kgf/cm2 including the cost of all materiels and labour charges etc complete |
254 | toilet |
255 | Providing and fixing brass angle valve of approved quality :15 mm nominal bore including the cost of all materiels and labour charges etc complete |
256 | toilet |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail