| 1 | A1. Project Management Cost Including all Taxes and Duties |
| 2 | Installation and commissioning of all RTU and its associated component |
| 3 | Integration with legacy applications and existing RTDAS & Data Migration, Please refer Attachement-13 for detail of existing RTDAS system. |
| 4 | Training for the Employees, Please refer Form-6 of section-V |
| 5 | B1. RTUs |
| 6 | RTU, base equipment comprising panels,racks, sub-racks, Power Supply modules, CPU,interfacing equipment, required converters & all other required items/accessories including complete wiring for all modules |
| 7 | Multi Function Transducers (MFT) |
| 8 | Contact Multiplying Relay (CMR) |
| 9 | 4G/5G Modem |
| 10 | Single TFT PC for LDMS with 1 KVA UPS with minimum 4 hr backup and 01 nos Table and 01 nos chair. Please refer Attachment-17 for table and chair specification. |
| 11 | Any other hardware to meet functional /performance requirement ofMTS |
| 12 | Any other hardware to meet functional /performance requirement ofMTS |
| 13 | Any other hardware to meet functional /performance requirement ofMTS |
| 14 | 5% of Serial No. 2 (2.1 to 2.8) for mandatory spares. |
| 15 | B2. Test Equipment |
| 16 | RTU Database Configuration & Maintenance Software tool |
| 17 | Master Station cum RTU Simulator & Protocol analyser software tool |
| 18 | Laptop PC for above software tools along withinterfacing hardware including Hub |
| 19 | B3. Software for LDMS |
| 20 | LDMS Software |
| 21 | C1. Auxiliary Power Supply |
| 22 | DC Power Supply (DCPS) system based on SMPS with Battery bank (VRLA Type) for minimum 4 hours of backup |
| 23 | 5% of Serial No. 5 (5.1)for mandatory spares. |
| 24 | D1. Communication System |
| 25 | 4G/5G Connectivity charges with Control Center by GPRS SIM for 05 years from date of Operational Acceptance. |
| 26 | Network connectivity charges for 20Mbps aggregation MPLS link at control center of 05 years |
| 27 | E1. FMS |
| 28 | FMS Charges of Installed RTUs and connected equipments for Five (05) years ( Filled amount should be equivalent to Total FMS charges filled in BoQ2 sheet) |