}

Tender For Fire Water Pipeline Re-Routing And Pipe Dismantling Works At Cpcl-Cbr, Nagapattinam, Tamilnadu, nagapattinam-Tamil Nadu

Chennai Petroleum Corporation Limited-CPCL has published Tender For Fire Water Pipeline Re-Routing And Pipe Dismantling Works At Cpcl-Cbr, Nagapattinam, Tamilnadu. Submission Date for this Tender is 30-03-2023. Rough Finishing Tools Tenders in nagapattinam Tamil Nadu. Bidders can get complete Tender details and download the document.




Tender Notice

36817846
Corrigendum : Tender For Fire Water Pipeline Re-Routing And Pipe Dismantling Works At Cpcl-Cbr, Nagapattinam, Tamilnadu
Limitted
Indian
Tamil Nadu
nagapattinam
30-03-2023

Tender Details

Fire Water Pipeline Re-Routing And Pipe Dismantling Works At Cpcl-Cbr, Nagapattinam, Tamilnadu , Carbon Steel Piping Work - Underground , The Job Includes Transporation Of All Free Issue Materials From Owners Storage Point To Work Site, Handling At Site, Cutting, Bevelling, Fabrication, Laying, Welding & Erection Of Carbon Steel Piping Including Sleeve Pipes Below Ground Level, Trenches At All Depths, Stand Posts, Anchoring Of All Underground Pipelines For Conection With Equipments & Nozzles. , The Piping Job Includes All Modification And Replacement Jobs Involving Pipes & All Types Of Fittings Like Elbows / Tees / Reducers / Half Coupling / Full Coupling, Etc., All Types Of Flanges Like Slip On / Raised Face, Etc., Valves, Steam Traps, Orifice Assemblies, Strainers, Vents, Drains, Funnels, Etc., Of Different Schedules, Pressure Ratings And For Various Temperature Applications , The Piping Job Includes Fabrication & Erection Of Pipe Sleeves, Providing Shoe Supports, Pads At Support Locations, Reinforcement Pads, Etc., Wherever Required. , The Job Includes Flushing, Preparing Work Area For Executing Hot Work, Bending To Suit The Contours Wherever Required, Socket, Fillet, Butt Welding Using E 6010 / E 6013 / E 7018 Electrodes As Required, Post Weld Heat Treatment ( Pwht - Stress Relieving ) After Welding Wherever Required, Hydraulic / Pneumatic Test Twice ( On Completion Of Fabrication & On Completion Of Laying At Site ) As Per Codes, Specification, Drawings And Draining Of Water & Drying With Compressor Air After Hydrotest. , The Job Also Includes Supplying Of All Types Of Tools & Tackles, Lifting Arrangements Like Chain Pulley Blocks, Machineries, All Consumables And Labour To Complete The Job In All Respects, Returning Back The Unused Materials To Owners Storage Point And Dumping The Generated Scrap Material To Designated Area As Per Eic Instructions. , The Rates For The Following Items Shall Be Exclusive Of Concrete / Pcc Breaking, Earth Work Removal, Blinding & Deblinding, Radiography, Stress Relieving, Reinforcement Pad Welding, Wrapping & Coating, Earth Back Filling, Removal Of Old Piping For Replacement And Erection & Removal Of Scaffolding , The Rates For The Following Items Shall Be Inclusive Of Fabrication, Laying, Erection, Welding, Flushing Of The Piping System, Offering Stagewise Inspection, Hydrotesting And Draining / Drying Of The Piping System. , With Cpcl Supply Of Free Power & Contractors Welding Machine , Butt Welding - Above 8.8 Mm And Upto 12.7 Mmpiping Thickness , Carbon Steel - Underground Piping -Butt Welding Joint - Above 8.8 Mm Upto 12.7 Mm Piping Thickness - With Hydro / Pneumatic Testing , Sleeve Pipe - Butt Welding , Carbon Steel - Sleeve Pipe - Butt Welding Joint - Above 8.8 Mm And Upto 12.7 Mm Thickness - With Hydrotest , Carbon Steel Piping Work - Above Ground , The Job Includes Transporation Of All Free Issue Materials From Owners Storage Point To Work Site, Handling At Site, Cutting, Bevelling, Fabrication, Laying, Welding & Erection Of Carbon Steel Piping At All Locations Above Ground Level, Overhead, Over Sleepers, Piperacks, Crossovers, Pipe Sleeves, Trenches, Stand Posts, Connecting With Equipments & Nozzles, Providing Tappings From The Existing Pipelines At All Grades & Elevations Including Under Road Culverts. , The Piping Job Includes All Modification And Replacement Jobs Involving Pipes & All Types Of Fittings Like Elbows / Tees / Reducers / Half Coupling / Full Coupling, Etc., All Types Of Flanges Like Slip On / Raised Face, Etc., All Types Of Inline Instruments Like Rotameter / Pressure Gauges / Thermowells, Etc., Valves, Expansion Joints, Steam Traps, Orifice Assemblies, Strainers, Vents, Drains, Funnels, Etc., Of Different Schedules, Pressure Ratings And For Various Temperature Applications , The Piping Job Includes Providing Shoe Supports, Pads At Support Locations, Reinforcement Pads, Etc., Wherever Required. , The Job Includes Flushing, Preparing Work Area For Executing Hot Work, Bending To Suit The Contours Wherever Required, Socket, Fillet, Butt Welding Using E 6010 / E 6013 / E 7018 Electrodes / Er 70S2 Filler Wire As Required, Post Weld Heat Treatment ( Pwht - Stress Relieving ) After Welding Wherever Required, Hydraulic / Pneumatic Test As Per Codes, Specification, Drawings And Draining Of Water & Drying With Compressor Air After Hydrotest. , The Job Also Includes Supplying Of All Types Of Tools & Tackles, Lifting Arrangements Like Chain Pulley Blocks, Machineries, All Consumables And Labour To Complete The Job In All Respects, Returning Back The Unused Materials To Owners Storage Point And Dumping The Generated Scrap Material To The Designated Area As Per Eic Instructions. , The Rates For The Following Items Shall Be Exclusive Of Blinding & Deblinding, Radiography, Stress Relieving, Reinforcement Pad Welding, Removal Of Old Piping For Replacement And Erection & Removal Of Scaffolding , The Rates For The Following Items Shall Be Inclusive Of Fabrication, Laying, Erection, Welding, Providing Shoe Supports, Pads At Support Locations, Flushing Of The Piping System, Offering Stagewise Inspection, Hydrotesting And Draining / Drying Of The Piping System. , With Cpcl Supply Of Free Power & Contractors Welding Machine , Butt Welding - Upto 5 Metres From Ground Level - Using E-6010 / E-6013 / E-7018 Electrodes , Carbon Steel - Above Ground Piping -Butt Welding Joint - Above 8.8 Mm And Upto 12.7 Mm Thickness - With Hydrotest ( Root E-6010 / Filling E-6013 / E-7018 ) , Socket Welding - All Elevations , Carbon Steel - Above Ground Piping -Socket / Fillet Welding Joint -With Hydrotest , Carbon Steel Piping Specials Like Mitre Cut Bend, Reducers , The Job Includes Transporation Of All Free Issue Materials From Owners Storage Point To Work Site, Handling At Site, Cutting, Bevelling, Fabrication & Welding Of Carbon Steel Piping Specials ( Of Any Thickness ) Like 4 Element - 3 Weld Type 90° Mitre Cut Bend, 3 Element - 2 Weld Type 45° Mitre Cut Bend / Reducers, Etc., At All Locations Above Ground Level, Overhead, Over Sleepers, Piperacks, Crossovers, Pipe Sleeves, Trenches, Stand Posts, Connecting With Equipments & Nozzles At All Grades & Elevations Including Under Road Culverts Of Different Schedules, Pressure Ratings And For Various Temperature Applications. , The Job Includes Flushing, Preparing Work Area For Executing Hot Work, Bending To Suit The Contours Wherever Required, Welding Using E 6010 / E 6013 / E 7018 Electrodes As Required, Hydraulic / Pneumatic Test As Per Codes, Specification, Drawings And Draining Of Water & Drying With Compressor Air After Hydrotest. , The Job Also Includes Supplying Of All Types Of Tools & Tackles, Lifting Arrangements Like Chain Pulley Blocks, Machineries, All Consumables And Labour To Complete The Job In All Respects, Returning Back The Unused Materials To Owners Storage Point And Dumping The Generated Scrap Material To Designated Area As Per Eic Instructions. , The Rates For The Following Items Shall Be Exclusive Of Radiography, Stress Relieving, Welding Of Vents & Drainsand Erection & Removal Of Scaffolding , The Rates For The Following Items Shall Be Inclusive Of Fabrication, Welding, Offering Stagewise Inspection. , Mitre Bends - Butt Weld Joint - Carbon Steel , Mitre Bends - Butt Weld Joint - Above 8.8 Mm And Upto 12.7 Mm Thickness , Reducers - Butt Weld Joint - Carbon Steel , Reducers - Butt Weld Joint - Above 8.8 Mm And Upto 12.7 Mm Thickness , Blinding And De-Blinding , The Job Includes Collection & Transportation Of Required Quantity Of Materials Like Blinds, Gaskets, Fasteners, Etc., From Owners Storage Point, Loosening & Tightening Of Studs ( Cold / Gas Cutting If Required ) , Wedge Opening, Cleaning Of Flanges, Insertions Andremoval Of Blind & Gaskets, Providing New Gaskets After Removal Of Blinds, Overhauling Of Fasteners Using Oil, Replacing The Defective Studs / Nuts To Ensure Zero Leak Of Joints Including Hot Bolting. , The Job Also Includes Supplying Of All Types Of Tools & Tackles, Lifting Arrangements Like Chain Pulley Blocks, Machineries, All Consumables And Labour To Complete The Job In All Respects, Transportation Of Unused Materials To Owners Storage Point And Dumping The Generated Scrap Material To Designated Area As Per Eic Instructions. , Blinding And Deblinding For 150# & 300# Ratings: , Blinding & Deblinding - Size Upto1-1 / 2 Inch Dia. , Blinding & Deblinding - Size 2 Inch Dia. To 5 Inch Dia. , Blinding & Deblinding - Size 6 Inch Dia. To 10 Inch Dia. , Blinding & Deblinding - Size 12 Inch Dia. To 16 Inch Dia. , Blinding & Deblinding - Size 18 Inch Dia. To 24 Inch Dia. , Dismantling & Removal Of Piping , The Job Involves Removal Of Existing Above Ground, Under Ground, Overhead Insulated Or Uninsulated Or Steam Traced Piping Including All Types Of Fittings Like Elbows / Tees / Reducers, Etc., Flanges, Valves, All Types Of Instruments, Supports By Coldcutting / Gas Cutting / Grinding, Etc., At All Locations At All Grades & Elevations Without Damaging Any Other Portion Of The Existing Unit, Lowering Down The Same To Ground Level, Transportation Of The Same To The Designated Area As Per The Instructions Of Engineer-In-Charge. The Insulation Materials To Be Removed From The Pipesand Transported To Their Respective Designated Locations As Per Eic. , The Job Also Includes Supplying Of All Types Of Tools & Tackles, Lifting Arrangements Like Chain Pulley Blocks, Machineries, All Consumables And Labour To Complete The Job In All Respects. , Dismantling & Removal Of Piping - Carbon Steel / Alloy Steel , Dismantling & Removal Of Piping - Carbon Steel / Alloy Steel , Dismantling & Removal Of Structurals / Gratings , The Job Involves Removal Of Existing Above Ground, Overhead Structurals Including Platforms, Ladders, Gi & Steel Gratings By Unfastening / Coldcutting / Gas Cutting / Grinding, Etc., From Various Locations At All Grades & Elevations Without Damaging Any Other Portion Of The Existing Unit, Lowering Down The Same To Ground Level, Transportation Of The Same To The Designated Area Or Scrap Yard As Per The Instructions Of Engineer-In-Charge Including Weighment Of The Material At The Appropriate Place Within The Refinery Premises, If Required. , The Job Also Includes Supplying Of All Types Of Tools & Tackles, Lifting Arrangements Like Chain Pulley Blocks, Machineries, All Consumables And Labour To Complete The Job In All Respects. , Dismantling & Removal Of Structurals / Gratings , Dismantling & Removal Of Structurals / Gratings , Supply, Fabrication And Erection Of Structurals: , Supplying, Transporting, Storing, Fabricating & Erecting In Positionbolted And / Or Welded Structural Steel Works ( Grade A / B ) Like Angles, Channels, Beams, Plates, Flats, Etc Confirming To Is: 2062 Etc.At Allheights & Levels And Locations Including All Built-Up Sections / Compoundsections Made Out Of Rolled Sections And / Or Plates / Bent Plates Forpipe Rack , Pipe Bridge , T Post, Shed , Staircase, Ladders / Monkeyladders, Walkways, Hand Rails, Platforms, Structural Pipe Supports, Rungs, Etc., Cutting To Required Size, Straightening / Bending Ifrequired, Edge Preparation, Cleaning, Scrapping & Welding Of Unsound Joints In Existing Structural Members, Preheating, ( Including Sealingof Box Section With Continuous Welding ) Finishing Edges By Grinding , Fixing In Line And Level With Temporary Bracings, Including Preparingthe Surface For Painting , Surface Cleaning, Wire Brushing, Removal Ofmill Scale, Dust, Rust, Oil Or Grease, Etc Complete. Follows:A ) At Shop :- Surface Preparation As Per Sspc-Sp-2 / St 2 And Painting As Per Specification Enclosed.The Job Also Includes Providing And Fixing Gi Pipe Hand Rail Of Approvedsize By Welding Etc. To Steel Ladder Railing, Balcony Railing, Staircase Railing And Similar Works, Including Applying A Priming Coatofapproved Steel Primer , Cs Structural Jobs Of All Types : , Supply, Fabrication, Erection And Application Of Painting As Above , Removal / Installation / Refixing Of Flanged Valves , Removal Of Flanged Valves ( Other Than Safety Valves ) , The Job Includes Removal Of Flanged Valves At All Grades & Elevations By De-Bolting / Cold Cutting / Gas Cutting And Transportation Of The Valve To The Maintenance Valve Shop Or Any Other Designated Place Inside The Refinery Premises For Repair / Disposal. , The Job Also Includes Supplying Of All Types Of Tools & Tackles, Lifting Arrangements Like Chain Pulley Blocks, Dumping The Generated Scrap Material To The Designated Area, All Consumables And Labour To Complete The Job In All Respects. , Valve Rating - 150# & 300# , Removal Of Valves - Size 12 Inch Dia. To 14 Inch Dia. , Removal Of Valves - Size 16 Inch Dia. To 18 Inch Dia. , Removal Of Valves - Size 20 Inch Dia. To 24 Inch Dia. , Installation Of Flanged Valves ( Other Than Safety Valves ) , The Job Includes Transportation Of Valves, Gaskets, Fasteners, Etc., From The Owners Storage Point Or Valve Maintenance Shop, Cleaning, Checking, Tightening The Gland, Greasing & Freeing Up Etc., Servicing Of All The Fasteners Using Oil, Replacing With New Fasteners Wherever Required, Hydrotesting The Valve If Required, At The Specified Pressure At Valve Maintenance Shop, Installation Of Flanged Valve At All Heights & Grades Using Proper Gaskets & Studs. , The Job Also Includes Supplying Of All Types Of Tools & Tackles, Lifting Arrangements Like Chain Pulley Blocks, Dumping The Generated Scrap Material To The Designated Area, All Consumables And Labour To Complete The Job In All Respects. , Valve Rating - 150# & 300# , Installation Of Valves - Size 12 Inch Dia. To 14 Inch Dia. , Installation Of Valves - Size 16 Inch Dia. To 18 Inch Dia. , Installation Of Valves - Size 20 Inch Dia. To 24 Inch Dia. , Tape Coating , Supply And Application Of Corrosion Protection Tape Coating Forunder Ground Steel Pipelines As Per Specification , Tape Coating , Radiography , The Job Includes Performing Radiography Examination Of Welds On Piping & All Type Of Equipments As Per Relevant Asme / Astm Standards & As Per Cpcl Specification Cpcl-Insp-Rad-01 At All Grades & Elevations With Film Width Not Less Than 4 Inches. , The Job Also Includes Supplying Of Radiation Source Camera, Other Machineries Required, All Consumables Required For Filming & Developing, Transportation Of Camera, Etc., Area Preparation Before Starting The Job, Labour, Supervision To Complete The Job In All Respects Including Preparation Of Developing Chemicals, Developing The Films & Submission Of Films For Inspection Review. , Weld Joint Size Above 6 Nominal Dia , Earth Work Excavation & Back Filling , The Job Involves Earth Work Excavation & Below Ground Level Upto 2 Metres Depth To A Required Width For Laying Underground Piping In All Typesof Soils Including Removal Of Vegetation, If Required, Dressing Ofsides, Levelling, Grading, Ramming Of Bottom, Back Filling On Completionof Laying Of Pipes With Available Excavated Soil, Watering, Rolling, Ramming Of By Manual Methods / Mechanical Compactors, Dressing, Trimming, Etc. , The Job Also Includes Supplying Of Alltypes Of Tools & Tackles, Machineries, All Consumables And Labour To Complete The Job In All Respects As Per Eic Instructions. , Earth Work Excavation & Back Filling -Upto 2 Metres Depth , Transportation , Transportation Ofcarbon Steelpipesfrom Manali Ware House To Nagapatiinam Site, Obtaining The Gate Pass And Necessary Documents And Clearnacesfrom The Concerned Authority At Cpcl Manali And Loading The Material At Manali Ware Houseand Transporting The Pipes To Nagapattinam Site With Required Material Entry And Clearances Required And Unloading The Pipes At The Location Indicated By The Cpcl Nagapttinam . Hydra Crane, Tools, Slings, Manpower, Permits, Safety Equipments Etcrequired For Loading And Unloading At Cpcl Manali And Cpcl Nagapattinam Site Are In The Scope Of The Contractor. All The Equipments, Tools , Safety Gear To Be Certified As Per The Safety Standards Followed.Cost Includes Any Incidental Expenses, Toll Charges Etc Whatever Charges Applicable Involving Transportation. , Transportation Of 16 Pipe Api 5L Pipe With Above 8.8 Mm Upto 12.7 Mm Piping Thicknes And 12 Meter Length , Civil Works , Earth Work In Excavation Below Ground Level For All Kinds Of Works In All Types Of Soils Including Soft Rock Except Hard Rock As Classified In Specification For A Depth Upto 1.5M Including Removal Of Vegetation, Shrubs And Debris, Cutting And Dressing Of Sides In Slopes, Levelling, Grading And Ramming Of Bottoms, Dewatering Of Accumulated Water From Any Source And Keeping The Surface Dry For Subsequent Works And Disposal Or Stacking Of Excavated Material Within A Lead Of 100M, As Directed Including Providing Temporary Supports To Exisiting Service Lines Like Water Pipes, Sewage Pipes, Electric Overhead And Underground Cables Etc. All Complete, But Excluding Shoring And Strutting. , Backfilling After Execution Of The Work To Proper Grade And Level With Selected Materials From Available Excavated Soil From Spoil Heaps Within A Lead Of 100M, Including Re- Excavating The Deposited Soil Excavated Earlier, Breaking Clods, Laying At All Depths And Heights In Layers Of Thickness Not Exceeding 15 Cms. Watering, Rolling And Ramming By Manual Methods / Mechanical Compactors To Achieve Minimum 90% Modified Proctor Dry Density As Per Is: 2720 Part-Viii, Dressing, Trimming Etc. In Foundations, Plinths, Trenches, Pits Etc. All Complete. , Supplying And Filling Approved Sand Of Specified Quality In Foundations, For All Depths And Heights Including Cost Of Sand, Royalties, Transportation To Site For All Leads And Lifts, Including Loading, Unloading, Spreading In Layers Of Loose Thickness Not Exceeding 150Mm, Watering, Ramming, Compacting With Mechanical Compactors And Or Other Equipment To The Specified Levels To Achive 95% Modified Proctor Density As Per Is:2720, Including Preparation Of Subgrade To The Required Slope, Providing Testing Apparatus And Testing The Degree Of Consolidation All Complete As Per Drawings, Specifications And Direction Of Engineer-In-Charge. The Rates Shall Be Inclusive Of The Cost Of All Labour, Material, Equipments Etc. All Complete. , Providing And Laying Plain Cement Concrete ( Pcc 1:5:10 ) In Foundations, Or Any Other Works Including Shuttering, Tamping, Ramming, Vibrating, Curing, Etc.All As Specified In Any Thickness & Finishing The Top Surface. The Quoted Price Shall Be Inclusive Of All Materials, Tools, Tackles, Labours Etc Complete As Per Direction Of Engineer In-Charge. , Providing And Laying In Position Reinforced Cement Concrete Work Of M-30 Grade; Using 20Mm And Down Size Graded Crushed Stone Aggregate In Foundations, Pipe Sleepers Using Portland Slag Cement, Admixtures, Including Pumping Of Concrete To Site Of Laying, Curing, Carriage For All Leads; But Excluding The Cost Of Centering, Shuttering, Finishing, Reinforcement, Metal Inserts, Pipe Sleeves, Water Stops; Filler Material In Expansion Joints; As Per Drawings, Specifications And Direction Of The Engineer-In-Charge For The Following Grades Of Concrete. Provision Of Inserts Plates, Welding To Reinforcement Rods, Vibrating, Ramming, Tamping, Curing And Rendering To Give A Smooth Surface Finish For All Depths And Below Upto Plinth Level As Specified. The Quoted Price Shall Be Inclusive Of All Materials, Tools Tackles, Labours, Etc. Complete. , Providing And Fixing Steel Centering And Shuttering In Foundations, Footings, Raft, Beams, Slabs , Pile Caps, Retaining Walls, Jambs, Counter-Forts, Buttresses, Trenches, Equipment / Machine Foundations, Pedestals, Abutments, Pipe Sleepers, Columns, Plinth Beams, Lintels, Suspended Tunnels / Bunkers / Silos / Shafts / Hoppers / Liquid Storage Structures Etc. For All Depths Below And Upto & Inclusive Of Plinth Level Including Shuttering For Single Pour Concreting, Strutting, Bracing, Propping Etc., Keeping The Same In Position During Concreting And Removal Of The Same After Specified Period Etc. For Straight / Inclined Shuttering, Keeping Necessary Provision Forinserts, Projecting Dowels, Anchor Bolts, Pipe Sleeves, Conduits Or Any Other Fixture Etc. All Complete Andas Specified In The Drawings, Specifications And Directions Of Engineer-In-Charge. For Unavoidable Portions And Very Minor Works, 12Mm Thick Water Proof Plywood May Be Used With Permission Of Eic. , Supplying And Placing In Position High Strength Deformed Steel Bars Reinforcement ( Conforming To Is :1786 Grade Fe 500 D ( Tmt ) ) For Rcc Work Transporting The Same For Store / Issue Points To Site Of Work, Straightening, Cleaning, De-Coiling , Cutting , Bending With Required Shapes And Lengths As Per Details, 18 Gauge Black Soft Annealed Swg Binding Wire At Every Intersection , Supplying And Placing With Proper Cover Blocks, Supports, Chairs, Overlaps, Welding, Spacers, Fan Hooks Etc.For All Heights And Depth Etc. All Complete As Directed. , Supplying, Fabricating, Transporting, Handling, Storing, Fixing In Position E250 Br / B0 Grade, ( Confirming To Is:2062 ) , M.S. Metal Inserts ( With Lugs ) Of Any Shape Made Out Of Plates, Flats, Including Cost Of Steel Handling Transporting, Providing Necessary Templates, Staging, Cutting Straightening If Required, Welding As Required And Embedding In Position On Both Plain And Reinforced Cement Concrete Members Inclusive Of Adjusting Shuttering & Reinforcement / Any Other Fixture, Welding Where Necessary, Tying And Holding To Correct Level, Line And Position, Any Auxiliary Dummy Structure To Support The Heavy Inserts, Fully Painted Including Surface Preparation, Primer, Intermediate And Final Coats As Per Painting Specification All Complete For All Depths And Heights As Specified And Directed. , Painting Works , Cpcl Painting System-X For Culvert & Other Pipings And Structurals ( Application Brush / Conventional Spray ) , By Hand Tool Cleaning To Sspc-Sp-2 / St 2 , Primer : One Coat Of Self Priming Epoxy Paint, Min Dft100 Microns / Coat , Inter : One Coat Of Polyamide Cured Hbepoxy Mio Paint, Min.Dft Of 75 Microns / Coat , Finish : Two Coats Of Acrylic Polyeurethene Finish Paint, Min.Dft Of 35 Microns / Coat => Limited

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 23-Mar-2023 Corrigendum No.1 Date 30-03-2023

Key Value

Document Fees
Refer document
EMD
INR 95200.0 /-
Tender Value
Refer document
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail