Rates & Quantum Of Works For Increasing Capacity Of Transformer Sfrom 25 Kva To 63 Kva-03 Nos. ( At Village Ghurwara Block Dalmau, Village Newada Pattiblock Dalmau, Village Bibipur Block Dalmau, Increasing Capacity Of T / Fsfrom 63 Kva To 100 Kva-02 No
Tender Overview
Project Description
Rates & Quantum Of Works For Increasing Capacity Of Transformer Sfrom 25 Kva To 63 Kva-03 Nos. ( At Village Ghurwara Block Dalmau, Village Newada Pattiblock Dalmau, Village Bibipur Block Dalmau, Increasing Capacity Of T / Fsfrom 63 Kva To 100 Kva-02 Nos. ( At Village Tarapur-1 Block Dalmau, Village Tarapur-2 Block Dalmau, Increasing Capacity Of T / Fsfrom 100 Kva To 250 Kva-02 Nos. ( At Village Rasoolpurdalmau, Village Bada Math Block Dalmau, Under Business Plan-2023-24, In Juriduction Of Executive Engineer, Electricity Distribution Division- Dalmau, Raebareli.
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 20-Mar-2023 | DATE EX | Date | 27-Mar-2023 |
| 2 | 28-Mar-2023 | DATE EX. | Date | 12-Apr-2023 |
BOQ
| Sl. No. | Item Description |
| 1 | INCREASING CAPACITY OF T/FSFROM 25 KVA TO 63 KVA AT VILLAGE LGHURWARA BLOCK DALMAU,UNDER EDD-DALMAU. |
| 2 | Carriage of 63 KVA T/F from ESC Tripula to work site with loading- unloading, Then Unmounting of old existing 25 KVA T/F from D/Pole/Four Pole Structure/Plinth then stacking of dump site with loading unloading,Mounting of 63 KVA T/F on D/Pole/Four Pole Structure alongwith fitting of all related accessories, earthing of T/F body & neutral As per RESPO norms, as per Estimate. |
| 3 | Recd. back of old & Used 25 KVA T/F (01 No.) and other Materials from work site to ESC Tripula, Raebareli after dismantling of T/F from D/Pole/Four Pole Structure/ Plinth, alongwith loading unloading, As per Estimate. |
| 4 | INCREASING CAPACITY OF T/FSFROM 25 KVA TO 63 KVA AT VILLAGE VILLAGE NEWADA PATTI BLOCK DALMAU,UNDER EDD-DALMAU. |
| 5 | Carriage of 63 KVA T/F from ESC Tripula to work site with loading- unloading, Then Unmounting of old existing 25 KVA T/F from D/Pole/Four Pole Structure/Plinth then stacking of dump site with loading unloading. Mounting of 63 KVA T/F on D/Pole/Four Pole Structure alongwith fitting of all related accessories, earthing of T/F body & neutral As per RESPO norms, as per Estimate. |
| 6 | Recd. back of old & Used 25 KVA T/F and other Materials from work site to ESC Tripula, Raebareli after dismantling of T/F from D/Pole/Four Pole Structure/ Plinth, alongwith loading unloading, As per Estimate. |
| 7 | INCREASING CAPACITY OF T/FSFROM 25 KVA TO 63 KVA AT VILLAGE VILLAGE BIIBI PUR BLOCK DALMAU,UNDER EDD-DALMAU. |
| 8 | Carriage of 63 KVA T/F from ESC Tripula to work site with loading- unloading, Then Unmounting of old existing 25 KVA T/F from D/Pole/Four Pole Structure/Plinth then stacking of dump site with loading unloading. Mounting of 63 KVA T/F on D/Pole/Four Pole Structure alongwith fitting of all related accessories, earthing of T/F body & neutral As per RESPO norms, as per Estimate. |
| 9 | Recd. back of old & Used 25 KVA T/F and other Materials from work site to ESC Tripula, Raebareli after dismantling of T/F from D/Pole/Four Pole Structure/ Plinth, alongwith loading unloading, As per Estimate. |
| 10 | INCREASING CAPACITY OF T/FSFROM 63 KVA TO 100 KVA AT VILLAGE TARA PUR-1 BLOCK DALMAU,UNDER EDD-DALMAU. |
| 11 | Carriage of 100 KVA T/F from ESC Tripula to work site with loading- unloading, Then Unmounting of old existing 63 KVA T/F from D/Pole/Four Pole Structure/Plinth then stacking of dump site with loading unloading,Mounting of 100 KVA T/F on D/Pole/Four Pole Structure alongwith fitting of all related accessories, earthing of T/F body & neutral As per RESPO norms, as per Estimate. |
| 12 | Recd. back of old & Used 63 KVA T/F (01 No.) and other Materials from work site to ESC Tripula, Raebareli after dismantling of T/F from D/Pole/Four Pole Structure/ Plinth, alongwith loading unloading, As per Estimate. |
| 13 | INCREASING CAPACITY OF T/FSFROM 63 KVA TO 100 KVA AT VILLAGE TARA PUR-2 BLOCK DALMAU,UNDER EDD-DALMAU. |
| 14 | Carriage of 100 KVA T/F from ESC Tripula to work site with loading- unloading, Then Unmounting of old existing 63 KVA T/F from D/Pole/Four Pole Structure/Plinth then stacking of dump site with loading unloading,Mounting of 100 KVA T/F on D/Pole/Four Pole Structure alongwith fitting of all related accessories, earthing of T/F body & neutral As per RESPO norms, as per Estimate. |
| 15 | Recd. back of old & Used 63 KVA T/F (01 No.) and other Materials from work site to ESC Tripula, Raebareli after dismantling of T/F from D/Pole/Four Pole Structure/ Plinth, alongwith loading unloading, As per Estimate. |
| 16 | INCREASING CAPACITY OF T/FSFROM 100 KVA TO 250 KVA AT VILLAGE RASOOLPUR,BLOCK DALMAU UNDER EDD-DALMAU |
| 17 | Carriage of 250 KVA T/F from ESC Tripula to work site with loading- unloading, Then Unmounting of old existing 100 KVA T/F from D/Pole/Four Pole Structure/Plinth then stacking of dump site with loading unloading, |
| 18 | The work for Earth excavation of new Plinth size 2.50X2.50X1.25 Mtr. for making outer wall of Plinth by 1st class brick work in Cement mortar of ratio1:6 of filling earth in Plinth and providing Ston ballast and fixing 02 No.90 Iballs Rail pieces (6.9 Mtr) of proper distance and then plastering the top and all side of plinth wall with cement Corse and sand in ratio 1:4 and then proper spraying of water alongwith All materials & Labour. Installation of 250 KVA T/F on Plinth alongwith fitting of all related accessories, earthing of T/F body & neutral As per RESPO norms, |
| 19 | The work for Fabrication of fencing in size 3x3x1.5 mtr. in the arround of T/F plinth by Angle in size 40x40x5mm, and best quality mesh fencing with Errection, grouting of the same and painting of one coat Red Oxide Primer and Two coat Enamel Paint and providing one No.Gatein mesh Fencing. |
| 20 | Makin/Fixing of XLPE Cable (1X400sq.mm.). |
| 21 | Recd. back of old & Used 25 KVA T/F (01 No.) and other Materials from work site to ESC Tripula, Raebareli after dismantling of T/F from D/Pole/Four Pole Structure/ Plinth, alongwith loading unloading, As per Estimate. |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-2 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender