|
| 1 | Operation and Maintenance chargesof Sodium lamp 250Watt light pointinstalled on pole/wall (includingon/off, cost of material charges i.e.tube Rod, Starter, Choke, SlideHolder, PVC Tape Flexible wire,Conductor/ cable etc. and arrangingof TandP i.e. Hydraulic ladder/Wooden ladder safety belt / shoesetc.) on various areas complete inall respect up to the entiresatisfaction of engineer incharge of the work. |
| 2 | Operation and Maintenance chargesof Sodium lamp 400Watt light pointinstalled on pole / wall (includingon/off, cost of material charges i.e.tube Rod, Starter, Choke Side Holder,PVC Tape Flexible wire, Conductor/cable etc. and arranging of TandPi.e. Hydraulic ladder/ Wooden laddersafety belt / shoes etc.) on variousareas complete in all respect up tothe entire satisfaction of engineer incharge of the work. |
| 3 | Operation and Maintenance chargesof Sodium lamp 150Watt light pointinstalled on pole/wall (includingon/off, cost of material charges i.e.tube Rod, Starter, Choke, SideHolder, PVC Tape Flexible wire,Conductor/ cable etc. and arrangingof TandP Le Hydraulic ladder/Wooden ladder safety belt / shoesetc.) on various areas complete inall respect up to the entiresatisfaction of engineer incharge of the work. |
| 4 | Operation and Maintenance chargesof LED street light 30/45/72Wattpoint installed on pole / wall(including on/off cost of materialcharges i.e. tube Rod, Starter, ChokeSide Holder, PVC Tape Flexible wire,Conductor/ cable etc. and arrangingof TandP i.e. Hydraulic ladder/Wooden ladder safety belt / shoesetc.) on various areas complete inall respect up to the entiresatisfaction of engineer incharge of the work. |
| 5 | Operation and Maintenance chargesof High Mast light with 100Watt LEDFlood Light point installed on pole /wall (including on/off, cost ofmaterial charges i.e. tube Rod,Starter, Choke Side Holder PVC TapeFlexible wire, Conductor/ cable etc.and arranging of TandP i.e.Hydraulic ladder/Wooden laddersafety belt / shoes etc.) on variousareas complete in all respect up tothe entire satisfaction of engineer incharge of the work. |
| 6 | Operation and Maintenance chargesof 23watt LED bulb light pointinstalled on pole / wall ( includingon/off, cost of material charges i.e.tube Rod, Starter, Choke, SideHolder, PVC Tape Flexible wire,Conductor/ cable etc. and arrangingof TandP i.e. Hydraulic ladder/Wooden ladder safety belt/shoesetc.) on various areas complete inall respect up to the entiresatisfaction of engineer incharge of the work. |
| 7 | Operation and Maintenance chargesof 40watt tube light point installedon pole / wall (including on/off, costof material charges i.e. tube Rod,Starter, Choke, Side Holder, PVCTape, Flexible wire, Conductor/ cableetc. and arranging of TandP i.e.Hydraulic ladder/ Wooden laddersafety belt / shoes etc.) on variousareas complete in all respect up tothe entire satisfaction of engineer incharge of the work. |