Rural Development Panchayath Raj Engineering Department-RDPRED has published Tender For Supply Of Building Materials For Nrlm Work Shed Under Mgnrega In Bachanaki G.P Mundgod. Submission Date for this Tender is 23-03-2023. Rough Finishing Tools Tenders in bangalore Karnataka. Bidders can get complete Tender details and download the document.




Tender Notice

36779914
Tender For Supply Of Building Materials For Nrlm Work Shed Under Mgnrega In Bachanaki G.P Mundgod
Open Tender
Indian
Karnataka
bangalore
23-03-2023

Tender Details

Supply Of Building Materials For Nrlm Work Shed Under Mgnrega In Bachanaki G.P Mundgod , Broken Stone Aggregate 40 Mm Size, Broken Stone Aggregate 20 Mm Size, Broken Stone Aggregate 12 Mm To 10 Mm Size, Coarse Sand ( Zone Iii ) , Portland Cement, Mixer ( Concrete ) - 1 Cum Capacity, Add Watering Charges At 1 % On Material, Add Sundries Charges At 1 % On Material, Over Head & Other Miscellaneous Charges, Burnt Bricks Of Class Designation 35 Modular, Mixer ( Concrete Small Used In Culvert ) , Mason Class I ( With Tools ) , Mason Class Ii ( With Tools ) , Casurina Poles 100 - 150 Mm, Add Handling , Loading And Unloading At 1% On Material, Add Sundries Charges At 2 % On Material, Tmt Bars Fe 500, Binding Wire, Ms Pipes Of 80 Mm To 100 Mm Dia, Rms Gusset Plate, Corbon Electrodes, Welder Grade I, Hom Of Welding And Grinding Machine, Add, Mechanic Class Ii / Mechanic Hmp Grade I / Eme Grade, Hom Of Cutting And Grinding Machine, Tools And Plants @2% On Material, Unit Cost As Per The Specification, Plasticizer / Super Plasticizer, Hom Of Vibrator 0.71 Days, Solid Concrete Blocks ( 40 X 20 X 20 Cms ) -4.00 N / Sqmm, Jungle Wood Runners And Planks, Silver Oak Or Equivalent Planks 38 Mm Thick, Add Handling , Loading And Unloading At 2% On Material, Casurina Poles 75 - 100 Mm Dia, Vitrified Tiles 600X600 Mm, High Bond Tile Adhesive For Vitrified Tiles, Adhesive For Joints, Colour Glazed Tiles 30X60 Cms 6Mm Thick, Border Tiles 30 X 10 Cms, Add White Cement For Pointing At 2% On Material, Add Watering Charges At 1 % On Labour, Honnewood Planks For Panels 20 Mm Thick, Add Cutting And Other Wastage 5%, Carpenter Assistant, Hom Of Machinaries For Planing, M.S Rods, Ms Flat, Fitter Class I, Add Hom Of Welding And Grinding Machine @ 4% On Material, Ready Mix Primer Paint ( Ready Mix Red Lead Paint ) , Add Wire Brush, Fine Steel Wool, Putty, Sand Paper, At 3% On Cost Of Paint, Painter Class I, Add Providing And Removing Scaffolding At 3% On Labour, Enamel Metal Paint, Add Brush At 1% On Cost Of Paint, Honne Wood, 5Mm Pvc Sheet, Ms Tube, Solvent Cement Adhesive, Add Tools Transportation And Machinaries 1% On Material, Paint Remover, Blow Lamp, Brushes, Shrubs, Turpentine Oil, Putty At 5% On Paint Removal Cost., Aluminium Window Frame Section 1.20 Mm Thick, Nylon Rollers, Rubber Beading For Shutters Beading, Pvc Beading, Alluminium Tower Bolt - 20 Cm, Alluminium Handles - 15 Mm, Cleat Angles, Chrominum Plated Screws, 5.50 Mm Thick Plain Glass, Add 15% Wastage For Glass, Fabricator, Add Hom Of Welding And Grinding Machine @ 2% On Material, Add Sundries Charges At 1 % On Labour, Distemper Primer, Add Brush, Putty At 5% On Cost Of Distemper Primer, Plastic Emulsion Paint, Add Brush, Putty, Sand Paper, Roller At 5% On Cost Of Paint, Water Proofing Cement Paint, Add Brush, Putty, Sand Paper At 2% On Cost Of Paint, Polyenthylene Water Storage Tank Of Specified Capacity L, Labour Charges For Lifting And Placing In Position And Making Connection At 7% On Material, Handling Loading And Unloading 3% On Material, 50 Mm Dia Ms Hollow Pipe B Class 14 Gauge, 20 Mm X20mm Vertical M.S Square Rod, 12X12 M.S Square Rod, Anticorrosive Bitumastic Paint, Hom Of Cutting And Grinding Machine1, Transportation Loading And Unloading @1% On Material

Key Value

Document Fees
INR 550 /-
EMD
INR 25000.0 /-
Tender Value
Refer document

BOQ Items

Sl. No. Item Name
1Broken stone aggregate 40 mm size
2Broken stone aggregate 20 mm size
3Broken stone aggregate 12 mm to 10 mm size
4Coarse sand (zone III)
5Portland Cement
6Mixer (concrete) - 1 cum Capacity
7Add watering charges at 1 % on Material
8Add sundries charges at 1 % on Material
9Over Head & other Miscellaneous Charges
10Burnt Bricks of class designation 35 modular
11Mixer (concrete small used in culvert)
12Mason Class I (with tools)
13Mason Class II (with tools)
14Casurina poles 100 - 150 mm
15Add Handling , loading and unloading at 1% on Material
16Add sundries charges at 2 % on Material
17TMT bars Fe 500
18Binding wire
19MS pipes of 80 mm to 100 mm dia
20RMS Gusset plate
21Corbon electrodes
22Welder Grade I
23HOM of welding and grinding machine
24Add
25Mechanic Class II/Mechanic HmP Grade I/EME Grade
26HOM of cutting and grinding machine
27Tools and Plants @2% on material
28Unit Cost as per the Specification
29Plasticizer / super plasticizer
30HOM of Vibrator 0.71 days
31Solid concrete blocks (40 x 20 x 20 cms)-4.00 N/Sqmm
32Jungle wood runners and planks
33Silver oak or equivalent planks 38 mm thick
34Add Handling , loading and unloading at 2% on Material
35Casurina Poles 75 - 100 mm dia
36Vitrified tiles 600x600 mm
37High bond tile adhesive for vitrified tiles
38Adhesive for joints
39Colour glazed tiles 30x60 cms 6mm thick
40Border Tiles 30 x 10 cms
41Add White cement for pointing at 2% on Material
42Add watering charges at 1 % on Labour
43Honnewood planks for panels 20 mm thick
44Add cutting and other wastage 5%
45Carpenter Assistant
46HOM of Machinaries for planing
47M.S Rods
48MS flat
49Fitter Class I
50Add HOM of welding and grinding machine @ 4% on Material
51Ready mix primer paint (Ready mix red lead paint)
52Add Wire brush, fine steel wool, putty, sand paper, at 3% on cost of paint
53Painter Class I
54Add providing and removing scaffolding at 3% on Labour
55Enamel metal paint
56Add Brush at 1% on cost of paint
57Honne wood
585mm PVC sheet
59MS Tube
60Solvent cement adhesive
61Add Tools Transportation and machinaries 1% on Material
62Paint Remover
63Blow lamp, brushes, Shrubs, turpentine oil, putty at 5% on paint removal cost.
64Aluminium window frame section 1.20 mm thick
65Nylon rollers
66Rubber beading for shutters beading
67PVC beading
68Alluminium tower bolt - 20 cm
69Alluminium handles - 15 mm
70Cleat angles
71Chrominum plated screws
725.50 mm Thick plain glass
73Add 15% wastage for glass
74Fabricator
75Add HOM of welding and grinding machine @ 2% on Material
76Add sundries charges at 1 % on Labour
77Distemper primer
78Add Brush, putty at 5% on cost of distemper primer
79Plastic emulsion paint
80Add Brush, putty, sand paper, roller at 5% on cost of paint
81water proofing cement paint
82Add Brush, putty, sand paper at 2% on cost of paint
83Polyenthylene water storage tank of specified capacity L
84Labour charges for lifting and placing in position and making connection at 7% on Material
85Handling loading and unloading 3% on Material
8650 mm dia MS Hollow pipe B Class 14 Gauge
8720 mm x20mm vertical M.S Square Rod
8812x12 M.S Square Rod
89Anticorrosive bitumastic paint
90HOM of cutting and grinding machine1
91Transportation loading and unloading @1% on material
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail