Supply Of Building Materials For Nrlm Work Shed Under Mgnrega In Bachanaki G.P Mundgod , Broken Stone Aggregate 40 Mm Size, Broken Stone Aggregate 20 Mm Size, Broken Stone Aggregate 12 Mm To 10 Mm Size, Coarse Sand ( Zone Iii ) , Portland Cement, Mixer ( Concrete ) - 1 Cum Capacity, Add Watering Charges At 1 % On Material, Add Sundries Charges At 1 % On Material, Over Head & Other Miscellaneous Charges, Burnt Bricks Of Class Designation 35 Modular, Mixer ( Concrete Small Used In Culvert ) , Mason Class I ( With Tools ) , Mason Class Ii ( With Tools ) , Casurina Poles 100 - 150 Mm, Add Handling , Loading And Unloading At 1% On Material, Add Sundries Charges At 2 % On Material, Tmt Bars Fe 500, Binding Wire, Ms Pipes Of 80 Mm To 100 Mm Dia, Rms Gusset Plate, Corbon Electrodes, Welder Grade I, Hom Of Welding And Grinding Machine, Add, Mechanic Class Ii / Mechanic Hmp Grade I / Eme Grade, Hom Of Cutting And Grinding Machine, Tools And Plants @2% On Material, Unit Cost As Per The Specification, Plasticizer / Super Plasticizer, Hom Of Vibrator 0.71 Days, Solid Concrete Blocks ( 40 X 20 X 20 Cms ) -4.00 N / Sqmm, Jungle Wood Runners And Planks, Silver Oak Or Equivalent Planks 38 Mm Thick, Add Handling , Loading And Unloading At 2% On Material, Casurina Poles 75 - 100 Mm Dia, Vitrified Tiles 600X600 Mm, High Bond Tile Adhesive For Vitrified Tiles, Adhesive For Joints, Colour Glazed Tiles 30X60 Cms 6Mm Thick, Border Tiles 30 X 10 Cms, Add White Cement For Pointing At 2% On Material, Add Watering Charges At 1 % On Labour, Honnewood Planks For Panels 20 Mm Thick, Add Cutting And Other Wastage 5%, Carpenter Assistant, Hom Of Machinaries For Planing, M.S Rods, Ms Flat, Fitter Class I, Add Hom Of Welding And Grinding Machine @ 4% On Material, Ready Mix Primer Paint ( Ready Mix Red Lead Paint ) , Add Wire Brush, Fine Steel Wool, Putty, Sand Paper, At 3% On Cost Of Paint, Painter Class I, Add Providing And Removing Scaffolding At 3% On Labour, Enamel Metal Paint, Add Brush At 1% On Cost Of Paint, Honne Wood, 5Mm Pvc Sheet, Ms Tube, Solvent Cement Adhesive, Add Tools Transportation And Machinaries 1% On Material, Paint Remover, Blow Lamp, Brushes, Shrubs, Turpentine Oil, Putty At 5% On Paint Removal Cost., Aluminium Window Frame Section 1.20 Mm Thick, Nylon Rollers, Rubber Beading For Shutters Beading, Pvc Beading, Alluminium Tower Bolt - 20 Cm, Alluminium Handles - 15 Mm, Cleat Angles, Chrominum Plated Screws, 5.50 Mm Thick Plain Glass, Add 15% Wastage For Glass, Fabricator, Add Hom Of Welding And Grinding Machine @ 2% On Material, Add Sundries Charges At 1 % On Labour, Distemper Primer, Add Brush, Putty At 5% On Cost Of Distemper Primer, Plastic Emulsion Paint, Add Brush, Putty, Sand Paper, Roller At 5% On Cost Of Paint, Water Proofing Cement Paint, Add Brush, Putty, Sand Paper At 2% On Cost Of Paint, Polyenthylene Water Storage Tank Of Specified Capacity L, Labour Charges For Lifting And Placing In Position And Making Connection At 7% On Material, Handling Loading And Unloading 3% On Material, 50 Mm Dia Ms Hollow Pipe B Class 14 Gauge, 20 Mm X20mm Vertical M.S Square Rod, 12X12 M.S Square Rod, Anticorrosive Bitumastic Paint, Hom Of Cutting And Grinding Machine1, Transportation Loading And Unloading @1% On Material