Tender For Eos To 3 Nos Improve Estimate For Replace Damage Pole Various Distn 1 No Improve For Low Voltage Erection Of 2 Nos 25Kva And 1No 16 Kva 2 Nos Lt Line Dcw 1No Addl Load 1No Flori And 2Nos Agl Rsfs Service In Respect Of Ae Madavalam Kand
Tender Overview
Project Description
Tender For Eos To 3 Nos Improve Estimate For Replace Damage Pole Various Distn 1 No Improve For Low Voltage Erection Of 2 Nos 25Kva And 1No 16 Kva 2 Nos Lt Line Dcw 1No Addl Load 1No Flori And 2Nos Agl Rsfs Service In Respect Of Ae Madavalam Kandili
BOQ
| Sl. No. | Item Description |
| 1 | Excavation of Pole Pits/Stay Set: |
| 2 | For pole upto 8.0m length by using JCB/Manual |
| 3 | For pole above 8.0m length by using JCB/Manual |
| 4 | Excavation of Stay pit of 4.5\" to 5\" depth using JCB/Manual |
| 5 | Erection of Poles and Accessories |
| 6 | Erection of RCC, REC, PSC poles upto 8.00m length by using JCB/Manual |
| 7 | Erection of RCC, REC, PSC poles above 8.00m length by using JCB/Manual |
| 8 | Erection of stay set complete with fixing up stay wire Eye, Bow,Guy Shackle, Binding etc. |
| 9 | Fixing of line materials |
| 10 | Fixing of HT VCross arms3 1/2, 4 1/2 & 5 feet, Tapping cross arm & Garding cross arm |
| 11 | Fixing of LT 3 Phase cross arm |
| 12 | Fixing of LT single Phase cross arm |
| 13 | Fixing of HT / LTTI Fitting |
| 14 | Fixing of HT Pin Insulators (11/22/33KV) |
| 15 | Fixing of LT pin insulators |
| 16 | Fixing of HT 11KV stain disc |
| 17 | Fixing of LT Shackle |
| 18 | Fixing of Aluminium knob |
| 19 | Paving and Stringing of conductor |
| 20 | Paving and stringing of conductors of sizes upto 7/2.59 mm ACSR or other equivalent conductor |
| 21 | Paving and stringing of conductors of sizes above 7/2.59 mm ACSR or other equivalent conductor upto 7/3.35mm ACSR |
| 22 | Erection of Distribution Transformers: |
| 23 | Erection of 11KV Single pole structure including erection of DT complete without centre support |
| 24 | Concreting Works |
| 25 | Concreting with 1:4:8 mix using 40mm jelly including curing (material +labour) mass concreting of poles |
| 26 | Earthing |
| 27 | Earthing of poles with GI wires 4 or 6 SWG by coil earthing |
| 28 | Loading/Unloading Charges |
| 29 | Loading of DT upto 100KVA |
| 30 | Unloading of DT upto 100KVA |
| 31 | Loading of various size of REC, RCC,PSC Poles upto 8.0m length |
| 32 | Loading of various size of REC, RCC,PSC Poles above 8.0m length |
| 33 | Unloading of various size of REC, RCC,PSC Poles upto 8.0m length |
| 34 | Unloading of various size of REC, RCC,PSC Poles above 8.0m length |
| 35 | Loading of conductor |
| 36 | Unloading of conductor |
| 37 | Loading of line material |
| 38 | Unloading of line material |
| 39 | Loading of 11 KV strain disc |
| 40 | Unloading of 11 KV strain disc |
| 41 | Loading of LT Pin insulator shackle, guy shackle, LT Pin, Metal parts, HT pin etc., |
| 42 | Unloading of LT Pin insulator shackle, guy shackle, LT Pin, Metal parts, HT pin etc., |
| 43 | Transportation charges |
| 44 | Transportation of all type of poles by bullock cart or other vehicle (for all sizes of poles including loading and unloading) upto 5 KM |
| 45 | Transporting of conductors of all size from road side to pit locations upto 1 KM of conductor |
| 46 | Transporting of Distribution Transformer / Line materials from stores to office/ site upto 10KM distance by engaging 1 ton capacity Minidor(lorry) |
| 47 | Dismandling of Line Materials |
| 48 | Dismandling of RCC, REC, PSC & Metal poles of all sizes including the closing of pit |
| 49 | Dismandling of Conductor upto 7/3.35 inculding transporting to the nearsest road and stocking in coils |
| 50 | Dismandling of Cross arm clamps, TI fittings hardwares, insulators etc. |
| 51 | WORKSHOP CHARGES :- |
| 52 | Manufacturing/ Altering of clamps |
| 53 | Drilling of holes in the structure materials clamps etc. |
| 54 | AB switch or open type side arm stud, cutting and drilling holes. |
| 55 | Manufacturing of earth pipe clamps for structure including of drilling holes and welding and clamp with earth pipe |
| 56 | GENERAL |
| 57 | Jungle Clearance such as Kattu Karuvel in the various area without uprooting of Tree brances of coconut tree |
| 58 | Jungle Clearance such as Kattu Karuvel in the various area with uprooting of Tree brances of coconut tree |
| 59 | Clearing of Tree brances of coconut tree |
| 60 | Leveling of Ground using Bul Dozer |
| 61 | Cleaaring of Branches/ Trees with JCB |
| 62 | E.P.F. @13 % should be Entered by the Bidder |
| 63 | E.S.I. @3.25 % should be Entered by the Bidder |
| 64 | G.S.T. @18% should be Entered by the Bidder |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender