Releasing Connection To M / S. Arya Agro India Products C / O Shri Pranav Arya In Area Of Edd-I Hapur, hapur-Uttar Pradesh

Paschimanchal Vidyut Vitran Nigam Limited has published Releasing Connection To M / S. Arya Agro India Products C / O Shri Pranav Arya In Area Of Edd-I Hapur. Submission Date for this Tender is 15-03-2023. Electrification Work Tenders in hapur Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

36743132
Releasing Connection To M / S. Arya Agro India Products C / O Shri Pranav Arya In Area Of Edd-I Hapur
Open Tender
Indian
Uttar Pradesh
hapur
15-03-2023

Tender Details

Releasing Connection To M / S. Arya Agro India Products C / O Shri Pranav Arya In Area Of Edd-I Hapur

Key Value

Document Fees
INR 3540 /-
EMD
INR 18000.0 /-
Tender Value
Refer document

BOQ Items

Name of Work: FORRELEASING 600KVA CONNECTION TO M/S. ARYA AGRO INDIA PRODUCTSC/O SHRI. PRANAV ARYA, IN DEPOSIT SCHEME, IN THE JURISDICTION OF EDD-I HAPUR, UNDER EDC., HAPUR.
Sl. No. Item Description
1FORRELEASING 600KVA CONNECTION TO M/S. ARYA AGRO INDIA PRODUCTSC/O SHRI. PRANAV ARYA, IN DEPOSIT SCHEME, IN THE JURISDICTION OF EDD-I HAPUR, UNDER EDC., HAPUR. (All work will be completed as per sanctioned estimate).
2Carriage of line material (like Jointing Kit, clamps, nuts, bolts, channel, M.S. angle, ACSR Conductor etc.) from Electricity Store Center, Hapur to site of work with loading and unloading at both ends on Kachha Packka road.
3Carriage of ST Pole 11 mtrs. Long from Electricity store center, Hapur/J.E. Store to site of work with loading and unloading at both ends on Kachha Packka road.
4Carriage of 11KV XLPE Cable 3x120sqmm, from Electricity store center, Hapur to site of work with loading and unloading at both ends on Kachha Packka road.
5Carriage of 11KV CT/PT Unit from Electricity store center, Hapur to site of work with loading and unloading at both ends on Kachha Packka road.
6Carriage of 11KV VCB from Electricity store center, Hapur to site of work with loading and unloading at both ends on Kachha Packka road.
7Carriage of Metering Cubical Set Complete, from Electricity store center, Hapur to site of work with loading and unloading at both ends on Kachha Packka road.
8Erection & Fixing of STP Pole 11 mtr. longin 11 KV line after digging of suitable pits including fixing of requisite accessories as per RESPO Drawing/Norms by providing F-Bracket made of M.S. Flat of size 50x6 mm, Cross Arm holding Clamps made of M.S. Flat of size 50x6 mm with proper size nuts and bolts.
9Fabrication, erection and fixing of double pole on ST Pole 11 mtr. long with fixing of M.S. Top & Dropper Channel, M.S. S/S Angle, E-Bracket, 11 KV Pin insulator with Pin,Disc Insulator with Disc fitting as per RESPO Drawing/Norms by providing topand dropper clamps made of M.S. Flat of size 50x6 mm with proper size nuts and bolts.
10Mounting, Placing and connecting from LT/HT side of 11KV, CT/PT Units as per RESPO Norms.
11Making and filling of 11KV Cable Jointing Kit 3x120Sqmm, after duly plumbing and taping of suitable XLPE Cable, providing, fixing and crimping of proper size good quality lugs, including cost of lugs and tape etc., as per RESPO Norms.
12Installation and erection of 11KV Metering Cubical Complete work as per RESPO Norms.
13Installation and erection of 11KV VCB Complete work as per RESPO Norms.
14Grouting & fixing of stay rods (20x1800)mm including all work of excavation, cement concrete in size (0.60x0.60x0.30)m in ratio 1:4:8 cement, sand, 40mm brick ballast as per drg. Including back filling, proper ramming etc and fixing tightening & nozzling of stay wire with stay rod with the poles of required tension as per drawing as per RESPO Drawing/Norms by providing all grouting material and stay clamp made of M.S. Flat of size 50x6mm with proper size bolts & nuts & loops.
15Earthing of supports with MS earth Rod of (20x2500)mm long including excavation of pit and driving M.S. Rod 3.0 M apart from support and 0.5m below the ground level and connection below the earth electrodes with the help of G.I. wire & earthing lugs as per RESPO Drawing/Norms by providing proper size nuts & bolts.
16Grouting of ST supports in CC 1:4:8 (Cement, sand & 40mm brick ballast) Grouting will be done in the block of size (450x450)mm x1/6th of full length of the support, up to ground level, 300mm plinth above the ground level with CC 1:3:6 (Cement, core sand and Stone grit) with mufting as per drawing, work includes back filling & proper ramming by providing all required grouting materials.
17Laying , Stringing and final sagging of ACSR Weasel Conductor after binding from Insulator, as per RESPO/Drawing Norms.
18Providing & Fixing of G.I. pipe 6"dia Class-B over 11KV 3X70 and 3x120Sq.mm XLPE cable before mounting the cable at double pole. The work includes fitting of clamps, sealing of top and bottom of pipe and one end of pipe is to be burried under earth about 500mm earch including mounting and clamping the cable on double pole structure and making connection with overhead line at both ends.
19Laying of 140mm O/D PN-4PE-80 grade UV stabilized HDPE pipe as per IS 4980 of 6meter, for laying of underground 11KV XLPE Cable as per RESPO/Norms, including cost of above HDPE pipe.
20Laying of 11KV XLPE Cable 3x120Sqmm undergound (Double Circuit, 480x2=960mtrs.) into HDPE Pipe, spare cable shall be left in the loop shape at both ends as per RESPO/Norms.
21Laying of 11KV XLPE Cable 3x120Sqmm., for every Double pole and work site required, completion of work properly as per RESPO/Norms.
22Erection & Fixing of Marking Stone and completion of proper work as per RESPO/Norms, including cost of Marking stone.
23Road restoration charge for pucka road crossing as per RESPO/Drawing Norms.
24Road restoration charge for foothpath side as per RESPO/Drawing Norms.
25Dismantling & Removal of old & used CT/PT Unit and opening of all accessories.
26Carriage of old & used CT/PT Unit from site of work to Electricity store center, Hapur with loading and unloading at both ends on Kachha Packka road.
27Erection & fixing of Chemical earthing as per RESPO Norms and proper completion work complete (according to sanctioned estimate concerned).
28Jumpering work properly as per RESPO/Norms.
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail