|
| 1 | Painter Class I |
| 2 | Coarse sand (zone III) |
| 3 | Silver oak or equivalent planks 38 mm thick |
| 4 | Bond stone 20 x 20 x 45 cm |
| 5 | Plastic emulsion paint |
| 6 | Add sundries charges at 2 % on Material |
| 7 | Gravel 2.36 mm/Murrum |
| 8 | Add Brush, putty, sand paper at 2% on cost of paint |
| 9 | Jungle wood runners and planks |
| 10 | Broken stone aggregate 20 mm size |
| 11 | water proofing cement paint |
| 12 | 60 x 60 x 10 Guage sq. plate washer |
| 13 | Casurina poles 100 - 150 mm |
| 14 | HOM of Vibrator 0.71 days |
| 15 | Boulders |
| 16 | Mason Class I (with tools) |
| 17 | Add Handling , loading and unloading at 1% on Material |
| 18 | Mixer (concrete) - 1 cum Capacity |
| 19 | Add Brush at 1% on cost of paint |
| 20 | 20 mm dia hold fast rod |
| 21 | Binding wire |
| 22 | Add Handling , loading and unloading at 2% on Material |
| 23 | Portland Cement |
| 24 | Welding Charges @ 10% on Material |
| 25 | 38 mm dia of 14 guage MS Black pipe |
| 26 | Add sundries charges at 1 % on Material |
| 27 | Add watering charges at 1 % on Material |
| 28 | Casurina Poles 75 - 100 mm dia |
| 29 | Mason Class II (with tools) |
| 30 | Plasticizer / super plasticizer |
| 31 | Add |
| 32 | Transportation/loading and unloading of material/lifting of material /Wastage/Unforeseen charges/Miscellaneous which are necessary during execution. |
| 33 | M.S. Angles 65 x 65 x 6 mm 34.7 kgs |
| 34 | Stone Chistler Class II |
| 35 | 15 mm Bolt |
| 36 | Fitter Class I |
| 37 | Granite/trap broken metal 100 mm and down size |
| 38 | Aluminium paint |
| 39 | Add providing and removing scaffolding at 3% on Labour |
| 40 | Size stone 20 x 20 x 25 cms |
| 41 | Add Brush, putty, sand paper, roller at 5% on cost of paint |
| 42 | Broken stone aggregate 12 mm to 10 mm size |
| 43 | Broken stone aggregate 40 mm size |
| 44 | TMT bars Fe 500 |
| 45 | Mixer (concrete small used in culvert) |
| 46 | Wire mesh 50mm x 50mm |