Bids Are Invited For 30Kva Rotary Converter 2 A Cost Of Obs(List Of Obs Attached) 3 B Supervisory Charges For Installation , Fitment Of Equipment And Laying Of Cables Will Be Undertaken By Nd(V) Under Guidance Of /Stage Of Inspection By Oem For Ship Set
Tender Overview
Project Description
Bids Are Invited For 30Kva Rotary Converter 2 A Cost Of Obs ( List Of Obs Attached ) 3 B Supervisory Charges For Installation , Fitment Of Equipment And Laying Of Cables Will Be Undertaken By Nd ( V ) Under Guidance Of / Stage Of Inspection By Oem For Ship Set ( I ) 4 C Supervisory Charges For Installation , Fitment Of Equipment And Laying Of Cables Will Be Undertaken By Nd ( V ) Under Guidance Of / Stage Of Inspection By Oem For Ship Set ( Ii ) 5 D Supervisory Charges For Installation , Fitment Of Equipment And Laying Of Cables Will Be Undertaken By Nd ( V ) Under Guidance Of / Stage Of Inspection By Oem For Ship Set ( Iii ) 6 E Stw / Trails And Operational Checks Setting To Work And Trails Charges For Ship Set ( I ) 7 F Stw / Trails And Operational Checks Setting To Work And Trails Charges For Ship Set ( Ii ) 8 G Stw / Trails And Operational Checks Setting To Work And Trails Charges For Ship Set ( Iii ) 9 H Accessories For Connectors, Lugs, Nuts And Bolts For Concretization Charges For Ship Set ( I ) 10 J Accessories For Connectors, Lugs, Nuts And Bolts For Concretization Charges For Ship Set ( Ii ) 11 K Accessories For Connectors, Lugs, Nuts And Bolts For Concretization Charges For Ship Set ( Iii ) 12 L Documentation Charges Overall Block Diagram And Electrical Interconnect Schematics Of The System And Operation And Maintenance Manual Charges For Ship Set ( I ) 13 M Documentation Charges Overall Block Diagram And Electrical Interconnect Schematics Of The System And Operation And Maintenance Manual Charges For Ship Set ( Ii ) 14 N Documentation Charges Overall Block Diagram And Electrical Interconnect Schematics Of The System And Operation And Maintenance Manual Charges For Ship Set ( Iii ) 15 P Training For Ship Staff On Maintenance And Operational Aspects Required Will Be Paid On Submission Of Uac From Ships Staff For Ship Set ( I ) 16 Q Training For Ship Staff On Maintenance And Operational Aspects Required Will Be Paid On Submission Of Uac From Ships Staff For Ship Set ( Ii ) 17 R Training For Ship Staff On Maintenance And Operational Aspects Required Will Be Paid On Submission Of Uac From Ships Staff For Ship Set ( Iii ) 18 S Type Testing Charges 19 T Any Other Charges If Any
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 30-Mar-2023 | 12-Apr-2023 | ||
| 2 | 13-Apr-2023 | 29-Apr-2023 |
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | EE6025V-30KVA-ROTARY-CONVERTER | 30KVA ROTARY CONVERTER(LIST OF BOM ATTACHED) |
| 2 | A | COST OF OBS(LIST OF OBS ATTACHED) |
| 3 | B | SUPERVISORY CHARGES FOR INSTALLATION , FITMENT OF EQUIPMENT AND LAYING OF CABLES WILL BE UNDERTAKEN BY ND(V) UNDER GUIDANCE OF /STAGE OF INSPECTION BY OEM FOR SHIP SET (I) |
| 4 | C | SUPERVISORY CHARGES FOR INSTALLATION , FITMENT OF EQUIPMENT AND LAYING OF CABLES WILL BE UNDERTAKEN BY ND(V) UNDER GUIDANCE OF /STAGE OF INSPECTION BY OEM FOR SHIP SET (II) |
| 5 | D | SUPERVISORY CHARGES FOR INSTALLATION , FITMENT OF EQUIPMENT AND LAYING OF CABLES WILL BE UNDERTAKEN BY ND(V) UNDER GUIDANCE OF /STAGE OF INSPECTION BY OEM FOR SHIP SET (III) |
| 6 | E | STW/TRAILS AND OPERATIONAL CHECKS SETTING TO WORK AND TRAILS CHARGES FOR SHIP SET (I) |
| 7 | F | STW/TRAILS AND OPERATIONAL CHECKS SETTING TO WORK AND TRAILS CHARGES FOR SHIP SET (II) |
| 8 | G | STW/TRAILS AND OPERATIONAL CHECKS SETTING TO WORK AND TRAILS CHARGES FOR SHIP SET (III) |
| 9 | H | ACCESSORIES FOR CONNECTORS, LUGS, NUTS AND BOLTS FOR CONCRETIZATION CHARGES FOR SHIP SET(I) |
| 10 | J | ACCESSORIES FOR CONNECTORS, LUGS, NUTS AND BOLTS FOR CONCRETIZATION CHARGES FOR SHIP SET(II) |
| 11 | K | ACCESSORIES FOR CONNECTORS, LUGS, NUTS AND BOLTS FOR CONCRETIZATION CHARGES FOR SHIP SET(III) |
| 12 | L | DOCUMENTATION CHARGES OVERALL BLOCK DIAGRAM AND ELECTRICAL INTERCONNECT SCHEMATICS OF THE SYSTEM AND OPERATION AND MAINTENANCE MANUAL CHARGES FOR SHIP SET (I) |
| 13 | M | DOCUMENTATION CHARGES OVERALL BLOCK DIAGRAM AND ELECTRICAL INTERCONNECT SCHEMATICS OF THE SYSTEM AND OPERATION AND MAINTENANCE MANUAL CHARGES FOR SHIP SET (II) |
| 14 | N | DOCUMENTATION CHARGES OVERALL BLOCK DIAGRAM AND ELECTRICAL INTERCONNECT SCHEMATICS OF THE SYSTEM AND OPERATION AND MAINTENANCE MANUAL CHARGES FOR SHIP SET (III) |
| 15 | P | TRAINING FOR SHIP STAFF ON MAINTENANCE AND OPERATIONAL ASPECTS REQUIRED WILL BE PAID ON SUBMISSION OF UAC FROM SHIPS STAFF FOR SHIP SET (I) |
| 16 | Q | TRAINING FOR SHIP STAFF ON MAINTENANCE AND OPERATIONAL ASPECTS REQUIRED WILL BE PAID ON SUBMISSION OF UAC FROM SHIPS STAFF FOR SHIP SET (II) |
| 17 | R | TRAINING FOR SHIP STAFF ON MAINTENANCE AND OPERATIONAL ASPECTS REQUIRED WILL BE PAID ON SUBMISSION OF UAC FROM SHIPS STAFF FOR SHIP SET (III) |
| 18 | S | TYPE TESTING CHARGES |
| 19 | T | ANY OTHER CHARGES IF ANY |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-2 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender