Bids Are Invited For 30Kva Rotary Converter 2 A Cost Of Obs(List Of Obs Attached) 3 B Supervisory Charges For Installation , Fitment Of Equipment And Laying Of Cables Will Be Undertaken By Nd(V) Under Guidance Of /Stage Of Inspection By Oem For Ship Set
Tender Overview
Project Description
Bids Are Invited For 30Kva Rotary Converter 2 A Cost Of Obs ( List Of Obs Attached ) 3 B Supervisory Charges For Installation , Fitment Of Equipment And Laying Of Cables Will Be Undertaken By Nd ( V ) Under Guidance Of / Stage Of Inspection By Oem For Ship Set ( I ) 4 C Supervisory Charges For Installation , Fitment Of Equipment And Laying Of Cables Will Be Undertaken By Nd ( V ) Under Guidance Of / Stage Of Inspection By Oem For Ship Set ( Ii ) 5 D Supervisory Charges For Installation , Fitment Of Equipment And Laying Of Cables Will Be Undertaken By Nd ( V ) Under Guidance Of / Stage Of Inspection By Oem For Ship Set ( Iii ) 6 E Stw / Trails And Operational Checks Setting To Work And Trails Charges For Ship Set ( I ) 7 F Stw / Trails And Operational Checks Setting To Work And Trails Charges For Ship Set ( Ii ) 8 G Stw / Trails And Operational Checks Setting To Work And Trails Charges For Ship Set ( Iii ) 9 H Accessories For Connectors, Lugs, Nuts And Bolts For Concretization Charges For Ship Set ( I ) 10 J Accessories For Connectors, Lugs, Nuts And Bolts For Concretization Charges For Ship Set ( Ii ) 11 K Accessories For Connectors, Lugs, Nuts And Bolts For Concretization Charges For Ship Set ( Iii ) 12 L Documentation Charges Overall Block Diagram And Electrical Interconnect Schematics Of The System And Operation And Maintenance Manual Charges For Ship Set ( I ) 13 M Documentation Charges Overall Block Diagram And Electrical Interconnect Schematics Of The System And Operation And Maintenance Manual Charges For Ship Set ( Ii ) 14 N Documentation Charges Overall Block Diagram And Electrical Interconnect Schematics Of The System And Operation And Maintenance Manual Charges For Ship Set ( Iii ) 15 P Training For Ship Staff On Maintenance And Operational Aspects Required Will Be Paid On Submission Of Uac From Ships Staff For Ship Set ( I ) 16 Q Training For Ship Staff On Maintenance And Operational Aspects Required Will Be Paid On Submission Of Uac From Ships Staff For Ship Set ( Ii ) 17 R Training For Ship Staff On Maintenance And Operational Aspects Required Will Be Paid On Submission Of Uac From Ships Staff For Ship Set ( Iii ) 18 S Type Testing Charges 19 T Any Other Charges If Any
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 30-Mar-2023 | 12-Apr-2023 | ||
| 2 | 13-Apr-2023 | 29-Apr-2023 |
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | EE6025V-30KVA-ROTARY-CONVERTER | 30KVA ROTARY CONVERTER(LIST OF BOM ATTACHED) |
| 2 | A | COST OF OBS(LIST OF OBS ATTACHED) |
| 3 | B | SUPERVISORY CHARGES FOR INSTALLATION , FITMENT OF EQUIPMENT AND LAYING OF CABLES WILL BE UNDERTAKEN BY ND(V) UNDER GUIDANCE OF /STAGE OF INSPECTION BY OEM FOR SHIP SET (I) |
| 4 | C | SUPERVISORY CHARGES FOR INSTALLATION , FITMENT OF EQUIPMENT AND LAYING OF CABLES WILL BE UNDERTAKEN BY ND(V) UNDER GUIDANCE OF /STAGE OF INSPECTION BY OEM FOR SHIP SET (II) |
| 5 | D | SUPERVISORY CHARGES FOR INSTALLATION , FITMENT OF EQUIPMENT AND LAYING OF CABLES WILL BE UNDERTAKEN BY ND(V) UNDER GUIDANCE OF /STAGE OF INSPECTION BY OEM FOR SHIP SET (III) |
| 6 | E | STW/TRAILS AND OPERATIONAL CHECKS SETTING TO WORK AND TRAILS CHARGES FOR SHIP SET (I) |
| 7 | F | STW/TRAILS AND OPERATIONAL CHECKS SETTING TO WORK AND TRAILS CHARGES FOR SHIP SET (II) |
| 8 | G | STW/TRAILS AND OPERATIONAL CHECKS SETTING TO WORK AND TRAILS CHARGES FOR SHIP SET (III) |
| 9 | H | ACCESSORIES FOR CONNECTORS, LUGS, NUTS AND BOLTS FOR CONCRETIZATION CHARGES FOR SHIP SET(I) |
| 10 | J | ACCESSORIES FOR CONNECTORS, LUGS, NUTS AND BOLTS FOR CONCRETIZATION CHARGES FOR SHIP SET(II) |
| 11 | K | ACCESSORIES FOR CONNECTORS, LUGS, NUTS AND BOLTS FOR CONCRETIZATION CHARGES FOR SHIP SET(III) |
| 12 | L | DOCUMENTATION CHARGES OVERALL BLOCK DIAGRAM AND ELECTRICAL INTERCONNECT SCHEMATICS OF THE SYSTEM AND OPERATION AND MAINTENANCE MANUAL CHARGES FOR SHIP SET (I) |
| 13 | M | DOCUMENTATION CHARGES OVERALL BLOCK DIAGRAM AND ELECTRICAL INTERCONNECT SCHEMATICS OF THE SYSTEM AND OPERATION AND MAINTENANCE MANUAL CHARGES FOR SHIP SET (II) |
| 14 | N | DOCUMENTATION CHARGES OVERALL BLOCK DIAGRAM AND ELECTRICAL INTERCONNECT SCHEMATICS OF THE SYSTEM AND OPERATION AND MAINTENANCE MANUAL CHARGES FOR SHIP SET (III) |
| 15 | P | TRAINING FOR SHIP STAFF ON MAINTENANCE AND OPERATIONAL ASPECTS REQUIRED WILL BE PAID ON SUBMISSION OF UAC FROM SHIPS STAFF FOR SHIP SET (I) |
| 16 | Q | TRAINING FOR SHIP STAFF ON MAINTENANCE AND OPERATIONAL ASPECTS REQUIRED WILL BE PAID ON SUBMISSION OF UAC FROM SHIPS STAFF FOR SHIP SET (II) |
| 17 | R | TRAINING FOR SHIP STAFF ON MAINTENANCE AND OPERATIONAL ASPECTS REQUIRED WILL BE PAID ON SUBMISSION OF UAC FROM SHIPS STAFF FOR SHIP SET (III) |
| 18 | S | TYPE TESTING CHARGES |
| 19 | T | ANY OTHER CHARGES IF ANY |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-2 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
Completed