}

Appointment Of Advanced Metering Infrastructure (Ami) Service Provider For 37 Lakh Prepaid Smart Meters In Kerala State Electricity Board Limited (Ksebl) On Dbfoot Basis Under Totex Mode As Part Of Rdss, kerala-Gujarat

Telecommunications Consultants India Limited-TCIL has published Appointment Of Advanced Metering Infrastructure (Ami) Service Provider For 37 Lakh Prepaid Smart Meters In Kerala State Electricity Board Limited (Ksebl) On Dbfoot Basis Under Totex Mode As Part Of Rdss. Submission Date for this Tender is 17-03-2023. Infrastructure Work Tenders in kerala Gujarat. Bidders can get complete Tender details and download the document.




Tender Notice

36717695
Appointment Of Advanced Metering Infrastructure (Ami) Service Provider For 37 Lakh Prepaid Smart Meters In Kerala State Electricity Board Limited (Ksebl) On Dbfoot Basis Under Totex Mode As Part Of Rdss
Open Tender
Indian
Gujarat
kerala
17-03-2023

Tender Details

Appointment Of Advanced Metering Infrastructure ( Ami ) Service Provider For 37 Lakh Prepaid Smart Meters In Kerala State Electricity Board Limited ( Ksebl ) On Dbfoot Basis Under Totex Mode As Part Of Rdss

Key Value

Document Fees
INR 23600 /-
EMD
INR 500000.0 /-
Tender Value
Refer document

BOQ Items

Name of Work:Appointment of Advanced Metering Infrastructure (AMI) Service Provider for 37 lakh Prepaid Smart Meters in Kerala State Electricity Board Limited (KSEBL) on DBFOOT basis under TOTEX mode as part of RDSS.
Sl. No. Item Description
1Meters (each with related meter box, hardware, software and equipment)
2Single phase whole current Smart Meter (without Net-Metering) – Consumer Meter with Meter Box, Back-end IT Infra with associated works and requisite no. of polycarbonate seal
3Single phase whole current Smart Meter (with Net-Metering) – Consumer Meter with Meter Box and Back-end IT Infra with associated works and requisite no. of polycarbonate seal
4Three Phase whole current Smart Meter (without Net-Metering) – Consumer Meter with Meter Box and Back-end IT Infra with associated works and requisite no. of polycarbonate seal
5Three Phase whole current Smart Meter (with Net-Metering) Consumer Meter with Meter Box and Back-end IT Infra with associated works and requisite no. of polycarbonate seal
6Three phase LT-CT operated Smart Meter (without Net-Metering) – Consumer Meter with CTs, control cables, without DI provisions Meter Box and Back-end IT Infra with associated works and requisite no. of polycarbonate seal
7Three phase LT-CT operated Smart Meter (with Net-Metering) – Consumer meter with CTs, control cables, without DI provisions Meter Box and Back-end IT Infra with associated works and requisite no. of polycarbonate seal
8Three phase LT-CT operated Smart Meter (with Net-Metering) – DT Meter with CTs, control cables, with DI provisions Meter Box and Back-end IT Infra with associated works and requisite no. of polycarbonate seal
9Three phase CT/PT operated Smart Meter (with Net-Metering) – HT Consumer Meter with control cables, with DI provisions Meter Box and Back-end IT Infra with associated works and requisite no. of polycarbonate seal. (CT PT set to be arranged by utility)
10Three phase CT/PT operated Smart Meter (without Net-Metering) – HT Consumer Meter with control cables, with DI provisions Meter Box and Back-end IT Infra with associated works and requisite no. of polycarbonate seal. (CT PT set to be arranged by utility)
11Three phase operated CT/PT Smart Meter – Boundary Meter with, control cables, with DI provisions Meter Box and Back-end IT Infra with associated works and requisite no. of polycarbonate seal (CT PT set to be arranged by utility)
12Three phase CT/PT operated Smart Meter – Feeder Meter with, control cables, with DI provisions Meter Box and Back-end IT Infra with associated works and requisite no. of polycarbonate seal. (CT PT set to be arranged by utility)
13Single phase whole current Smart Meter (without Net-Metering and latch relay) with consumer Meter, meter Box and Back-end IT Infra with associated works and requisite no. of polycarbonate seal. (For solar consumer only - gross metering)
14Three phase whole current Smart Meter (without Net-Metering and latch relay) with consumer Meter, meter Box and Back-end IT Infra with associated works and requisite no. of polycarbonate seal. (For solar consumer only - gross metering)
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail