| 2 | Supervision by deploying minimum two supervisors (suitable experienced) for five nos. of t/wells for ensure smooth operation of t/wells through automation as per site requirements/direction of engineer incharge, ensuring proper chlorination of t/wells by checking the working of dosing pumps & refilling of hypochlorite solutions (to be provided by the department), visiting each t/well 1-2 times during operation timings & reporting of any problem to JE/AE concerned/Maintenance team, minor setting of equipment requiredfor smooth operation, switching to manual mode in case of automated system, not functioning properly.1. Opp. BL-57 (Inside Park) L-Block, Hari Nagar.2. Opp. A-9, (Inside Gym) Asha Park.3. Opp. G-177, (Inside Park) Hari Nagar4. Opp. CB-29 A, (Inside Park) Hari Nagar.5. 80 SFS Hari Nagar, T/Well-I.6. BE Block, Hari Nagar No. 3.7. B Block, near Shishu vatika, Hari Nagar.8. CC Block, Hari Nagar No. 3.9. B-114, Phase II, Mayapuri.10. E – Block, Hari Nagar (Near Shani Mandir).11. MS Block, Ekta Enclave, Hari Nagar.12. A Block JJC, Khajan Basti near Gurudwara.13. C-20 Block, JJC Khajan Basti.14. T-80 Block, JJC Khanjan Basti.15. D-Block, Khajan Basti, T/Well No-1., Maya Puri.16. D-Block, Khajan Basti, T/Well No-2, Maya Puri.17. D-Block, Khajan Basti, T/Well No-3.18. Near PNB, Nangal Raya.19. Khazan Basti, Kanchan Basti, Maya Puri, JJC, T/Well.20. Sneh Chhaya Centre Nangal Rai T/Well.21. WZ - 1220, Nangal Raya.22. Appartment Prataap Nagar.23. F-102, Rewari line Khajan Basti.24. Tehsildar Basti, Nangal Rai T/Well.Total no. of persons deployed: 10Period: 180 Days |