Tripura Power Generation Limited has published Tender For Engineering, Procurement And Construction For Installation Of 120 Mw Combined Cycle Gas Turbine Power Plant At Rokhia In Tripura, India. Submission Date for this Tender is 30-11-2023. Turbine Engines Tenders in tripura Tripura. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 24-Mar-2023 | Addendum1 | Date | 31-05-2023 |
2 | 10-Apr-2023 | Addendum-2 | Date | 15-06-2023 |
3 | 17-Apr-2023 | Addendum3 | Technical Bid | 15-06-2023 |
4 | 06-May-2023 | Addendum-4 | Date | 05-07-2023 |
5 | 17-May-2023 | Addendum-5 | Terms and Conditions | 05-07-2023 |
6 | 09-Jun-2023 | Revised schedule of bid activities | Date | 01-08-2023 |
7 | 28-Jun-2023 | Addendum8 | Other | 25-08-2023 |
8 | 28-Jun-2023 | Minutes of Pre Bid conference | Technical Bid | 25-08-2023 |
9 | 28-Jun-2023 | Addendum 7 | Date | 25-08-2023 |
10 | 06-Jul-2023 | Addendum9LotXVI | Other | 25-08-2023 |
11 | 06-Jul-2023 | Addendum9LotXV | Other | 25-08-2023 |
12 | 06-Jul-2023 | Addendum9LotXIV | Other | 25-08-2023 |
13 | 06-Jul-2023 | Addendum9LotXIII | Other | 25-08-2023 |
14 | 06-Jul-2023 | Addendum9LotXII | Other | 25-08-2023 |
15 | 06-Jul-2023 | Addendum9LotXI | Other | 25-08-2023 |
16 | 06-Jul-2023 | Addendum9LotX | Other | 25-08-2023 |
17 | 06-Jul-2023 | Addendum9LotIX | Other | 25-08-2023 |
18 | 06-Jul-2023 | Addendum9LotVIII | Other | 25-08-2023 |
19 | 06-Jul-2023 | Addendum9LotVII | Other | 25-08-2023 |
20 | 06-Jul-2023 | Addendum9LotVI | Other | 25-08-2023 |
21 | 06-Jul-2023 | Addendum9LotV | Other | 25-08-2023 |
22 | 06-Jul-2023 | Addendum9LotIV | Other | 25-08-2023 |
23 | 06-Jul-2023 | Addendum9LotIII | Other | 25-08-2023 |
24 | 06-Jul-2023 | Addendum9LotII | Other | 25-08-2023 |
25 | 06-Jul-2023 | Addendum9LotI | Other | 25-08-2023 |
26 | 06-Jul-2023 | Addendum9 | Other | 25-08-2023 |
27 | 06-Jul-2023 | Addendum9LotXVII | Other | 25-08-2023 |
28 | 23-Jul-2023 | Addendum 12 | Other | 25-08-2023 |
29 | 23-Jul-2023 | Addendum 11 | Other | 25-08-2023 |
30 | 24-Jul-2023 | Addendum 10 | Date | 20-09-2023 |
31 | 16-Aug-2023 | Addendum 13 | Date | 16-10-2023 |
32 | 29-Aug-2023 | Addendum 14 | Other | 16-10-2023 |
33 | 11-Sep-2023 | Addendum16 | Other | 16-10-2023 |
34 | 11-Sep-2023 | Addendum15 | Technical Bid | 16-10-2023 |
35 | 12-Sep-2023 | Addendum17 | Terms and Conditions | 16-10-2023 |
36 | 13-Sep-2023 | Addendum18 | Other | 16-10-2023 |
37 | 13-Sep-2023 | Addendum 19 | Technical Bid | 16-10-2023 |
38 | 15-Sep-2023 | Addendum21 | Technical Bid | 16-10-2023 |
39 | 15-Sep-2023 | Addendum20 | Terms and Conditions | 16-10-2023 |
40 | 15-Sep-2023 | Addendum22 | Other | 16-10-2023 |
41 | 18-Sep-2023 | Addendum24 | Technical Bid | 16-10-2023 |
42 | 18-Sep-2023 | Addendum23 | Technical Bid | 16-10-2023 |
43 | 18-Sep-2023 | Addendum 26 | Other | 16-10-2023 |
44 | 18-Sep-2023 | Addendum 25 | Technical Bid | 16-10-2023 |
45 | 09-Oct-2023 | Addendum27 | Date | 30-10-2023 |
46 | 17-Oct-2023 | Addendum 28 | Technical Bid | 30-10-2023 |
47 | 18-Oct-2023 | Addendum 29 | Date | 06-11-2023 |
48 | 02-Nov-2023 | Addendum30 | Date | 23-11-2023 |
49 | 21-Nov-2023 | Addendum31 | Date | 30-11-2023 |
50 | 28-Nov-2023 | Addendum 32 | Financial Bid | 30-11-2023 |
Sl. No. | Item Description |
1 | Mechanical |
2 | Gas turbine unit including all associated auxiliary systems, Generator & Generator Auxiliaries Including static frequency Converter for GT start-up |
3 | Heat recovery boiler including all associated auxiliary equipment |
4 | Steam Turbine unit including all associated auxiliary systems, Generator & Generator Auxiliaries |
5 | Air cooled condenser and vacuum raising equipment |
6 | Steam and feed cycle equipment including Condensate Extraction |
7 | Compressed air system |
8 | Auxiliary Cooling System: -ACW Pumps along with drives -Air cooled heat exchanger. -Complete piping including all valves, instruments etc -Total price ACW System |
9 | Plant water system including Bore well pumps, auxiliaries, piping, valves, pretreatment plant, reservoir etc. |
10 | Plant Water Pumps and piping system |
11 | Closed cycle cooling DM Water System |
12 | Fire protection system |
13 | Ventilation and Air Conditioning System |
14 | Fuel gas system including gas booster compressor |
15 | Demineralized plant, storage, laboratory equipmentand distribution system |
16 | Workshop Equipment |
17 | Any other item not included in the above but are required for completion of the plant as per Specification |
18 | Electrical |
19 | Generator Isolated Phase busduct for GTG including GCB Tap-off connections |
20 | Generator Isolated Phase busduct for STG |
21 | Generator Circuit breaker (GCB) for GTG |
22 | Generator Transformer for GTG Unit |
23 | Generator Transformer for STG |
24 | 132 KV substation equipment and accessories, interconnection with existing 132 KV switchyard including modification of existing 132 kV switchyard |
25 | Station Auxiliary Transformer (SAT) |
26 | Neutral Grounding Resistor (NGR) for SAT |
27 | 6600V Station Switchgear |
28 | LT Auxiliary Transformer |
29 | LT Busduct |
30 | 415V Switchgears |
31 | 415V Motor Control Centres& Distribution boards |
32 | D.C. System |
33 | Uninterruptible Power Supply system (UPS) |
34 | Protective Relay Panels for Generator GT & SAT |
35 | Emergency DG System |
36 | Emergency Gas Engine System |
37 | Plant Illumination System |
38 | Plant Intercommunication system |
39 | Plant Grounding and Lightning protection system |
40 | Cable trays and accessories |
41 | Power and control cables |
42 | Misc. Panels |
43 | Electric Laboratory Equipment |
44 | Any other item not included in the above but are required for completion of the plant as per Specification |
45 | Instrumentation & Control (I&C) |
46 | Measuring Instruments - Primary Instrumentation including all types of measuring elements, transmitters, switch devices, local indicators/gauges etc |
47 | Measuring instruments - Secondary Instrumentation including recorders, indicators, totalizers/ counters integrators, ammeters etc |
48 | Measuring instruments - Vibration Monitoring Systems |
49 | Distributed Control System for the main plant (HRSG, STG and their auxiliaries, BOP Systemetc.) |
50 | Central control room panels/desks/ consoles/local panels fully assembled and wired |
51 | Control valves with accessories |
52 | Steam and water Analysis system (SWAS) complete with coolers, chiller system, valves and analysers for various measuring parameters etc |
53 | Gas Analysis system complete with O2, CO, SOx, NOx analysers and continuous emission monitoring system |
54 | Instrumentation cables (including special cables, compensating cables, pre-fabricated cables) and other field construction material/devices for I&C |
55 | Process connection and piping/tubing including instrument valve, blow-down, valves, valve manifolds, fittings etc |
56 | Any other items not included in the preceeding items but willbe required for complete requirement of the plant as per Specification. |
57 | Special Tools and Tackles |
58 | Consumables and consumableSpare Parts |
59 | Mandatory Spare Parts as per Form OTH-1 |
60 | Others ( Bidders to list as applicable) |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail