Power Boards / Undertakings / PSU Closing in 0 days TDR #36623245

Construction Of 11 Kv And Lt Line For Jhalas From The Region Of Makrandapur Choraha, Makrandapur, Jaisahi Nagar, Madhwapur, Baesahi Nagar, Basae On 11 Kv Madhwapur Feeder At Dueria Ss Pilibhit Under Edd-Bisalpur.

Issued by Boards / Undertakings / PSU · bisalpur, Uttar Pradesh
Tender Value
7 Lakhs
Estimated cost
Bid Submission
13 Mar 2023
0 days left
EMD
7000
Bank guarantee accepted
Document Fee
1180
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
bisalpur → Uttar Pradesh
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Construction Of 11 Kv And Lt Line For Jhalas From The Region Of Makrandapur Choraha, Makrandapur, Jaisahi Nagar, Madhwapur, Baesahi Nagar, Basae On 11 Kv Madhwapur Feeder At Dueria Ss Pilibhit Under Edd-Bisalpur.

BOQ

Name of Work: For construction of 11 KV and LT line for Jhalas from the region of Makrandapur Choraha, Makrandapur, Jaisahi Nagar, Madhwapur, Baesahi Nagar, Basae on 11 KV Madhwapur feeder at Dueria S/S Pilibhit under EDD-Bisalpur.
Sl. No. Item Description
1Carriage of following line material for 11KV line from Store Centre to the site of work including measuring, weighing, loading, unloading at both ends and proper stacking at safe site
2STP 11Mtr. long
3PCC Pole 8.5Mtr. Long
411 KV Cross Arm Channel V type
511 KV Pin insulator
611 KV Pin with nut
711 KV Disc insulator
811 KV Disc fitting
9ACSR weaselconductor
10Cable LT ABC (3X50+1X35+1x16) sqmm
11G.I. wire 8 SWG
12Stay set complete
13Stay Set Complete LT
14Earthing complete
1511/0.4 KV 25 KVA Transformer
1611 KV TPMO
17Distribution Box three Phase with clamp
18Gaurding Angle 1.6mtr. Long
19M.S angle lron 65x65x6mm, 4300mm long @ 5.8 Kg/Mt (bracing)
20M.S.Channel 100X50X2240mm @ 9.6Kg/Mt. (Top channel & dropper)
21MS Channel 100x50x2028mm (Dropper for Fuse set)
22MS angle 75x75x6x2028 mm) with clamp & bolt and nut (T/F base)
23MS Channel 125x65x2240 (Top)
24MS Channel 125x65x1300mm Tee off
25E- bracket with bolt & nut
26F- bracket with bolt & nut
27Cross Arm holding clamp
28Alluminium Binding wire-6 SWG
2911 KV Fuse set
30Erection of the following supports including cutting, making holes, fixing of all types of accessories digging of pits complete in all respect, as per RESSPO drawing. All types of clamps, stone pad, nut, bolt washers would be provided by the contractor.
31Single support of S.T pole 11 mtr long for 11 kv line and road crossing
32Single support of PCC pole 8.5 mtr long.
33Double pole structure on PCC. Pole 8.5mtr long complete with bracing for sectional double pole
34Double pole structure on PCC. Pole 8.5mtr long complete with bracing for25 KVA T/F
35Concreting of supports at the time of erection of pole in 1:4:8 concrete ratio from bottom of pole to ground leveland plinthing of supports upto 300mm above ground level by using cement, sand & coarse aggregate in ratio 1:4:8 as per RESSPO drawing with watering/curing properly upto proper setting of plinthing. All matrial would be provided by the contractor.
36Erection of stay set with stay wire, stay clamp & stay insulator including with grouting of stay set by concrete of ratio 1:4:8 as per RESSPO norms before back fitting of the pits including binding, climbing, clamping, tightening and nozzeling of stay wire in all respect as per RESSPO norms. All clamps, nuts, bolts, stay insulator, cement. brick, ballast, sand etc would be provided by the contractor.
37Laying and sagging of 3 phase ACSR Weasel conductor from double pole at 33/11 KV substation to double pole at tapping point of 11 KV feeder line including jumpering, hoisting, fixing of all type of insulators, binding, jointing and its clamping etcin all respect.
38Laying ofLT ABC (3X50+1X35+1X16) sq.mm for 11 KVL.T Line.
39Earthing of each S.T Poles of the line is to be done by inserting the MS earth rod (1800x20mm) into soil by hammering and properly fastning with GI wire to each support by nut & bolt. Earthing rod must be 0.15Mtr.above from the plinth of the support. All type nut & bolt would be given by the contractor.
40Earthing of each PCC Poles of the line is to be done by inserting the MS earth rod (1800x20mm) into soil by hammering and properly fastning with GI wire to each support by nut & bolt. Earthing rod must be 0.15Mtr.above from the plinth of the support. All type nut & bolt would be given by the contractor.
41Guarding of HT/LT/Telephone Line/ Road/River Crossing etc. by providing G.S Earth wire 7/16 SWG/GI wire No. 8/10 and making net with difference of 1.00 Mtr. Completely including fixing of channel/angle etc. with proper locking at each support as per RESSPO norms. All type nut &bolts, would be given by the contractor.
42Fixing of 3 Phase distribution box on pole including proper clamping. All material would be provided by firm.
43Fixing of danger board and G.I barbed wire on each pole including proper clamping. All material would be provided by firm.
44Painting of Single pole structure of 11 mtr. ST Pole. of existing 11 KV line with one coat of red oxide primer and two coats of aluminium white paint of ISI mark and top danger portion of each support must be painted by providing two coat of Post Office Red Paint (1.5mtr upper portion of support.) Paint and material would be given by contractor to complete of work.
45mounting of transformers on double pole andlaying of cable jumpering and making all HT/LT connections complete work in all respect .
46Fixing of TPMO complete work in all respect.
47Clearing of the line route by cutting of tree branches during erection of line and also upto the time of energisation completely as per direction of site incharge.

AI Tender Summary

OUR REF NO 36623245
AUTHORITY Boards / Undertakings / PSU
TENDER VALUE 7 Lakhs
LAST DATE 13-03-2023
Authority
Authority Name Madhyanchal Vidut Vitran Nigam Limited
Work Description Construction Of 11 Kv And Lt Line For Jhalas From The Region Of Makrandapur Choraha, Makrandapur, Jaisahi Nagar, Madhwapur, Baesahi Nagar, Basae On 11 Kv Madhwapur Feeder At Dueria Ss Pilibhit Under Edd-Bisalpur.
Basic Detail
Tender No T-41/EDCP/2022-23
Bidding Type Tender
Location
City bisalpur
State Uttar Pradesh
Key Dates
Publish Date 03 Mar 2023
Submission Date 13 Mar 2023
Open Date 14 Mar 2023
Finance
Tender Value 7 Lakhs
Tender Fee 1180
EMD 7000
Exemption Not Available
Document List
99ad755f-1aac-4a7a-a846-ed6edb2959b3.html
BOQ_1293683.xls
form.pdf
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Mar 03, 2023
11:30 IST

Tender Published

Tender notice published.

Completed
Mar 13, 2023
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Mar 14, 2023

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

99ad755f-1aac-4a7a-a846-ed6edb2959b3.html

xls

BOQ_1293683.xls

pdf

form.pdf

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders