}

Tender For Construction Of Cc Pavements Under Sangram Sdo Hq. Township Road, Kurung Kumey District., Kurung Kumey-Arunachal Pradesh

Public Works Department-PWD has published Tender For Construction Of Cc Pavements Under Sangram Sdo Hq. Township Road, Kurung Kumey District.. Submission Date for this Tender is 10-03-2023. RCC Road Tenders in Kurung Kumey Arunachal Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

36572003
Corrigendum : Tender For Construction Of Cc Pavements Under Sangram Sdo Hq. Township Road, Kurung Kumey District.
Open Tender
Indian
Arunachal Pradesh
Kurung Kumey
10-03-2023

Tender Details

Construction Of Cc Pavements Under Sangram Sdo Hq. Township Road, Kurung Kumey District.

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 06-Mar-2023 Change in Technical Bid Opeining date Date 10-03-2023

Key Value

Document Fees
INR 5000 /-
EMD
INR 882564.0 /-
Tender Value
INR 8.82 Crore /-

BOQ Items

Name of Work: Construction of CC Pavements under Sangram SDO HQ. Township road, Kurung Kumey District.
Sl. No. Item Description
1SH:- Widening
2Excavation in Hill Area in Soil by Mechanical Means (Excavation in soil in hilly area by mechanical means including cutting and trimming of side slopes and disposing of excavated earth with all lifts and lead upto 1000 metres)
3Excavation in Hilly Area in Ordinary Rock by Mechanical Means not Requiring Blasting. (Excavation in hilly area in ordinary rock not requiring ballasting by mechanical means including cutting and trimming of slopes and disposal of cut material with all lift
4SH:- Sub Grade & GSB (Cost for 1.00 Km)
5Preparation of sub grade (Preparation of sub grade by excavating earth to an average depth of 22.50 cm, dressing to camber and consolidating with road roller, making good the undulations etc. and disposal of surplus earth, lead upto 50 m.)
6By Mix in Place Method (Construction of granular sub- base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401) (I) for grading- IMaterial
7SH:- CC Pavement (Cost for 4.200 Km)
8Dismantling of Flexible Pavements (Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately) a) By Manual Means
9Consolidation of sub-grade with road roller of 8 to 12 tonne capacity including making good the undulations etc. with earth or quarry spoils etc. and rerolling the sub grade.
10Centring and shuttering including strutting, propping etc and removal of form work for : b) Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc.
11Dry Lean Cement Concrete Sub- base (Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing.)
12125 Micron Plythene (Providing and fixing 125 micro polythine over sub-base)
13Cement Concrete Pavement (Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing ) Mix Design M35
14SH:- Cross Drainage (SH :- RCC Slab Culvert 1.00 m Span - 1.50m height=10 Nos)
15Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification,including setting out,construction of shoring and bracing,removal of stumps and other deleterious matter,dressing of sides and bottom and backfilling with approved material.) I. Ordinary soil A. Manual Means i) upto 3 m depth =
16PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed,placed in foundation and compacted by vibration including curing for 14 days.)
17Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications Coursed rubble masonry (first sort )
18Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications PCC Grade M20 Height upto 5m =
19Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification RCC Grade M20 Using Concrete Mixer For solid slab super-structure,20-30% of (a+b+c) Height upto 5m=
20Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications
21Back filling behind abutment,wing wall and return wall complete as per drawing and Technical specification a)Granular material
22Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment,wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications
23SH: R/Wall 4.00 Height=100.00 Mtre
24Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification,including setting out,construction of shoring and bracing,removal of stumps and other deleterious matter,dressing of sides and bottom and backfilling with approved material.) I. Ordinary soil A. Manual Means i) upto 3 m depth =
25PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed,placed in foundation and compacted by vibration including curing for 14 days.)
26Stone masonry work in cement mortar 1:3 in foundation complete as drawing and Technical Specification b) Random Rubble Masonry
27Dry rubble Flooring
28Back filling behind abutment,wing wall and return wall complete as per drawing and Technical specification a)Granular material
29SH: B/Wall 10.00m length & 3.80m height) = 194 Mtr.
30Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification,including setting out,construction of shoring and bracing,removal of stumps and other deleterious matter,dressing of sides and bottom and backfilling with approved material.) I. Ordinary soil A. Manual Means i) upto 3 m depth
31PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed,placed in foundation and compacted by vibration including curing for 14 days.)
32Stone masonry work in cement mortar 1:3 in foundation complete as drawing and Technical Specification b) Random Rubble Masonry
33Dry rubble Flooring
34Back filling behind abutment,wing wall and return wall complete as per drawing and Technical specification A. Granular material
35SH:-Cement Concrete Drain (4.200 KM)
36Earth work in excavation in foundation and trenches etc. in all kinds of soil (excluding soil containing 50% or more of shingle or small size boulders upto 30 cm size, saturated soil and rock), lift upto 1.50 m and stacking the excavated soil not more than 3 m clear from the edge of the excavation and returning the stacked soil in 15 cm layers, when required, into plinth sides offoundation etc consolidating each deposited layer by ramming and watering and then disposing of all surplus soil as directed within a lead of 50m.
37Providing and laying cement concrete 1 : 3 : 6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) excluding the cost of centring an shuttering in:a) Foundations and plinth
38Centering and shuttering including strutting , propping etc, and removal of form work for :b) Walls including attached buttresses, pilasters etc.
3912 mm Cement plaster in CM 1:4 (1 Cement : 4 Sand)
40Neat Cement Punning
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail