}

Tender For Annual Repair And Maintenance Of Mechanical Work Shop Sub Division At Bhatta Kuffe (Sh Construction Of Damaged Boundary Wall At Mechanical Work Shop Cub Division Bhatta Kuffer, shimla-Himachal Pradesh

Public Works Department-PWD has published Tender For Annual Repair And Maintenance Of Mechanical Work Shop Sub Division At Bhatta Kuffe (Sh Construction Of Damaged Boundary Wall At Mechanical Work Shop Cub Division Bhatta Kuffer. Submission Date for this Tender is 09-03-2023. Mechanical engineering Service Tenders in shimla Himachal Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

36559396
Tender For Annual Repair And Maintenance Of Mechanical Work Shop Sub Division At Bhatta Kuffe (Sh Construction Of Damaged Boundary Wall At Mechanical Work Shop Cub Division Bhatta Kuffer
Open Tender
Indian
Himachal Pradesh
shimla
09-03-2023

Tender Details

Annual Repair And Maintenance Of Mechanical Work Shop Sub Division At Bhatta Kuffe ( Sh construction of Damaged Boundary Wall At Mechanical Work Shop Cub Division Bhatta Kuffer

Key Value

Document Fees
INR 350 /-
EMD
INR 10500.0 /-
Tender Value
Refer document

BOQ Items

Name of Work: A/R & M/O Mechanical Work shop Sub-Divisionb at Bhatta kuffer (SH: C/O damaged Boundary Wall at Mechanical Work Shop Sub-Division Bhatta Kuffer)
Sl. No. Item Description
1Excavation in foundations, trenches etc., in earth work in all classificaion of soil such as pick work jumper work,pick jumper work, blasting work, jumper blasting work, soft and hard blasting and saturated soil, de-watering including wedging out rocks where blasting work is prohibited, chiseling or any other mixed variety of soil, de-watering and/or removal of slush and incidentals lift upto any heights, stacking the excavated soil not more than 3 mtrs (Three metres) clear from the edge of excavation and then returning the stacked soil in 15cm.(Fifteen centimeter) layers, when required into plinths, sides of foundation etc. consolidating each deposited layer by ramming, wateringand then disposing of all excavated earth as directed by the Engineer-in-Charge, within all leads, lifts of materials and other incidentals.
2Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802,803,1202 & 1203including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge. I. P.C.C. grade M 10(i) Nominal mix 1:3:6 (one cement :three sand:six graded)
3II. R.C.C. grade M 20(i) Nominal mix 1:2:4 (One cement :Two sand: Four graded)
4Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge.
5Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge.
615mm cement plaster in single coat on fair side of brick/concrete/stone walls for interior plastering upto floor two level including arrises,internal rounded angles,chamfers and/or rounded angles not exceeding 80mm in girth and finished even and smoothincluding carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge. (i) Cement mortar 1:4 (1 cement:4 sand).
7Fencing with angle iron post placed at required distance embedded in cement concrete blocks, every 15th post, last but one end post and corner post shell be strutted on both sides and end post on one side only and provided with horizontal lines and two diagonals interwoven with horizontal wires, of barbed wire weighing 9.38 kg per 100 m (minimum) between the two posts fitted and fixed with G.I. staples, turn buckles etc. complete. (Cost of posts, struts, earth work and concrete work to be paid for separately). Payment to be made per metre per metre cost of total length of barbed wire used. With G.I. barbed wire
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail