| 1 | Safe loading Carriage including unloading and proper stacking of following materials from central store Barabanki / JE Store to site of work. |
| 2 | PCC Pole /STP Pole 8.5/11/13 Mtr long |
| 3 | 11kv Pin Insulator . |
| 4 | 11kv Disc Insulator . |
| 5 | MS Earthing Rod |
| 6 | 11 KV XPLE Cable |
| 7 | ACSR Rabbit Conductor |
| 8 | Stay Set Complete |
| 9 | Other Line Material |
| 10 | Dragging of pole from JE Dump Store to site |
| 11 | Erection of Stay set of 16x1800 mm rod duly painted with red oxide,anchor plate, thumble turn buckle andstay insulate etc. digging of pit of size of size 0.4x0.6x1.6 m for grouting 1:3:6 cement concrete, with stay of size 7/8 SWG, nuzzling & Grouting. |
| 12 | Stringing and sagging of 11 KV line with ACSR Rabbit Conductor including nuzzling binding and jumpering (Rabbit conductor will be provided by the department) |
| 13 | Errectionof Substation type double pole with PCC Pole 8.5 Mtr. Long including mounting of Top Channal Dropper Channel, base angle with clamps with nut & bolt 33/11 KV line including grouting of support and plinthing 300 mm above ground level, fitting of 33/11 KV pin & Pin insulator. 1/6 of total lenght of poles will remain under the ground and planted on stone pad of Size 300x300x75 MM. |
| 14 | Errectionof singlePCC /ST Pole for Stringing and sagging of conductor 1/6 of total length of poles will remain under the ground and planted on stone pad of size 300x300x75 mm. |
| 15 | Earthing of pole with MS Earthing. |
| 16 | Provinding & Fixing of various type materials. All materials shall be supplied by the contractor. |
| 17 | Nut & Bolt |
| 18 | Clamp for Top/ Dropper and T-off Channel etc. |
| 19 | GI Pipe 3\"&4\"\" DIA |
| 20 | Top Channel 11 kv |
| 21 | Dropper Channel 11 kv |
| 22 | T-off Channel 11 kv |
| 23 | Sub-Station Base Angle |
| 24 | Gaurding Channel for LT Pol(65x65mm) |
| 25 | LT Clamp |
| 26 | LT Insulator |
| 27 | Concreating and pilinthing of ST& PCCPole 18x24 CM. |
| 28 | Laying of 11kv XLPE Cable 3x70 sqmm by digging trench, providing 1st class bricks , sand etc as per Deptt. Specification. |
| 29 | High pressure testing of 11 K.V. 3X70 Sq.mm. cable as per norms. |
| 30 | Hosting of Cable all size. |
| 31 | Fabricate with hole suitable size in steel items, receive from central store lightas top channel/dropper channel sub station base angle etc. |
| 32 | Looping of cable and mounting of pole. |
| 33 | Dismentaling of 11/ LTLine & poll |
| 34 | Dismentalling of 25 KVA healthy T/ffrom Double Pole with cartage and safe unloading with stacking at Barabanki Store. |
| 35 | Cartage of 63 KVA Tranformer from Store Centre Barabaki with safe unloading & stacking at work site. |
| 36 | Erection of 63 KVA Transforemr on Double Pole with safe energisation of system. All required material,labour for energisation of T/f shall be supplied by the contractor. |