| 1 | Appendix-A Reactive Maintenance (Initial Rectification Work) |
| 2 | 12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. |
| 3 | 12.8.A.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications.PCC Grade M15 |
| 4 | 12.8.1.C:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical SpecificationsRCC Grade M20 - Using Concrete Mixer - (Without formwork) |
| 5 | 12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications |
| 6 | Appendix-A Reactive Maintenance (Initial Rectification Work) - DAR |
| 7 | 13.33.1:Pointing on stone work with cement mortar 1:3 ( 1 cement : 3 fine sand):Flush/ Ruled pointing |
| 8 | Appendix-B Pre-Monsoon Works |
| 9 | 10.11:Removal of earth from the choked hill side drain and disposing it on the valley side manually |
| 10 | OD124837/2022-2023:Lifting and replacing of RCC slab from the drain for removing silt/muck causing choking of drain all complete; as per the directions of the engineer-in-charge. |
| 11 | OD124838/2022-2023:Engaging labour for cutting and removing trees/branches, clearing of earth-slips and providing temporary protection work for restoring traffic etc, on various roads as per the directions of the Engineer-in-charge. (Mate) |
| 12 | OD124839/2022-2023:Engaging labour for removing of trees/branches, clearing of earth-slips and providing temporary protection work for restoring traffic etc, on various roads as per the directions of the Engineer-in-charge. (Mazdoor) |
| 13 | OD124840/2022-2023:Engaging Hydraulic Excavator and Loader in order to remove and clear the earth-slip material due to land slippages all complete as per the directions of the engineer-in-charge. All kinds of soil |
| 14 | Appendix-C Proactive/Preventive Maintenance |
| 15 | 2.3.1.A:Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thicknessIn area of light jungle - By Manual Means |
| 16 | 10.3:Maintenance of Earth Shoulder (stripping excess soil) from the shoulder surface to achieve the approved level and compacting with plate compactor |
| 17 | 3.11:Removal of unserviceable soil including excavation, loading and disposal upto 1000 metres lead but excluding replacement by suitable soil which shall be paid separately as per clause 305. |
| 18 | OD124835/2022-2023:Supplying and conveying of ready mixed bituminous compound including engaging of labour and auto-pickups required in order to carry out the laying of the bituminous compound by filling potholes occurred during monsoon times or otherwise, controlling traffic etc. all complete as per the direction of the engineer-in-charge. |
| 19 | OD252395/2022-2023:Hiring of Inspection Vehicle; wherein charges applicable as per utilization per km run at a frequency as detailed in the guidelines of running contract along the route convenient to cover entire reach specified in the agreement and as directed by the departmental officer at site. |
| 20 | OD251518/2022-2023:Engaging labour as per requirement for conducting/reporting routine inspections and to take necessary instructions as applicable following the guidelines of running contract all along the route for a day of inspection covering entire reach specified in the agreement and as directed by the departmental officer at site. |
| 21 | OD254049/2022-2023:Providing and fixing of Non-reflective RC (Running Contract) informatory sign made of Non-reflective grade sheeting fixed over Aluminium sheeting 2 mm thick/ Aluminium composite material sheeting 4 mm thick with suitable back supporting frame of MS angle 25x25x3 and supported on GI pipe pole 50mm NB confirming to IS 1239 firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete min size 45 cm x 45 cm x 60 cm, 60 cm below ground level including painting all exposed surface with 2 coats of epoxy painting over epoxy primer and as per approved drawing and clause 801 including lettering symbols etc. 1200 mm x 600 mm rectangular |
| 22 | Appendix-D Emergency Works |
| 23 | OD124831/2022-2023:Engaging labour for cutting and removing trees/branches, clearing of earth-slips and providing temporary protection work for restoring traffic etc, on various roads as per the directions of the Engineer-in-charge. (Mate) |
| 24 | OD124832/2022-2023:Engaging labour for removing of trees/branches, clearing of earth-slips and providing temporary protection work for restoring traffic etc, on various roads as per the directions of the Engineer-in-charge. (Mazdoor) |
| 25 | OD124833/2022-2023:Engaging Hydraulic Excavator and Loader in order to remove and clear the earth-slip material due to land slippages all complete as per the directions of the engineer-in-charge. All kinds of soil |