|
| 1 | Rates forSupplying ,carting , laying and jointing of G.I pipe (M), Source work ,Reservoir& Providing Functional House Hold Tap Connection (FHTC) for appropriate & qualitative drinking water for each house hold and all other appurtenantworks etc complete ANDERSON water Supply scheme Under RIKHINIKAL blocks blocks in District Pauri. All rates shall be included all types of taxes and G.S.T. It is necessary the contractor will start the work from source to Distribution System. If any dispute in the source than other workwill not done by the contractor |
| 2 | Construction of Boulded Filled Gallery 4m wide including supply of all materials, labour, T&P etc. required for proper completion of work (as per type design) |
| 3 | Construction ofExtra Cross wallincluding supply of all materials, labour, T&P etc. required for proper completion of work (as per type design) |
| 4 | Supply of all materials, labour and T & P etc. and construction of R.C.C. Sump / Clear Water Reservoir of following Capacity in K.L. as perdesign and drawing including fixing of pipes and fittings including cartage of materials etc. completeClear Water Sump 210KL Capacity at MPS |
| 5 | Clear Water Sump 20 KL Capacity at IPS |
| 6 | Clear Water Sump 190 KL Capacity at TOP CWR |
| 7 | RCC CWR 2.0 KL |
| 8 | RCC CWR 3.0 KL |
| 9 | RCC CWR 4.0 KL |
| 10 | RCC CWR 5.0 KL |
| 11 | RCC CWR 7.5KL |
| 12 | RCC CWR 10.0 KL |
| 13 | RCC CWR 12.50 KL |
| 14 | Supply and fixing ofBucket type chlorinator of 25 Liter capacity at top of all service raservoirs. |
| 15 | Providing of all materials, Carting from site store to site of work,Lowering into trenches with true to alignment, Laying ofMS ERW YST 210, Jointingby electric welding process with proper grade ofeletrodes suitable for jointing of water supply pipe lines (Ador,L&T or equivalent electrodes) by cutting of pipes and making required bends by welding, completion of work with testing of pipe line etc complete.From MPS to IPS 125 mm Dia 5.6 mm Thickness |
| 16 | From IPS to Top CWR. 125 mm Dia 5.6 mm Thickness |
| 17 | Providing of all materials, Carting from site store to site of work, Laying & Jointing of G.I. medium screwed pipes (including supply of all jointing materials like specials, white lead, hemp and oil etc) in trenches with its cutting, threading and testing of pipe line etc complete.15 mm dia (For FHTC) |
| 18 | 20 mm dia |
| 19 | 25 mm dia |
| 20 | 32 mm dia |
| 21 | 40 mm dia |
| 22 | 65 mm dia |
| 23 | 80mm dia |
| 24 | Excavation of earth for pipeline trench in following strata lift upto 1.5 m lead upto 30 m including refilling, watering, ramming of excavated earth into the trenches and removal of surplus earth upto a distance of 60 m from trenches including supply of labour, T & P etc.all complete assumingthat 90% pipe line is laid in trenches, it is estimated that 95% excavation will be in soilmixed with shingle, bajari and boulders and rest 5% will be in medium rock (trench 0.60 m wide and 0.60 m deep)Soil Mixed with boulder and bajari |
| 25 | Medium Rock |
| 26 | Supply & fixing of following sizes of valves including carting the same up to side of work and fixing the same in water supply lines including cost of valves, specials, labour and T&P complete in all respect125 mm dia Sluice Valve( P.N 1.6 ) |
| 27 | C.I. Air valve80 mm |
| 28 | Supply of all materials, labour, T & P etc. and Construction of size Sluice Valve / Reflux Valve/Scour Valve Chamber/Air valve as per type design complete(1.2x1.2x1.2) |
| 29 | Supply of all materials, labour, T & P etc. and Construction ofR.C.C Anchor Block (0.75 m x 0.75 m x 0.75 m)as per type design complete |
| 30 | Painting of MSERW Pipes with 2 coats of approved quality. (Anti-Corrosive paint over one coat of Primer) (Dia of pipe in mm)125 mm dia |
| 31 | Supply and fixing of following fittings including cartage of materials, labour, T&P etc. completeGate/Wheel Valve ( Brass )/G.M.Valve20 mm dia |
| 32 | 25 mm dia |
| 33 | 32 mm dia |
| 34 | 40 mm dia |
| 35 | 65 mm dia |
| 36 | 80 mm dia |
| 37 | Supply of all materials, labour, T&P etc. and construction of0.6 m x 0.6 m x 0.75 m size Gate Valve chamber with FPS bricks |
| 38 | Supply of all materials, labour, T&P etc. and construction ofBreak Pressure Tank as per Design |
| 39 | Excavation for foundation in Soil mixed with boulders for protection work |
| 40 | Random Rubble Stone Masonry laid in 1:6 cement and sand mortar, in breast walls, retaining walls, parapets, scuppers, etc. including supply of all material, labour, T&P etc. complete in Intake work, along the Rising main, Supply/feeder main, distribution system, storage reservior etc |
| 41 | Random Rubble Stone Masonry laid Dry, in breast walls, retaining walls, etc. including supply of all material, labour, T&P etc. completein Intake work, along the Rising main, Supply/feeder main, distribution system, storage reservior etc |
| 42 | Supply of all materials, labours, T&P etc and making ferrule connection to provide FHTC to the consumer under JJM complete (as per household survey)Making ferrule connection in the existing main of G.I. or any type of pressure mains with saddle piece, service connections, fittings and fixing of G.M. ferrule including tapping the main, but excluding the cost of earth work and cost of all materials. Ferrule Connection (Labour cost only including index) |
| 43 | Providing and fixing brass bib cock of approved quality |
| 44 | Providing brass ferrule of approved quality |
| 45 | Providing G.I. tee of approved quality |
| 46 | Providing G.I. union of approved quality |
| 47 | Providing brass nipple of approved quality |
| 48 | Cartage of Material from foot hill Kotdwar to Site Store at Road head by truck in Pucca & Kachcha Road & also including by head load & stacking of materials(as per annexure) |
| 49 | SITC of electric driven multi-stage horizontalclear water centrifugal pumps withbronze impellers, stainless steel shaftcapable to deliver clear water 550 LPM discharge at 360 Mt. head 2900 r.p.m. at MPS & IPS |
| 50 | Supply & fixing of M.S fabricated base plate and coupling for above pumps and motors. At MPS & IPS |
| 51 | SITC of horizontal shaft TEFC electric motors suitable to run on 415 +-10% volts, 3 phase, 50 Hz A.C , 2900 r.p.m.supply at MPS & IPS |
| 52 | Supply of MS sheet fabricated, dust and vermin proof cubical floor mounting type control panelmade out from 14 SWG MS sheet, copper busbars, having 1 no. incoming and 2 nos. outgoing (as per annexure) |
| 53 | Supply of fully automatic auto transformer type starter suitable for above motors having airbreak contactors, electroni timer, thermal over load relay, adequate size Aluminum bus bars, copper wound auto transformer and dulywired by copper leads/ wire, lugs, ON/OFF andreset switches and indicators etc. completein all respects.(For MPS & IPS ) |
| 54 | Supply of power wiring material such as 25 sq.m.m 3 Core copper conductor cable XLPE insulated cable for power wiring between the control panel and starter to motor. (FOR TWO RUNS) |
| 55 | Supply of power wiring material such as 70 sq.mm. 3and half Core aluminum onductor cable XLPE insulated, cable for power wiring between power transformer and contrl panel |
| 56 | Jointing material for wiring connection including lugs, thimble , insulation tapes, nutt bolts etc. |
| 57 | Doubleloop earting of all electrical equipmentswith supply of material such as G.I earth strip, earth plate, GI funnel, charcoal, Salt watering pipe etc. including digging of pits and refilling complete |
| 58 | Supplyof main piping spair and valves (as per annexure) |
| 59 | Supply of a set of pressure gauges (0-56) kg/cm^2 complete with control cocks and nipples including all necessary fitting etc. |
| 60 | Supply of Tools (as per annexure) |
| 61 | Rubber insulationsheet 2.0mx0.1mx25mm thick |
| 62 | Installation, commissioning and testing work of entire equipment including pumps, motors, control panel, starter, and power wiring etc, |
| 63 | Provision of Sign Board |
| 64 | Provision of Material Testing |