Tender For Diversion Of Hmp Gt Feeder (Single Circuit) For New Oc Patch B Of Gopalchak Colliery.
Tender Value
9.54 Lakhs
Estimated cost
Bid Submission
05 Mar 2023
0 days left
EMD
11937
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
gopalichak → Jharkhand
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Diversion Of Hmp Gt Feeder (Single Circuit) For New Oc Patch B Of Gopalchak Colliery.
BOQ
| Sl. No. | Item Description |
| 1 | Item Description/ Heading |
| 2 | Transportation of Pole from Store to work site |
| 3 | Erection of metallic pole of 10 to 12 metre length (CPWD SOR\" 2012, P-36, 11.3.4) |
| 4 | Fabrication & Erection of bracket & Clamps |
| 5 | Transportation of bracket & clamps (5 Heads x 2 Days) |
| 6 | Supplying and erection of Stay set complete (galvanised) with 19/20 mm dia X 1.8 metres long stay rod (CPWD SOR\" 2012, P-41, 13.1) |
| 7 | Supply & erection of 11 KV Disc insulator (CPWD SOR\" 2012, P-42, 13.11) |
| 8 | Supply & erection of 11 KV Pin insulator (CPWD SOR\" 2012, P - 42, 13.10) |
| 9 | Erection of disc/pin insulator for 11 KV over head lines as required. (CPWD SOR\" 2012, P-42, 13.12) |
| 10 | Supply & erection of M.S Nut, Bolts & washers (Present market Rate) |
| 11 | Making new Jumper with O/H line |
| 12 | Transportation of conductor from store to site 3903 Mtrs (5 Heads x 4 Days) |
| 13 | Erection of ACSR Wolf Conductor 3903 metres (CPWD SOR\" 2012, P-39, 12.22) @ 0.726 Kg/Mtr |
| 14 | Supply & erection of earth wire with 8 No. swg G.I wire |
| 15 | Tree & branches cutting below O/H line (Erection Part) (5 Heads x 4 Days in Erection Part & 5 Heads X 4 Days in Dismantle Part) |
| 16 | Dismantle of jumper from O/H line |
| 17 | Dismantling of over head lines ACSR Wolf Conductor 3760 Metres (CPWD SOR\" 2012, P-40, 12.40) @ 0.726 kg/mtrs |
| 18 | Transportation of dismantle conductor from site to store 3760 mtrs (5 Heads x 4 Days) |
| 19 | Dismantle of disc/pin insulator for 11 KV over head lines as required. (CPWD SOR\" 2012, P-42, 13.12) |
| 20 | Dismantle of bracket & clamps |
| 21 | Transportation of dismantle bracket & clamps ( 5 Heads x 2 days) |
| 22 | Dismantle of pole/street light standard/strut embedded in cement concrete foundation etc. as required (CPWD SOR\" 2012, P-40, 12.42) |
| 23 | Transportation of dismantle Pole from work site to store |
| 24 | Total impact of GST for the purpose of CTC |
AI Tender Summary
Tender Timeline
Feb 27, 2023
11:30 IST
Tender Published
Tender notice published.
CompletedMar 05, 2023
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedMar 06, 2023
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender