| 1 | Excavation of Pole Pits/Stay Set: |
| 2 | For pole upto 8.0m length by using JCB/Manual |
| 3 | For pole above 8.0m length by using JCB/Manual |
| 4 | In Hard Soil (common to all size of poles) |
| 5 | Excavation of Stay pit of 4.5\" to 5\" depth using JCB/Manual |
| 6 | Erection of Poles and Accessories |
| 7 | Erection of RCC, REC, PSC poles upto 8.00m length by using JCB/Manual |
| 8 | Erection of RCC, REC, PSC poles above 8.00m length by using JCB/Manual |
| 9 | Erection of stay set complete with fixing up stay wire Eye, Bow,Guy Shackle, Binding etc. |
| 10 | Fixing of line materials |
| 11 | Fixing of HT VCross arms3 1/2, 4 1/2 & 5 feet, Tapping cross arm & Garding cross arm |
| 12 | Fixing of LT 3 Phase cross arm |
| 13 | Fixing of LT single Phase cross arm |
| 14 | Fixing of HT / LTTI Fitting |
| 15 | Fixing of HT Pin Insulators (11/22/33KV) |
| 16 | Fixing of LT Pin Insulators |
| 17 | Fixing of HT 11KV stain disc |
| 18 | Fixing of LT Shackle |
| 19 | Fixing of Aluminium knob |
| 20 | Paving and Stringing of conductor |
| 21 | Paving and stringing of conductors of sizes upto 7/2.59 mm ACSR or other equivalent conductor |
| 22 | Paving and stringing of conductors of sizes above 7/2.59 mm ACSR or other equivalent conductor upto 7/3.35mm ACSR |
| 23 | Releasing and reerection (resagging) of one run of all sizes of conductor |
| 24 | Erection of Distribution Transformers: |
| 25 | Erection of 11KV Single pole structure including erection of DT complete without centre support |
| 26 | Concreting Works |
| 27 | Concreting with 1:4:8 mix using 40mm jelly including curing (material +labour) mass concreting of poles |
| 28 | Earthing |
| 29 | Earthing of poles with GI wires 4 or 6 SWG by coil earthing |
| 30 | Loading/Unloading Charges |
| 31 | Loading of DT upto 100KVA |
| 32 | Unloading of DT upto 100KVA |
| 33 | Loading of various size of REC, RCC,PSC Poles upto 8.0m length |
| 34 | Loading of various size of REC, RCC,PSC Poles above 8.0m length |
| 35 | Unloading of various size of REC, RCC,PSC Poles upto 8.0m length |
| 36 | Unloading of various size of REC, RCC,PSC Poles above 8.0m length |
| 37 | Loading of conductor |
| 38 | Unloading of conductor |
| 39 | Loading of line material |
| 40 | Unloading of line material |
| 41 | Loading of 11 KV strain disc |
| 42 | Unloading of 11 KV strain disc |
| 43 | Loading of LT Pin insulator shackle, guy shackle, LT Pin, Metal parts, HT pin etc., |
| 44 | Unloading of LT Pin insulator shackle, guy shackle, LT Pin, Metal parts, HT pin etc., |
| 45 | Transportation charges |
| 46 | Transportation of all types and sizes of poles and other associated material from road side to pole pit and vice versa upto 0.50KM |
| 47 | Transportation of all type of poles by bullock cart or other vehicle (for all sizes of poles including loading and unloading) upto 5 KM |
| 48 | Transportation of all type of poles by bullock cart or other vehicle (for all sizes of poles including loading and unloading) Above 5 KM |
| 49 | Transporting of conductors of all size from road side to pit locations upto 1 KM of conductor |
| 50 | Transporting of Distribution Transformer / Line materials from stores to office/ site upto 10KM distance by engaging 1 ton capacity Minidor(lorry) |
| 51 | Dismandling of Line Materials |
| 52 | Dismandling of RCC, REC, PSC & Metal poles of all sizes including the closing of pit |
| 53 | Dismandling of conductor of upto 7/3.35 including Transporting the conductor to the nearest road side and stocking in coils |
| 54 | Dismandling of Cross arm clamps, TI fittings hardwares, insulators etc. |
| 55 | WORKSHOP CHARGES :- |
| 56 | Manufacturing/ Altering of clamps |
| 57 | Drilling of holes in the structure materials clamps etc. |
| 58 | AB switch or open type side arm stud, cutting and drilling holes. |
| 59 | Manufacturing of earth pipe clamps for structure including of drilling holes and welding and clamp with earth pipe |
| 60 | GENERAL |
| 61 | Clearing of Tree brances of coconut tree |
| 62 | Leveling of Ground using Bul Dozer |
| 63 | Cleaaring of Branches/ Trees with JCB |
| 64 | E.P.F. @13 % should be Entered by the Bidder |
| 65 | E.S.I. @3.25 % should be Entered by the Bidder |
| 66 | G.S.T. @18% should be Entered by the Bidder |