Supply Of Materials To Formation Of Public Ground At Phc Place At Hanumsagar Village In Kustagi Tq , Tractor - 40 Hp, Stone Dresser ( With Tools ) , Mason Class Ii ( With Tools ) , Laboratory Asst. ( Sslc Passed ) / Mate / Supervisor, Enamel Metal Paint, Cobble Stones Of 60 Mm Thick, Water, Mason Class I ( With Tools ) , Add, Add Handling , Loading And Unloading At 2% On Material, Add Brush At 1% On Cost Of Paint, Add Sundries Charges At 1 % On Labour, Burnt Bricks Class 35 ( Non Modular ) , Broken Granite Metal 20 Mm, Coarse Sand ( Zone Iii ) , Vibratory Roller 8 Tonne, Broken Stone Aggregate 40 Mm Size, Mixer ( Concrete Small Used In Culvert ) , Sludge / Farm Yard Manure @ 0.18 Cum Per 100 Sqm, Blacksmith Assistant, Burnt Stone Slabs 10 Cms Thick, Broken Stone Aggregate 12 Mm To 10 Mm Size, Add 5% Cost Of Material For Riveting, Bolting And Welding Accessories, Water Tanker, Broken Stone Aggregate 20 Mm Size, Painter Class I, Ms Flat, Add Watering Charges At 1 % On Material, Portland Cement, Transportation / Loading And Unloading Of Material / Lifting Of Material / Wastage / Unforeseen Charges / Miscellaneous Which Are Necessary During Execution., Plate Vibrator Having 3 Ton Compaction Force, Fine Grass, Pvc Pipe Of 4Kg Cum, 75 Mm, Gravel 2.36 Mm / Murrum, Add Handling , Loading And Unloading At 1% On Material, Mixer ( Concrete ) - 1 Cum Capacity, Add Sundries Charges At 1 % On Material, Add Providing And Removing Scaffolding At 3% On Labour