|
| 1 | SITC of Pump, Motor Spare Parts and Supplying ,carting , laying and jointing of G.I pipe (M), Source work ,Reservoir& qualitative drinking water for each house hold and all other appurtenantworks etc complete WAJALI water Supply scheme Under PAURIblocks in District Pauri. All rates shall be included all types of taxes and G.S.T. It is necessary the contractor will start the work from source to Distribution System. If any dispute in the source than other workwill not done by the contractor |
| 2 | ConstructionofaCrossWallincludingsupplyofallmaterial,labour, T&P etc complete |
| 3 | Cunstrutionofintakechamberinclulding supplyofall material,labour, T&P etc complete |
| 4 | ConstructionofRapidSandFilterof0.60MLDof2unitfilter beds of1.80 X 2.30 mtrs = 4.04 sqm. each including supply of allmaterial, labour, T&P etc complete |
| 5 | Supply of all matirials labour& t&p costruct flocculator unite asper drawing and design |
| 6 | 100mm diaGI medium class perforatedpipe having 10mm dia holes 25 mm apartincluding supply of all material, labour, T&Petc complete |
| 7 | Fillingpebbles or stone25 mm to 50 mm size in gallary for water interception around perforated pipe including supply of allmaterial, labour, T&P etc complete |
| 8 | Providing&Fillinglargestonespitchingincludingsupplyofallmaterial, labour, T&P etc complete |
| 9 | Providing & Fixing50 mm GI medium pipe with plug for washout including supply of all material, labour, T&P etc complete |
| 10 | Protection works R.R.1:6 Stone masonry |
| 11 | Protection works R.R.dry Stone masonry |
| 12 | P.C.C 1:4:8 |
| 13 | Investigation, design and construction of following RCC SUMP / semi sunk reservoir including testing, cost of all pipes & fittings, supply and cartage of all material, Labour and T&P etc,complete. StructuraldesignshouldbefromIITorequivalentinstitution. (Cap. in KL)80 |
| 14 | Investigation, design and construction of following Pump House including testing, cost of all materials & fittings, supply and cartage of all material, Labour and T&P etc,complete. Structural design should be from IIT or equivalent institution. |
| 15 | Investigation, design and construction of following Staff Quarter Type-I including testing, cost of all materials & fittings, supply and cartage of all material, Labour and T&P etc,complete. Structural design should be from IIT or equivalent institution. |
| 16 | SITCof horizontal splitcasing centrifugal pumpsfor MPS discharge236.55, LPM, 413 mtr head, withsuitablemotor and base frame and foundation complete . PUMP Motar set |
| 17 | Cabling from Control Panel to Pump |
| 18 | Cable Tray |
| 19 | Cable Glands |
| 20 | Base Frame |
| 21 | Inlet and Outlet Mannual Valves (Sluice Valves) |
| 22 | Installation of Pump & Motor,Cable Laying &Termination on both sides,Motor No Load test at site,Pump Trial for 8 Hours |
| 23 | Control Panel with 2 VFD (One running, One standby), Switch Gear- ABB/Schneider Incorner & Outgoing, CRCA Sheet Powder Coated, Phase Indicator, MFM,Selector Switch, Floor Mounted. |
| 24 | Mandatory Tools & Spares (List Attached) |
| 25 | Non-Returning Valves |
| 26 | Transportation with Loading & Unloading |
| 27 | Providing ofall materials,carting from site store to site of work, Lowering into trenches with true to alignment, Laying of MSERW PipesgradeYst210,Jointingbyelectricweldingprocesswith propergradeofelectrodessuitableforjointingofwatersupply lines(Ador, L&T or equivalent electrodes) by cutting of pipes and makingrequiredbendsbywelding,completionofworkwith testing of pipe line etc complete. All 4.80 mm and 3.20 mm thick MSERW Pipe.80 mm 3.2 mm thick |
| 28 | Earth work in excavation by mechanical means (Hydraulic Excavator)/manualmeansinfoundationtrenchesordrains(not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sidesandrammingofbottoms,liftupto1.5m,including getting outtheexcavatedsoilanddisposalofsurplusexcavatedsoilas directed,withinaleadof50m.For pipeline infollowing strata including supply of labour, T&P. etc complete. Assuming that 90% pipelineislaidintrenches,itisestimatedthat75%excavation will be in soil mixed with shingle, bajri & boulders and rest 25% will be in medium rock.In soil mixed with boulders @ 75 % |
| 29 | In soft rock @ 25 % |
| 30 | Cartage of following pipes, specials & fittings from Kotdwar to site store for proper completion of works.80 mm 3.2 mm thick |
| 31 | Supplyandfixingofthefollowingfittingsincludingcartageof materials, labour and T&P etc. complete.Wheel Valve/Gate ValveFor 80 mm dia |
| 32 | Supply of all materials, labour and T&P etc. and construct following valve chambers as per type design.Wheel Valve Chamber 45cm x 45cm size |
| 33 | Supply ofall materials,labours, T.&P.etc. andconstruct Anchor Blocks as per type design complete.1.00m X 1.00 m X 1.00 m |
| 34 | 1.15 m X 1.15 m X 1.15 m |
| 35 | Investigation,designandconstructionoffollowingRCCCWR/ semi sunk reservoir including testing, cost of all pipes & fittings, supply and cartage of all material, Labour and T&P etc,complete. StructuraldesignshouldbefromIITorequivalentinstitution.(Cap. in KL)50 KL |
| 36 | Supplyand installationofbuckettypechlorinatorof25liters capacityincludingbleachingpowdersolutiondoser,chloroscope kitwithstopcock& ironcage fabricatedwith25mm x25mm squaremeshwith lockingarrangementsbelowdozertoprotect flexible pipe connection with CWR complete with all arrangementsin position. |
| 37 | Providing ofall materials,carting from site store to site of work, Laying& JointingofG.I.screwedpipes(includingsupplyofall jointingmaterialslikespecials,whitelead,,hempandoiletc)in trencheswithitscutting,threadingandtestingofpipelineetc complete.65mm dia |
| 38 | 50mm dia |
| 39 | 40mm dia |
| 40 | Cartage of following pipes, specials & fittings from Kotdwar to site store for proper completion of works.for 65 mm dia |
| 41 | for 50 mm dia |
| 42 | for 40 mm dia |
| 43 | Supplyandfixingofthefollowingfittingsincludingcartageof materials, labour and T&P etc. complete.Wheel Valve/Gate Valvefor 50 mm dia |
| 44 | Supply of all materials, labour and T&P etc. and construct following valve chambers as per type design.Wheel Valve Chamber 45cm x 45cm size |
| 45 | Providing ofall materials,carting from site store to site of work, Laying& JointingofG.I.screwedpipes(includingsupplyofall jointingmaterialslikespecials,whitelead,,hempandoiletc)in trencheswithitscutting,threadingandtestingofpipelineetc complete.80 mm dia |
| 46 | 65mm dia |
| 47 | 50mm dia |
| 48 | 40mm dia |
| 49 | 32mm dia |
| 50 | 25mm dia |
| 51 | 15 mm dai |
| 52 | Cartage of following pipes, specials & fittings from Kotdwar to site store for proper completion of works.80 mm dia |
| 53 | 65mm dia |
| 54 | 50mm dia |
| 55 | 40mm dia |
| 56 | 32mm dia |
| 57 | 25mm dia |
| 58 | 15 mm dai |
| 59 | Supplyandfixingofthefollowingfittingsincludingcartageof materials, labour and T&P etc. complete.Wheel Valve/Gate Valvefor80 mm dia |
| 60 | for 65 mm dia |
| 61 | for 50 mm dia |
| 62 | for 40 mm dia |
| 63 | Supply of all materials, labour and T&P etc. and construct following valve chambers as per type design.Wheel Valve Chamber 45cm x 45cm size |
| 64 | Providingandfixing15mmdia.G.I.pipescompletewithG.I. fittings etc. from distribution network to householdsF.H.T.C.Connection -Distribution Line to Household (50) |
| 65 | Godown & Hiring Charges |