| 1 | PRESSURE REGULATING UNIT FOR DUST SUPRESSION SYSTEM AT CHP | 4 |
| 2 | FLOW ACTIVATION STATION FOR DUST SUPRESSION SYSTEM AT CHP | 14 |
| 3 | POWER CABLE 3 COREx1.5 SqMM | 1000 |
| 4 | DFDS NOZZLE SPRAY BAR | 57 |
| 5 | PIPE | 1300 |
| 6 | PIPE | 1000 |
| 7 | PIPE | 1000 |
| 8 | ELBOW | 175 |
| 9 | ELBOW | 193 |
| 10 | ELBOW | 184 |
| 11 | MS FLANGE, SIZE: 32 NB, MOC: MS | 10 |
| 12 | TEE EQUAL | 19 |
| 13 | TEE EQUAL | 11 |
| 14 | TEE EQUAL | 20 |
| 15 | GLOBE VALVE NB20 | 26 |
| 16 | VALVE SIZE 1/2 CLASS150 | 26 |
| 17 | PRESSURE GAUGE 0-16 KG/CM2 | 27 |
| 18 | NEEDLE VALVE 1/2" | 6 |
| 19 | PRESSURE RELIEF VALVE, | 6 |
| 20 | SUCTION SIDE FLANGE | 12 |
| 21 | PVC FLEXIBLE TUBE FOR DUST SUPRESSION SYSTEM AT CHP | 100 |
| 22 | PVC FLEXIBLE TUBE FOR DUST SUPRESSION SYSTEM AT CHP | 100 |
| 23 | SWITCH FUSE UNIT DRAW OUT TYPE UNILEK MAKE MODULE WITH INCOMING AND OUTGOING AL BUS, CAPACITY : 400 AMP. | 1 |
| 24 | SUCTION SIDE FLANGE | 7 |
| 25 | MS GATE VALVE SIZE 80 NB | 5 |
| 26 | SUCTION SIDE FLANGE | 10 |
| 27 | NRV VALVE, DIA : 80MM (3" NB), #150 CLASS, FLANGE END . | 2 |
| 28 | PIPE | 30 |
| 29 | PIPE | 30 |
| 30 | BRONZE GLOBE VALVE SIZE 40 NB | 2 |
| 31 | MAXFLOW MAKE PUMP DISCHARGE POINT CASING, CAPACITY : 20 HP , HEAD -70 MTR. 725 LPM | 1 |
| 32 | PVC FLEXIBLE TUBE FOR DUST SUPRESSION SYSTEM AT CHP | 5 |
| 33 | SHAFT COUPLINGS | 2 |
| 34 | COUPLING BOLT WITH NUT & WASHER FOR COPUMP PNO.1&2 | 40 |
| 35 | COPPER LINK FOR 3 CORE X 95 SQMM COPPER FLEXIBLE CABLE FOR DS SYSTEM OF CHP | 1 |
| 36 | SUCTION SIDE FLANGE | 7 |
| 37 | GM GATE VALVE-125MM | 5 |
| 38 | NRV FLAP 125 NB FOR DM PLANT UNIT-8 | 2 |
| 39 | SUCTION SIDE FLANGE | 10 |
| 40 | TEE EQUAL | 2 |
| 41 | ELBOW SIZE =" | 10 |
| 42 | PIPE | 75 |
| 43 | MOTOR COUPLING , MOTOR CAPACITY: 90 KW FOR DUST SUPRESSION SYSTEM AT CHP | 2 |
| 44 | SUCTION SIDE FLANGE | 8 |
| 45 | SUCTION SIDE FLANGE | 6 |
| 46 | MOTOR COUPLING , MOTOR CAPACITY: 22 KW FOR DUST SUPRESSION SYSTEM AT CHP | 2 |
| 47 | NON RETURN VALVE 65 NB, PART NO. MB6641D | 2 |
| 48 | SUCTION SIDE FLANGE | 4 |
| 49 | NRV, 15 MM, MOC: MS | 1 |
| 50 | SUCTION SIDE FLANGE | 2 |
| 51 | MOTOR COUPLING , MOTOR CAPACITY: 3.7 KW FOR DUST SUPRESSION SYSTEM AT CHP | 4 |
| 52 | AIR RECEIVER TANK FOR DUST SUPRESSION SYSTEM AT CHP | 1 |
| 53 | NRV FOR DFDS COMPRESSOR OF DUST SUPRESSION SYSTEM AT CHP | 2 |
| 54 | PRESSURE SWITCH RANGE : 1 TO 16 ATMG | 18 |
| 55 | SOUND PROOF DOORS FOR DUST SUPRESSION SYSTEM AT CHP | 6 |
| 56 | LEVEL SWITCH | 2 |
| 57 | ELBOW SIZE =" | 4 |
| 58 | PIPE | 25 |
| 59 | SUCTION SIDE FLANGE | 10 |
| 60 | NON RETURN VALVE NB 50 | 2 |
| 61 | ELBOW SIZE =" | 3 |
| 62 | TEE EQUAL | 1 |
| 63 | TERMINATION BOX OF 7.5 KW MOTOR FOR DUST SUPRESSION SYSTEM | 1 |
| 64 | GLOBE VALVE (SCREW) NB 25 | 2 |
| 65 | ELBOW SIZE =" | 36 |
| 66 | PIPE | 150 |
| 67 | SUCTION SIDE FLANGE | 6 |
| 68 | ELBOW SIZE =" | 2 |
| 69 | G I EQUAL TEE 65 MM | 2 |
| 70 | PIPE | 31 |
| 71 | GATE VALVE SIZE 1 1/4" | 105 |
| 72 | QUICK RELEASE COUPLING, SIZE 32 NB | 85 |
| 73 | FLEXIBLE HOSE PIPE SIZE - ID 1 INCH FOR WATER JETTING | 150 |
| 74 | BIB TAP, SIZE 15 NB | 13 |
| 75 | GI UNION 15 MM | 24 |
| 76 | TAFLON TAPE SIZE-12MM | 50 |
| 77 | NOZZLE(SPARE FRO DRY FOG DUST SUPRESSION SYSTEM) | 20 |
| 78 | TEE EQUAL | 10 |
| 79 | SOLENOID BOX COVER WITH LOCKING ARRANGEMENT FOR DUST SUPRESSION SYSTEM AT CHP | 22 |
| 80 | HEADER BAR WITH UNION & NOZZLE CAPACITY: 5 LPM,WORKING PR. 2.5 KG/CM2 FOR DUST SUPRESSION SYSTEM AT CHP | 1 |
| 81 | HEADER BAR WITH UNION & NOZZLE CAPACITY: 4 LPM,WORKING PR. 4.5 KG/CM2 FOR DUST SPRESSION SYSYTEM AT CHP. | 1 |
| 82 | HEADER BAR WITH UNION & NOZZLE CAPACITY: 4 LPM,WORKING PR. 4.5 KG/CM2 FOR DUST SPRESSION SYSYTEM AT CHP. | 1 |
| 83 | HEADER BAR WITH UNION & NOZZLE CAPACITY: 4 LPM,WORKING PR. 4.5 KG/CM2 FOR DUST SPRESSION SYSYTEM AT CHP. | 1 |
| 84 | HEADER BAR WITH UNION & NOZZLE CAPACITY: 5 LPM,WORKING PR. 2.5 KG/CM2 FOR DUST SUPRESSION SYSTEM AT CHP | 1 |
| 85 | HEADER BAR WITH UNION & NOZZLE CAPACITY: 4 LPM,WORKING PR. 4.5 KG/CM2 FOR DUST SPRESSION SYSYTEM AT CHP. | 1 |
| 86 | HEADER BAR WITH UNION & NOZZLE CAPACITY: 4 LPM,WORKING PR. 4.5 KG/CM2 FOR DUST SPRESSION SYSYTEM AT CHP. | 1 |
| 87 | HEADER BAR WITH UNION & NOZZLE CAPACITY: 4 LPM,WORKING PR. 4.5 KG/CM2 FOR DUST SPRESSION SYSYTEM AT CHP. | 1 |
| 88 | NON RETURN VALVE NB 50 | 2 |
| 89 | NON RETURN VALVE NB 65 | 2 |
| 90 | NON RETURN VALVE NB 65 | 36 |
| 91 | GLOBE VALVE SIZE: 65 MM , MOC: BRASS | 36 |
| 92 | V BELT, NO.C3610/C140 FOR CETRIFUGAL FAN OF VENTILATION SYSTEM | 18 |
| 93 | FAN PULLEY FOR VENTILATION SYSTEM | 3 |
| 94 | GRILLS FOR VENTILATION SYSTEM AT CHP | 50 |
| 95 | BELLOW FOR VENTILATION SYSTEM AT CHP | 3 |
| 96 | MOTOR OPERATED, CIRCULAR FRONT FACE FIRE DAMBER FOR CHP TUNNEL VENTILATION SYSYTEM | 1 |
| 97 | MOTOR OPERATED, CIRCULAR FRONT FACE FIRE DAMBER FOR CHP TUNNEL VENTILATION SYSYTEM | 1 |
| 98 | MOTOR PULLEY FOR VENTILATION SYSTEM AT CHP | 1 |
| 99 | MOTOR OPERATED, CIRCULAR FRONT FACE FIRE DAMBER FOR CHP TUNNEL VENTILATION SYSYTEM | 1 |
| 100 | SAFETY PULLEY GUARD FOR CENTIFUGAL FAN OF VENTILATION SYSTEM | 3 |
| 101 | SAFETY PULLEY GUARD FOR CENTIFUGAL FAN OF VENTILATION SYSTEM | 3 |
| 102 | SAFETY PULLEY GUARD FOR CENTIFUGAL FAN OF VENTILATION SYSTEM | 2 |
| 103 | CENTRIFUGAL FAN WITH MOTOR OF AIR VENTILATION SYSTEM. | 1 |
| 104 | SWITCH FUSE UNIT ROTARY HANDLE,OESA 00-125 N/OFAFN00GG125, MAKE:- ABB FOR LOCAL ELECTRICAL CONTROL PANEL | 2 |
| 105 | NORMAL PUSH BUTTON (GREEN)1NO+1NC, 3SB12030AC01 ,MAKE : SIEMENS/TEKNIC FOR LOCAL ELECTRICAL CONTROL PANEL. | 12 |
| 106 | INDICATION LAMP (AMBER) 230VAC, 3SB5285, MAKE: SIEMENS FOR LOCAL ELECTRICAL CONTROL PANEL | 2 |
| 107 | 4 POLE , 2 WAY,6AMP. 230 V AC SELECTOR SWITCH,MAKE: KAYCEE FOR LOCAL ELECTRICAL CONTROL PANEL | 6 |
| 108 | 5/15A,PLUG & SOCKET,230VAC, MAKE: ANCHOR FOR LOCAL ELECTRICAL CONTROL PANEL | 1 |
| 109 | VOLTMETER SELECTOR SWITCH | 2 |
| 110 | ANALOG VOLTMETER , RANGE : 0-500V SIZE- 96 X 96,MAKE: MECO/AE | 3 |
| 111 | SWITCH FUSE UNIT ROTARY HANDLE,OESA 00-100 N/OFAFN00GG100 , MAKE:- ABB FOR LOCAL ELECTRICAL CONTROL PANEL | 1 |
| 112 | 3-PHASE SQUIRREL CAGE INDUCTION MOTOR, 1475 RPM,30 KW,MAKE: CROMPTON GREAVES, | 1 |
| 113 | 200A,SFU,TPN WITH ROTARY HANDLE+200A DIN FUSE LINK, OS200DO3N3P/OFAFN1GG200, MAKE:- ABB FOR LOCAL ELECTRICAL CONTROL PANEL | 1 |
| 114 | POWER TERMINAL 70 SQMM,CTS-70LS,BUSBAR MAKE: CONNECTWELLFOR LOCAL ELECTRICAL CONTROL PANEL | 1 |
| 115 | MINIATURE CIRCUIT BREAKER (MCB), 6A,SINGLE POLE ,10KA,S271-C6 , MAKE : ABB FOR LOCAL ELECTRICAL CONTROL PANEL | 3 |
| 116 | 20A FUSE BASE WITH 4A FUSE LINK,CNS20H/CNS4,MAKE:- C & S FOR LOCAL ELECTRICAL CONTROL PANEL | 2 |
| 117 | 20A FUSE BASE WITH 6A FUSE LINK,CNS20H/CNS6,MAKE:- C & S FOR LOCAL ELECTRICAL CONTROL PANEL | 1 |
| 118 | MINIATURE CIRCUIT BREAKER 2 - POLE, 16 A, 415 V | 1 |
| 119 | AMMETER SELECTOR SWITCH (ASS) , 6A,MAKE: KAYCEE FOR LOCAL ELECTRICAL CONTROL PANEL | 1 |
| 120 | 16 A DP ISOLATOR,S271-C6, MAKE: ABB FOR LOCAL ELECTRICAL CONTROL PANEL | 1 |
| 121 | 20A FUSE BASE WITH 2A FUSE LINK,CNS20H/CNS2, MAKE:- C & S FOR LOCAL ELECTRICAL CONTROL PANEL | 12 |
| 122 | ANALOG AMMETER RANGE : 0-100/600A,SIZE-96 X 96 ,CTR- 100/1,MAKE: MECO/AE FOR LOCAL ELECTRICAL CONTROL PANEL | 2 |
| 123 | SWITCH FUSE UNIT ROTARY HANDLE,OESA 00-63N/OFAFN00GG63 , MAKE:- ABB FOR LOCAL ELECTRICAL CONTROL PANEL | 2 |
| 124 | ANALOG AMP. METER RANGE : 0-175/1050A,SIZE-96 X 96 ,CTR- 175/1,MAKE : MECO/AE FOR LOCAL ELECTRICAL CONTROL PANEL | 2 |
| 125 | INDICATION LAMP (AMBER), 230VAC,3SB5285-MAKE:- SIEMENS FOR LOCAL ELECTRICAL CONTROL PANEL | 1 |
| 126 | MINIATURE CIRCUIT BREAKER (MCB), 6A,DOUBLE POLE ,10KA,S272-C6, MAKE : ABB FOR LOCAL ELECTRICAL CONTROL PANEL | 5 |
| 127 | ANALOG AMP. METER RANGE : 0-25/150A,SIZE-96 X 96 ,CTR- 25/1A, MAKE : MECO/AE FOR LOCAL ELECTRICAL CONTROL PANEL | 2 |
| 128 | SWITCH FUSE UNIT ROTARY HANDLE,OESA 00-32N/OFAFN00GG32 , MAKE:- ABB FOR LOCAL ELECTRICAL CONTROL PANEL | 25 |
| 129 | ANALOG AMP. METER RANGE : 0-50/300A,SIZE-96 X 96 ,CTR- 50/1A, MAKE : MECO/AE FOR LOCAL ELECTRICAL CONTROL PANEL | 1 |
| 130 | MINIATURE CIRCUIT BREAKER 2 - POLE, 16 A, 415 V | 10 |
| 131 | MINIATURE CIRCUIT BREAKER (MCB), 25A,DOUBLE POLE ,10KA,E202/16 , MAKE : ABB FOR LOCAL ELECTRICAL CONTROL PANEL | 1 |
| 132 | AUXILIARY CONTACTOR(2NO+2NC)230VAC,N22E 230VAC MAKE: ABB FOR LOCAL ELECTRICAL CONTROL PANEL | 2 |
| 133 | ABB NO CONTACT FOR LOCAL ELECTRICAL CONTROL PANEL | 2 |
| 134 | NORMAL PUSH BUTTON (RED) 1NO+1NC,3SB12030AC01, MAKE: SIEMENS/TEKNIC FOR LOCAL ELECTRICAL CONTROL PANEL | 15 |
| 135 | Erection and commissioning of Air receiver tank including fixing of Pressure Guage ,Safety valve, Drain valve, grouting , IN/Out process connection, painting , etc. Capacity of ART - 300 Ltr(5 Nos.) and 800 Ltr (1 Nos.) | 6 |
| 136 | Laying, glanding, lugging and termination of 3 X 1.5 Sqmm cable (FAS to JB) | 1000 |
| 137 | Balance erection and Commissioning of compressors , capacity : 800 CFM @ 7 bar | 2 |
| 138 | Servicing/overhauling/alignment/trial run of pumps | 18 |
| 139 | Complete Servicing of Duplex strainer including, suction/discharge valve assembly, replacement of water filter, gaskets,nut-bolts , etc. | 9 |
| 140 | Grouting of Duplex strainer | 9 |
| 141 | Painting of MS piping of complete DS system/DFDS system/PW/SW /Make up line etc. | 2000 |
| 142 | Erection of Pressure Regulating Unit (PRU) including In/Out process pipe connection, etc. | 4 |
| 143 | Erection of Flow Activation Switch (FAS) including In/Out process pipe connection, etc. | 14 |
| 144 | Erection of Spray bar with spray nozzle (3 Nozzle/Spray bar) | 57 |
| 145 | Erection of 32 NB GI pipe with accessories (elbow, valve, tee, socket, NRV etc.) for SW, PW, Airline. | 1400 |
| 146 | Erection of 20 NB GI pipe with accessories (elbow, valve, tee, socket, NRV etc. ) for ART air inlet line | 1100 |
| 147 | Erection of 15 NB GI pipe with accessories (elbow, valve, tee, socket, NRV etc. )for ART airinlet line | 1100 |
| 148 | Erection of various size of flange | 78 |
| 149 | Erection of Pressure guages with isolation valve | 20 |
| 150 | Erection of PVC flexible tube 15 nb | 100 |
| 151 | Erection of PVC flexible tube 20 nb | 100 |
| 152 | Erection of PRV safety for Air receiver tank | 7 |
| 153 | Erection of 400 Ampere capacity SFU draw out type Unilek make module with outgoing bus etc. all work for augmentation of LT module . | 1 |
| 154 | Erection of 80 NB GI pipe with accessories (elbow, valve, tee, socket, NRV etc. ) | 40 |
| 155 | Erection of 40 NB GI pipe with accessories (elbow, valve, tee, socket, NRV etc. ) | 40 |
| 156 | Removal / Repairing, erection and trial run of pump discharge casing (Make up pump-1) at DS pump house -1 | 1 |
| 157 | Erection of pump coupling (make up pump) | 2 |
| 158 | Cable laying of copper link for power JB to motor end (3 core X 95 sqmm copper flexible cable (8 Mtr. X 2 Nos.) including lugging, glanding, dressing, and termination etc. | 2 |
| 159 | Erection of 125 NB piping (including elbow,valve, tee, socket) | 90 |
| 160 | Erection of motor coupling | 8 |
| 161 | Erection of 65 mm NRV with flanges | 3 |
| 162 | Erection of 25 mm NRV with flanges | 1 |
| 163 | Erection of NRV at ART with flanges | 2 |
| 164 | Calibration, Erection and commissioining of Pressure switch at pump discharge | 18 |
| 165 | Erection of Sound proof Doors for repaired DFDS Compressor | 6 |
| 166 | Erection, setting and commissioning of RCC tank level switch | 2 |
| 167 | Erection of 50 NB piping (including elbow,valve, tee, socket) | 35 |
| 168 | Removal and erection of termination box for motor | 1 |
| 169 | Erection of 25 NB piping (including elbow,valve, tee, socket) | 165 |
| 170 | Erection of 65 NB piping (including elbow,valve, tee, socket) | 40 |
| 171 | Erection of Bib tap 15 NB | 13 |
| 172 | Erection of GI union 15 NB | 24 |
| 173 | Erection of 32 NB QRC (Quick Release Coupling) | 85 |
| 174 | Erection of Nozzle with adaptors. Capacity: 2 LPM,Working Pr. 4.5 Kg/Cm2 (WT Hopper) | 20 |
| 175 | Erection of Solenoide box cover with locking arrangement | 22 |
| 176 | Erection of Header bar | 8 |
| 177 | Erection of 50 mm NRV | 2 |
| 178 | Erection of Fan pulley or motor pulley | 4 |
| 179 | Erection of Grills | 50 |
| 180 | Erection of make up piece | 2 |
| 181 | Erection of below | 3 |
| 182 | Erection and commissioning of motor operated cirluar fire damper | 11 |
| 183 | Erection of safety pulley guard | 8 |
| 184 | Erection of CENTRIFUGAL FAN WITH MOTOR :- FAN CAPACITY-10000 CUM/Hr.MOTOR: 3.7 KW, 4 POLE,MOTOR STATIC PRESSURE-50 MMWG (WT-3 MCC) | 1 |
| 185 | Erection of Sprinkler and Globe valve | 36 |
| 186 | Erection & Commissioning of Main Air Receiver Tank at DSPH-1 including removal of old ART, grouting,fixing of PG,Drain valve, safety valve, In/Out process connection etc. | 1 |
| 187 | Removal and fixing of electrical components like indication lamp, handle, selector switch,push button etc in DS & Ventilation Electrical local panels. ( 1 Nos. = 1 Elect Local Panel) | 25 |
| 188 | Providing fan blade and replace it at Bunker floor DE system including providing & fixing of bearing, attending vibration problem, greasing etc. | 1 |
| 189 | Commissioning & PG test of complete (Including already erected & balance system) DS, DFDS, PW, SW, DE system in all respect. | 1 |
| 190 | Commissioning & PG test of complete (including already erected & balance system) Ventilation system as per bifurcation mentioned in Annexure-A2. | 11 |
| 191 | Supply and erection of FAN CANOPIES for tunnel exhaust fan | 6 |
| 192 | Erection of 32 NB gate valve (SW system) | 105 |