Tender For 5. Construction Of Day Care-Cum-Health And Wellness Centre At Alabola
Tender Value
30.92 Lakhs
Estimated cost
Bid Submission
14 Mar 2023
0 days left
EMD
30930
Bank guarantee accepted
Document Fee
6000
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
balikuda → Odisha
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
5. Construction Of Day Care-Cum-Health And Wellness Centre At Alabola Construction Of Day Care-Cum-Health And Wellness Centre At Alabola
BOQ
| Sl. No. | Item Description |
| 1 | Earth work in excavation of foundation trenches in all kinds soil within initial lead and lift including dressing and leveling the bed upto the required depth and depositing the excavated materials away from the working area etc.complete as per the specification and direction of the Engineer-in-charge. |
| 2 | Supplying, filling in foundation and plinth with sand including watering andramming with cost, conveyance, royality andtaxes of all materials and cost of labour with T&P required for the work etc. complete (Measurement will be taken on finished section only)as per the specification and direction of the Engineer-in-charge. |
| 3 | Cement concrete (1:3:6) in foundation and plinth using 4cm size black hard crusher broken granite stone metals of approved quality from approved quarry including lowering, laying, concrete watering and curing etc. complete inlcuding cost, conveyance, royality and taxes of all materials and cost of all labour with T & P required for the work complete as per the specification and direction of the Engineer-in-charge. |
| 4 | First class Fly ash Brick masonry usingbricks of size 25 cm. x 12 cm. x 8 cm. having crushing strength not less than 75 kg. Per. Sqr. Cm. in cement mortar of mix (1:6) with ordinary Portland slag cement(PSC) and screened & washed sand for mortar after immersing the bricks for 6 (Six) hours in water before use including splays cutting, circular moulding, corbelling, chamfering and similar such type of works, watering and curing etc. including cost, conveyance, loading, unloading, royalties and taxes of all materials, cost of all labour, scaffolding, sundries, T&P required for the works etc. complete in all respect as directed by the Engineer-in-Charge. In Foundation and Plinth |
| 5 | In Superstructure (G.Floor) |
| 6 | In Superstructure (F.Floor) |
| 7 | In Superstructure (S.Floor) |
| 8 | Cement concrete of proportion (1:2:4) using 12mm and down gradedsizecrusherbroken hard granite stone aggregates of approved quality and from approved quarry for CC road work including hoisting, lowering and laying concrete in position with proper packing and ramming by means of vibrator to proper slope to the required level ramming, watering, curing etc. complete including cost and conveyance royality taxes of all materials and labour with T&P required for the work etc. complete i as per direction of the Engineer-in-charge. |
| 9 | R.C.C work M-20using 20mm and down graded black hard crusher broken granite stone chips including hoisting and laying and compacting concrete by using vibrator with watering and curing for 28 days, centering and shuttering and finishing the exposed surface smooth providing grooves or beads where ever necessay including cost, conveyance, royalties and taxes of all materials and cost of all labour with T&P required for the work etc. complete in all respect but excluding cost of M.S.Rods or Tor Steel and binding wires and labour charge for bending binding and tying the grills etc.complete in all respect as per the specification and direction of the Engineer-in-charge. (Column footing) |
| 10 | Plinth band |
| 11 | Lintel(G.Floor) |
| 12 | Lintel (F.Floor) |
| 13 | Column & beam (G.Floor) |
| 14 | Column&beam (F.Floor) |
| 15 | RCC Chajja (G.Floor) |
| 16 | RCC Chajja (F.Floor) |
| 17 | Roof Slab, Landings, Balconies, Projections, Sunshades (G.Floor) |
| 18 | Roof Slab, Landings, Balconies, Projections, Sunshades (F.Floor) |
| 19 | Stair Case (G.Floor) |
| 20 | Stair Case (F.Floor) |
| 21 | Providing HYSD bar reinforcement for R.C.C. work including Straightening, cutting, bending, binding, welding, tying the grills, laying and placing in proper position as per approved design and drawing including cost, conveyance of 18 to 20 gauge binding wire, cost and conveyance of HYSD bars of Fe 500D complete in all respect as per the specification and direction of the Engineer-in-charge. (G.Floor) |
| 22 | First Floor |
| 23 | Providing 6mm thick cement plaster (1:4) to RCC surface finished smooth including closed deep chipping & slurry treatment including all cost of the materials carriage royalty all taxes & all labour, cess involved for completion of item work as per the direction of EIC. (G. Floor) |
| 24 | F.Floor |
| 25 | 12mm thick cement plaster in cement mortar (1:6) finished smooth to outside surface of brick walls after racking out joints including watering and curing with cost, conveyance, royaltyand taxes of all materials with cost of all labour, T&P etc. required for the work complete as per the specification and direction of the Engineer-in-charge. (G. Floor) |
| 26 | F. Floor |
| 27 | S. Floor |
| 28 | 16mm thick cement plaster in cement mortar (1:6) finished smooth to inside surface of brick walls after racking out joints including watering and curing with cost, conveyance, royaltyand taxes of all materials with cost of all labour, T&P etc. required for the work complete asper the specification and direction of the Engineer-in-charge. (G. Floor) |
| 29 | F.Floor |
| 30 | S.Floor |
| 31 | 12mm thick cement plaster (1:4) finished smooth to cement punning brick walls after raking out the joint including watering and curing with cost and conveyance of all materials and labour with T&P required for the work with all taxes and royalities etc. complete in all respect in all floors & as per direction of Engineer-in-Charge. |
| 32 | Supply fitting and fixing vetrified floor tiles in floor600mmx600mm printed / coloured series trade on steps and landing on 25mm thick bed of cement motar (1:1) joint with net cement slury mixed with pigment to watched and shade of the tile including rubbing & policying etc. as per direction of Engineer-in-charge. (G. Floor) |
| 33 | F.Floor |
| 34 | Supply fitting and fixing vitrified tiles in wall on 12mm thick bed of cement motar (1:1) joint with net cement slury mixed with pigment to watched and shade of the tile including rubbing and policying etc as per directin of the Engineer-in-Charge (G. Floor) |
| 35 | F. Floor |
| 36 | Providing fitting & fixing of Chequred tiles of approved quality & desing in floors on 12mm thick bed of cement mortar (1:1) joint with neat cement slury mixed with pigment to match the shade of tile including polishing, rubbing etc.complete. Ground floor |
| 37 | F.Floor |
| 38 | Supply fitting and fixing Granite tiles above 0.10 sqm & upto 0.40 sqmin walls, dados & skirting on 12mm thick bed of cement motar (1:3) joint with net cement slury mixed with pigment to watched and shade of the tile including rubbing and policying etc as per directin of the Engineer-in-charge. (G Floor) |
| 39 | F.Floor |
| 40 | 20mm thick grading plaster with cement mortor (1:4) over roofslab after chipping & chiseling the same & clearing the surface by wire brushing laid to proper slope finishing smooth to receive for tarfelt, treatment, watering & curing including cost & conveyance of all materials & labour, cess with T & P required for the work with all taxes & royalties etc complete in all respect in all floors & as per direction of Engineer-in-charge. (G Floor) |
| 41 | Painting two coats with approved paint on new wood & Iron work over coat of primer etc. with enalmel paint including cost of all materials with taxes, all labour, scaffoldings, sundries T&P etc complete as per direction of the Engineer-in-charge as per approved specification of Engineer-in-charge. (F Floor) |
| 42 | S.Floor |
| 43 | Distempering two coat over the including cost of distemper costconveyance and all taxes of all materials and labor withT&P required for the work etc.complete in all respect etc. complete as per direction of Engineer-in-charge. (G Floor) |
| 44 | F.Floor |
| 45 | Painting 2(Two)coats with any approved water proofing cement paint with brush to outside wall surface after cleaning surface including cost of paint watering and curing cost conveyance and taxes of all materials and labour, cesswith T&P required for the work etc .complete in all floors as per direction of Engineer-in-charge. (G Floor) |
| 46 | F.Floor |
| 47 | Finishing wall to Painting 2(Two) coats with any approved weather coat paint with brush to outside wall surface after cleaning surface including cost of paint watering and curing cost conveyance and taxes of all materials and labour with T&P required for the work etc .complete as per direction of Engineer-in-charge. (G Floor) |
| 48 | F.Floor |
| 49 | Finishing wall surface with Acrylic wall putty (water based) of approved make and finished smooth and even surface to receive paintingincluding cost of scaffolding staging charges with cost of all material, taxes, cess, labour, T&P etc. complete as per Engineer-in-charge. (G Floor). |
| 50 | F.Floor |
| 51 | Supplying, fitting & fixing of M.S. iron doors & windows choukath with shutter & flat & angel frames grill made out of M.S. flat grill gate made out of iron etc.complete as per Engineer-in-charge. (G Floor) |
| 52 | Door First Floor |
| 53 | Windows Grill G. Floor |
| 54 | Windows grill First Floor |
| 55 | Providing fitting fixing of Aluminum framed glazed louvers with all cost of labour T&P, hire charges of drill machine , labour charges etc complete as per ditection of the Engineer-in-charge. (G Floor) |
| 56 | F.Floor |
| 57 | Supplying, fitting & fixing in position of stainless steel of 304 grade in hand railling using 50mm dia of 12mm thick circular pipe with balustrade of size 32mm x 32mm x 2mm @0.90 mtr C/C & stainless square pipe bracing of size 32mm x 32mm x 2mm in 3 Rows in staircase as per approved designincluding cost , conveyance, royalties & taxes of all materials labour, cess T & P required for the work to complete in all respect in al floors etc. as per direction Engineer-in-charge. (G Floor). |
| 58 | F.Floor |
| 59 | Supplying, fitting & fixing of big size trafford A.C. sheetin roof including fixing of ridges wind tiles etc.complete including drilling holes n wind tiles andcost of all materials, labour, T & P etc. complete as per Engineer-in-charge. (G Floor). |
| 60 | Supplying, fitting & fixing of glazed alluminium framed openable door & windows using 15 micron anodizedOELof aluminium section 9202 as out section 9201 as top 9200 as a shuttrt section frames with tapered clip of section 4660 with 6 mm black glassetc. complete including cost conveyance taxes of royalities of all materials and cost of all labour T&P required for the work etc. complete as per the direction of Engineer-in-charge. (G Floor) |
| 61 | F.Floor |
| 62 | Supplying, fitting & fixing of Iron work wrought & put up in truses & record racks on position with all laboour etc complete in all respect including cost, conveyance, royalty, cess & taxes of all materials & labour, cess with T&P etc complete as per specification & direction of the Engineer-in-charge. |
AI Tender Summary
Tender Timeline
Feb 27, 2023
11:30 IST
Tender Published
Tender notice published.
CompletedMar 14, 2023
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedMar 15, 2023
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender