Drinking Water Supply and Sanitation Boards / Undertakings / PSU Closing in 0 days TDR #36460438

Renovation And Upgradation Of Electric Feeder System And Water Outlet System Of Clarifier No.5 At 2Nd 40Mgd Plant At Wazirabad Water Works.

Issued by Boards / Undertakings / PSU · wazirabad, Delhi
Tender Value
Ref. Documents
Estimated cost
Bid Submission
02 Mar 2023
0 days left
EMD
16500
Bank guarantee accepted
Document Fee
500
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
wazirabad → Delhi
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Renovation And Upgradation Of Electric Feeder System And Water Outlet System Of Clarifier No.5 At 2Nd 40Mgd Plant At Wazirabad Water Works.

BOQ

Name of Work: Renovation and upgradation of Electric feeder system and water outlet system of clarifier no.5at 2nd 40MGD Plant at Wazirabad Water Works.
Sl. No. Item Description
1Supply of 4 X 10 sq. mm PVC insulated & PVC sheathed/XLPE aluminum armored conductor 650/1100 voltage grade cable confirming to IS: 7098 (Part-I) 1988.Make: Grandlay/Gloster/DJB Approved.
2Supplying and making end termination with brass compression gland and aluminum lugs for following size of PVC insulated and PVC sheathed/XLPE aluminum conductor cable of 1.1 KV grade as required.4 X 10 sq. mm (25 mm)
3Excavation of well near the entry point of main feeder cable of clarifier of about the size of 6X6’X18’ by hydraulic/manual means by taking all the precautions for the working personals and other structures nearby. This includes getting out the excavated earth and refilling after execution of the cable replacement work. This also includes dismantling of G.I. Pipe of the feeder cable from the bend in the bottom of the excavated well and making of new G.I. bend arrangement for fixing of new G.I. Pipe in the bend.
4Arrangement of all safety equipment for the protection of staff to work at height of clarifier and in the deep well outsidethe clarifier such asSafety belts, safety shoes, gloves, helmets etc. as per site requirement.
5Arrangement of plates, balli, plankls, chain block, chains etc. and making arrangement of temporary support for walls in the excavated well, so that workers can work safely in the well.
6Removal of old cable from the G.I. pipe, below the clarifier’s bottom surface with the help of heavy manual labour/Chain pulley block and cleaning of M.S. pipe with the help of rust removal and withwater pressure.
7Drawing of new 4 X 10 sq. mm PVC cable in the existing G.I. underground pipe, below the clarifier’s bottom surface with the help of Heavy manual labour/Chain pulley block etc in very cautionary manner to prevent the cable of any damage/harm.
8Supplying and laying 6 SWG G.I. wire in double running(80mtrs. approx.) in the existing 100 mm dia. G.I. pipe below the clarifier structure along with new feeder cable for supporting the cable at the time of drawing and for earthing purpose, including connection/ termination with GI thimble etc. as required.
9Providing and fixing of 100 mm Dia. G.I. pipe of 18 feet on the new G.I. bend in the excavated well for drawing of 4 X 10 sq. mm PVC cable & 6 SWG G.I. wire through it up to the ground level. This includes making connection of cable to the existing MCB box, installed outside the clarifier. The cable from the 100 mm dia. G.I. pipe upto the MCB box should be drawn through G.I. pipe of 50 mm dia.
10Providing & Fixing of slipring with complete carbon bush set by using of nut bolts (as per existing). Making of connection of the cable on the new slipring and from slipring to the control panel of the flocculator and Bridge.
11Earthing with copper earth plate 600 mm X 600 mm X 3 mm thick including accessories, and providing masonry enclosure with cover plate having locking arrangement and watering pipe of 2.7 metre long etc. with charcoal/ coke and salt as required.
12Supplying and laying 25 mm X 5 mm G.I strip at 0.50 metre below ground as strip earth electrode, including connection/terminating with G.I. nut, bolt, spring, washer etc. as required.(Jointing shall be done by overlapping and with 2 sets of G.I. nut bolt & spring washer spaced at 50mm).
13SITC of modular/ combinable polycarbonate insulated outdoor type feeder panel housing,shock proof, weather proof, rust proof, UV resistant, halogen free, silicone free, corrosion proof, protection class: II safe, IP 65 according to IEC 61 439-2, IEC 60 999, DIN EN 50 262, DIN 43 880, IEC 60 529/ DIN VDE 0470 Teil 1 totally insulated, having internal embedded gasket with provision of cable entry through glands.The panel board should have following control panel MCB and accessories etc complete with connections & Interconnections etc as required.Note 1: For mounting of meters, indicating lights & push button only box with hinged door with triangular lid to be used. Note 2: For mounting of 5 HP DOL starter MS angle frame should be hot dipped galvanized and made out of MS angle of size 35 X 35 X 5 mm with all required material/arrangement as per site requirement. The Panel should consist of the followings:- (a) 18 A, TP, power contactor (MNX 18, L&T) - 1 No(b) 1 NO + 1 NC side mounting add - on aux. contact block (L&T) - 1 No. (c) 6 - 10 A thermal over load relay (L&T) - 1 No. (d) Single phasing preventer (L&T) - 1 No.(e) 16 A, FP, 10 kA, MCB (L&T) - 1 No(f) LED indicating lights red, Yellow,Blue & green (L&T) - 6nos.(g) Push Button with element (L&T) - 2 Nos.(h) 6 A SP MCB (L&T) - 1 No. (i) 32 A, 3 way open connector - 1 No. (j)Digital 3 phase VAF meter (L&T)- 1 No.(k) 50/ 5 A, 5 VA, 5.0 class current transformer (AE)- 3 No.
14Laying of 4 X 10 sq. mm cable upto both the starter panels of flocculator and bridge with the help of M.S.Clamps under the Clarifier bridge structure by following all the precautions and safety manual as the work is to be carried out at height about 20 feet.
15Testing and Commissioning of the complete system for satisfactory operation.
16Dismantling of old damaged existing v-notch from the inner circumference of launder wall approx. 130 mtrs. by removing/cutting of all nut bolts with the help of gas cutter and taking out from the clarifier by manual labour.
17Fabrication and supply of M.S v-notch made out of M.S Sheet of size 200X1000X6mm thick around the inner periphery of approx. 130 mtrs. including cutting the v-notch on MS Sheet by using CNC machine/ laser machine as per existing design.
18Making the platform around the circumference of inner side of clarifier by using the all safety measures for fixing/ grouting the bolt and ”v” notches at height of 16 feet approx. from the pit of clarifier.
19Groutingof foundation bolt in RCC structure around the launder Wall by using the heavy drill machine / manual labourincluding Cost of nut bolt/fasteners/mechanical clamp etc. on circular launderwall forfixing of the v-notches on it.
20Fixing of v-notches along the circumference of launder wall with the skilled manual labour on the grouted nut-bolts/fasteners etc. including washer by using tools and tackles etc.
21Painting of complete v-notches by using 2 coats of metal primer & black Bituminous anticorrosive paint of reputed brand.Make-Asian/Berger/Nerolac.

AI Tender Summary

OUR REF NO 36460438
AUTHORITY Boards / Undertakings / PSU
TENDER VALUE Ref. Documents
LAST DATE 02-03-2023
Authority
Authority Name Delhi Jal Board
Work Description Renovation And Upgradation Of Electric Feeder System And Water Outlet System Of Clarifier No.5 At 2Nd 40Mgd Plant At Wazirabad Water Works.
Basic Detail
Tender No NIT21(2022-23)
Bidding Type Tender
Location
City wazirabad
State Delhi
Key Dates
Publish Date 24 Feb 2023
Submission Date 02 Mar 2023
Open Date 02 Mar 2023
Finance
Tender Value Ref. Documents
Tender Fee 500
EMD 16500
Exemption Not Available
Document List
a7857824-b5d0-49a5-87da-5b680d5f2f89.html
BOQ_308977.xls
NIT21.1.pdf
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Feb 24, 2023
11:30 IST

Tender Published

Tender notice published.

Completed
Mar 02, 2023
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Mar 02, 2023

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

a7857824-b5d0-49a5-87da-5b680d5f2f89.html

xls

BOQ_308977.xls

1

NIT21.1.pdf

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders