Schedule Of Rates & Quantum Of Works For Increasing Capacity Of Transformer Sfrom63 Kva To 100Kva& 100Kva To 250 Kva At Difference Places & Villages In Geographical Area Of Gram Panchayat Naseerabad Salon And Replacment Of Jarjar Pcc Poles & Replacenment
Tender Overview
Project Description
Schedule Of Rates & Quantum Of Works For Increasing Capacity Of Transformer Sfrom63 Kva To 100Kva& 100Kva To 250 Kva At Difference Places & Villages In Geographical Area Of Gram Panchayat Naseerabad Salon And Replacment Of Jarjar Pcc Poles & Replacenment Of Old / Jarjar Conductor Under Executive Engineer, Electricity Distribution Division- Salon, Raebareli.
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 27-Feb-2023 | date | Date | 02-Mar-2023 |
BOQ
| Sl. No. | Item Description |
| 1 | CORTAGE OF STOR ITEMS FROM ESC TRIPULA RAEBARELI TO DUMP SITE AND DUMP SITE TO WORK SITE& SCRAP MATERIALS FORM SITE TO STORE CENTRE TRIPULA RAEBAREIALONGWITH LOADING UNLOADING AND PROPER STACKING:- |
| 2 | 250 KVA T/F (2 Nos) & 100 KVA T/F (01 No.) from Electricity Store Centre Tripula Raebareli to work site, Raebareli, alongwith loading unloading, |
| 3 | Recd. back of old & Used 63 KVA T/F (01 No.) & old used 100 KVA T/F (02 No.) from work site to ESC Tripula, Raebareli after dismantling of T/F from D/Pole/Four Pole Structure/ Plinth, alongwith loading unloading, As per Estimate. |
| 4 | 8.5 Mtr long PCC Pole. |
| 5 | Loose line material including ACSR/RABBIT/AB CABLE/XLPE Cable/ weasel Conductor, Pin Insulators, Disc Insulatos, Top Channel, Stay Set, Disc Fitting 45/70 KN (T&C), Stay Clamp, 11KV F Clamp, V type Cross Arm, Disc Insulators, Stay Wire, SS Base Angle, Earthing Rod, Holding Clamp, T-Off Channel, G.I. Wire 6 SWG, Dropper Channel, Holding Clamp, F Clmp, LT Shackel Insulators, PVC Armed Cable (2X4mm). 3200 mtr. and other remaining items, as per estimate. |
| 6 | LABOUR AND ERRECTION CHARGES:- |
| 7 | Errection of PCC Pole including dragging with Fitting of all accessories as per RESPO Norms. |
| 8 | Grouting of PCC Pole with grouting materials including digging of Pole to pit side as per RESPO Norms. |
| 9 | Digging of Pits, fixing nozzling & grouting of Stay Rod inclucing fitting of all accessories with grouting materials as per RESSPO Norms |
| 10 | Laying , stringing & sagging of HT & LT Lineby DOG/AAAC/ ACSRweasal / RABBITconductor/AB Cable including all associated work & making clearance of Road with Joint/jumpers & binding on insulators as per Estimate. |
| 11 | Laying , stringing & sagging ofLT Lineby AB Cable including all associated work & making clearance of Road with Joint/jumpers & binding on insulators as per Estimate. |
| 12 | Earthing of Polewith Complete fittings.as per RESPO norms. |
| 13 | Fabrication of Line materials like \"V\" type X-arm/Top Channel/T off Channel/M.S. Channel/ M.S. Angle/Gaurding Angle and other misc work, as required, |
| 14 | Making / Mounting/Installation of \"T\" off Channel with Complete fittings. |
| 15 | Making / Mounting/Installation of new 11 KV X-Armswith Complete fittings. |
| 16 | Making / Installation of Poly Disc Insulator 45 KN T&Cwith Complete fittings. |
| 17 | Making / Mounting/Installation of L.T.D.P. Three Phasewith Complete fittings. |
| 18 | Making / Mounting/Installation of 11 KV Composit Polymer Pin Insulatorswith Complete Fitting.. |
| 19 | Making / Mounting/Installation of \"V\" Type 11 KV Cross Arms with Complete Fitting. |
| 20 | Making / Mounting/Installation of LTMS Clamp for PCC Pole with Complete Fitting. |
| 21 | Making / Mounting/Installation of Holding Clamps for PCC Poles with Complete Fitting. |
| 22 | Making / Mounting/Installation of 11 KV \"F\" Clampfor PCC Poles with Complete Fitting. |
| 23 | Making / Mounting/Installation of PG Clamps for PCC Poles with Complete Fitting. |
| 24 | Making / Mounting/Installation of Stay Set with Complete Fitting. |
| 25 | Making / Mounting/Installation of Stay Insulators with fittings. |
| 26 | Making / Mounting/Installation of PG Clamps for PCC Poles with fittings. |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.