Name of Work: “Providing and Installation of Lighting arrrangement for the project Four/Six laning from Km 132.375 to Km 153.058 (total new alignment length of 20.683 Km) of Daboka Dimapur Section of NH-36 & 39 in the state of Nagaland under SARDP-NE, Package-Dimapur Bypass at \"Risk & Cost\" of EPC Contractor\"
Sl. No.
Item Description
1
PUP with Service Road (RCC Crash Barrier)-Main Carriageway (Street lighting) 210W (Double Arms)
2
PUP with Service Road (RCC Crash Barrier)-Below Structure (LED light) 100W
3
Flyover with Service Road (RCC Crash Barrier)-Main Carriageway (Street lighting) 210W (Double Arms)
4
Flyover with Service Road (RCC Crash Barrier)-Below Structure (LED light) 100W
5
CUP with Service Road (RCC Crash Barrier)-Main Carriageway (Street lighting) 210W (Double Arms)
6
CUP with Service Road (RCC Crash Barrier)-Below Structure (LED light) 100W
7
CUP with Service Road (RCC Crash Barrier)-Main Carriageway (Street lighting) 210W (Double Arms)
8
CUP with Service Road (RCC Crash Barrier)-Below Structure (LED light) 100W
9
Major Junction60W (Single Arms)
10
Patkai College Junction 60W (Single Arms)
11
Junction 60W (Single Arms)
12
Junction 60W (Single Arms)
13
Junction 60W (Single Arms)
14
Junction 60W (Single Arms)
15
Junction 60W (Single Arms)
16
Passenger shelter 60W (Single Arms)
17
Passenger shelter(Bus Stop) 60W (Single Arms)
18
Median opening (Solar Blinker)
19
Median opening (Solar Blinker)
20
Median opening (Solar Blinker)
21
Median opening (Solar Blinker)
22
Maintenance for 4 years @50% [5% for 1st year, 10% for 2nd year, 15% for 3rd year & 20% for 4th year]
23
Additional 5% for connections (For Double arms street lighting)
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.