South Eastern Coalfields Limited-SECL has published Tender For Survey, Planning, Designing, Drawing, Construction And Development Of Eco Park At Gevra Area, Including 05 (Five) Years Comprehensive Operation And Maintenance Work On Turnkey Basis. (3Rd Call). Submission Date for this Tender is 13-03-2023. Survey Works Tenders in korba Chhattisgarh. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Preparation of conceptual, architectural design of Eco Park including the model for Eco park along with drawing and design of various structures, lawns, gates, chess garden, yoga garden, Oxygen Park, Miyawaki Forest, different photo points, sculptures of different animals, different signages, different mural works, toy train, Chess sculptures, Musical Fountain, Water Body etc. as enlisted in the Technical Specification and Scope of Work. |
2 | Cleaning of Site, levelling of site, filling of Earth and Good Earth as per approved topography, levels and contours, all as per instruction of Engineer-in-charge. |
3 | Boundary Wall Construction of Boundary wall 1.80 M high with RCC Frame Structure and Fly ash brick work, all around the eco park except gates, with concertina Fencing 0.6 m dia over the boundary wall. The approximate length of Boundary Wall is 2650.00 meter. |
4 | Electric Connection, Electric room Construction of electrical equipment room, DG room with DG Set of approved capacity and other ancillary rooms for eco park along with electrical connection from the nearest source as provided by SECL. |
5 | Bore Well Digging of borewell of required number along with standby borewell as per the requirement of eco park of required depth, dia including providing & Fixing of submersible pump, casing pipe, panel boards and other ancillary units as per requirement for borewell. Minimum 06 (Six) nos of borewell to be dug, the yield, the size of casing pipe, the depth of borewell should fulfil the water requirement of Eco Park. |
6 | Drinking Water (2 unit) Construction of two nos of water ATMs for eco park as per approved drawing, design and capacity. |
7 | Toilet Block Construction of 07 Nos. of male and 07 nos of female toilet blocks for eco park of approved design including necessary water supply and sanitary fittings, hand driers, tissue paper dispenser, all of highest quality to be approved by engineer in charge including construction of sewage and water supply lines, chambers and Septic Tanks. Minimum Area of Each toilet block should be 64.00 Sq Meter. |
8 | Micro irrigation (Drip irrigation, popup, sprinkler, pipeline ,filters etc.) Construction of micro irrigation systems for eco park including providing and fixing GI pipe lines, drip irrigation system, filters, stand posts, sprinklers of required flow, so as to cover the entire area of eco park including stand by arrangements so that at no point of time there will be shortage of irrigation water for eco park. |
9 | Paver block curving Providing and laying factory made chamfered edge Cement Concrete paver blocks in footpath, parks, lawns, drive ways or light traffic parking etc, of required strength, thickness & size/ shape, made by table vibratory method using PU mould, laid in required colour & pattern over 50mm thick compacted bed of sand, compacting and proper embedding/laying of inter locking paver blocks into the sand bedding layer through vibratory compaction by using plate vibrator, filling the joints with sand and cutting of paver blocks as per required size and pattern, finishing and sweeping extra sand. complete all as per direction of Engineer-in-Charge :60mm thick cement concrete paver block of M-35 grade with approved colour, design & pattern. Minimum Area of Paver Block shall be 9155 sqm. |
10 | All Plantations (block plantation and ornamental etc.) Plantations of sizes to be approved by EIC, as perTechnical Specification and Scope of Work. |
11 | Main Gate Main Gate as per drawing, Technical Specification and Scope of Work. |
12 | Water Body Development of Water Body as per Technical Specification and Scope of Work. |
13 | Mist Forest Development of Mist Forest as perTechnical Specification and Scope of Work. |
14 | Butterfly Garden Development of Butterfly Garden as perTechnical Specification and Scope of Work. |
15 | Lawn Garden Development of Lawn Garden as per Technical Specification and Scope of Work. |
16 | Maze Garden Development of Maze Garden as perTechnical Specification and Scope of Work. |
17 | Palmatum Development of Palmatum as perTechnical Specification and Scope of Work. |
18 | Vermicompost, Pesticide, Insecticide etc. To be given as per requirement in lawns and in all plantation inside eco park for present and future requirements. |
19 | Electric pole, cables, light and high mast Street Lighting in Eco Park - illumination level is to be maintained as per CPWD specification, as perTechnical Specification and Scope of Work. |
20 | Seating arrangements Seating arrangement of approved design and seats as perTechnical Specification and Scope of Work.- Minimum 100 nos. |
21 | Gazebo (Cement) Gazebo made out of approved material as per details Technical Specification and Scope of Work. - minimum 15 nos. |
22 | Childern play area Providing & Fixing Children Play equipment Kit made up of FRP of approved quality with Special rubberized coating on swing chain to prevent fatal injuries, all FRP materials should be approved quality and Indian Standard, including Transportation, fitting with necessary excavation & CC 1:2:4, curing, Colour etc,as Per Direction by Engineer In charge. In respect of play equipment which are not available made up of FRP material, ISI marked GI Pipe with approved painting may be used, all as per instruction of engineer in-charge. Equipment are to be provided as per Technical Specification and Scope of Work. |
23 | Open Gym Providing & Fixing Open Gym equipment’s Kits With Thick Galvanized Main Post of 114 mm diameter of ISI quality with color, Thickness of sub pipes varies between 3.5 mm to 7.5 mm, with epoxy coating of at list 100 micron to prevent any damage from weather conditions, with self-lubricating approved bearing for maintenance free usage and reinforced foot pedals for extended life, and J hook system with 18 mm thickness used for grouting for stability and ease of installation and non-fading virgin LLDPE makes all plastic components sun fad resistant, all open ends of pipe either sealed in or closed by GI/LLDPE cap for user safety OUT DOOR FITNESS EQUIPMENTS. Including all tax, Transportation, fitting and other miscellaneous. As per Direction by Engineer in charge. Equipment are to be provided as perTechnical Specification and Scope of Work. |
24 | Different Gardens Development of Different Garden as perTechnical Specification and Scope of Work. |
25 | Service gate (2 unit) Minimum 02 Nos of Service Gates are to be provided at the entrance to the eco park, as perTechnical Specification and Scope of Work. |
26 | Chess Garden Size of each blockshall be 1 m x 1 m with kings, queens structures etc., white and black blocks of granite stone of approved quality as per approval of EIC. To be provided as perTechnical Specification and Scope of Work. |
27 | Oxygen Park (lungs shape) with civil work Development of Oxygen Park (lungs shape) with civil workas perTechnical Specification and Scope of Work. |
28 | Miyawaki Forest Development of Miyawaki Forestwith civil workas perTechnical Specification and Scope of Work. |
29 | Cactus Garden Development of Cactus Garden with civil workas perTechnical Specification and Scope of Work. |
30 | Wooden Look Ferro Cement Boundary Development of Wooden Look Ferro Cement Boundary as perTechnical Specification and Scope of Work. |
31 | Different photo point Providing and fixing of Different photo point for eco park as perTechnical Specification and Scope of Work. |
32 | Termites Cross Section Termites Cross Section are to be provided as perTechnical Specification and Scope of Work. |
33 | Honey Comb Honey Comb are to be provided as perTechnical Specification and Scope of Work. |
34 | Different Sculptures Different Sculptures are to be provided as perTechnical Specification and Scope of Work. |
35 | Mist Tunnel Sculpture Mist Tunnel Sculptures are to be provided as perTechnical Specification and Scope of Work. |
36 | Signage Signagesare to be provided as perTechnical Specification and Scope of Work. |
37 | All Mural work All Mural work are to be provided as per Technical Specification and Scope of Work. |
38 | Butterfly life cycle Butterfly Life Cycle are to be provided as perTechnical Specification and Scope of Work. |
39 | Chess Sculpture Chess Sculpture are to be provided as perTechnical Specification and Scope of Work. |
40 | Both Side Sculpture for Gate Both Side Sculpture for Gate are to be provided as perTechnical Specification and Scope of Work. |
41 | Inauguration plate & Information map Inauguration plate & Information map are to be provided as perTechnical Specification and Scope of Work. |
42 | Toy Train Toy Train is to be provided as perTechnical Specification and Scope of Work. |
43 | Fountains (01 Musical Fountain with light and sound show and 02 other fountains) 03 nos. Fountains are to be provided as perTechnical Specification and Scope of Work. |
44 | Operation and Maintenance of Eco Park for a Period of 05 (Five) Years. |
45 | Total impact of GST for the purpose of CTC |