Water Corporation of Odisha-WATCO has published Tender For Provision For Automation Of 55 Mld Wtp With Pumping Station Under Rourkela For 24 X 7 Water Supply. Submission Date for this Tender is 10-03-2023. Pump Supply Tenders in rourkela Odisha. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 01-Mar-2023 | Corrigendum | Date | 10-03-2023 |
2 | 03-Mar-2023 | 2nd Corrigendum | Other | 10-03-2023 |
Sl. No. | Item Description |
1 | Supplying all material, labour and T&P with installation & commissioningof Pressure Transmitter-10 bar,2 wire 24 volt DCincluding Snuber,needle valve, SS-316 tubing from PT to PLC Panel in the delivery header of pump set including all cost, taxes and transportation etc all complete as per direction of Engineer-in-charge. Intake Well |
2 | Supplying all material, labour and T&P with installation & commissioningof Pressure Transmitter-10 bar,2 wire 24 volt DCincluding Snuber,needle valve, SS-316 tubing from PT to PLC Panel in the delivery header of pump set including all cost, taxes and transportation etc all complete as per direction of Engineer-in-charge (Clear water Pump House at WTP) |
3 | Supplying all material, labour, T & Pinstallation & commissioning of Rader Based 24 based Level Transmitter,24 volt DC,Output 4 to 20 MAP range-0 to 8m for Storage Reservoir & 0-20m at intake well including all cost, taxes and transportation etc all complete as per direction of Engineer-in-charge. |
4 | Supplying all material, labour, T & Pinstallation & commissioning with all accessories with replacement of valves includingnuts,bolts etcwithactuator of e-pack 12 series forReplacement of existing manually operated to multi-Turn 3ph, 415V AC Actuator operated valve for remote controlincluding all cost, taxes and transportation etc all complete as per direction of Engineer-in-charge. |
5 | Intake Well Pump House |
6 | 400mm dia gate valve ofrising sppindle with gear box |
7 | Clear water Pump House |
8 | 400mmdiagate valve ofrising sppindle with gear box with MOV |
9 | 400mmdiagate valve ofrising sppindle with gear box &feed back switch (Manual) |
10 | Supplying all material, labour, T & Pinstallation & commissioningfor PLC compatable MV FCMA Panel, 5KVA (UPS +AUX) Hitachi Highrail Make with for Delivery Pumpincluding all cost, taxes and transportation etc all complete as per direction of Engineer-in-charge. Fully Automated FCMA line side MV soft starter with main vaccum circuit breaker with programmable motor protection relay, surge supressor, current & voltage transformer for 125KW motor & with UPS+ AUX (4KVA, 3Phase) Hitachi highrail with 17 nos 100 ah Battery (1N+1S)( Intake Well & WTP). |
11 | Supply, Installation & testing of OFC Cable (12 Core with steel wire, Pre Fabricated Junction Box in every interval of 200 mtr) under 40mm dia. HDPE pipe along the cable trays, trench or fixing to wall with suitable clamps as per site in charge etc complete. |
12 | Supplying all material, labour, T & Pfor Rader Based FLOW TRANSMITTERincluding all cost, taxes and transportation etc all complete as per direction of Engineer-in-charge |
13 | Flow 3.3 m range transmitter, Housing-UPVC, Wetted materials-UPVC, Hart enable with mounting bracket Open channel Flow Transmitter (Near Aeriator) |
14 | Supplying all material, labour, T & Pfor pH TRANSMITTERincluding all cost, taxes and transportation etc all complete as per direction of Engineer-in-charge (Make E&H,Trios,Chemipech,Hach) |
15 | WTP |
16 | Online PH (0-14ph) |
17 | Clear Water |
18 | Online PH (0-14ph) |
19 | Supplying all material, labour, T & Pfor TURBIDITY METERincluding all cost, taxes and transportation etc all complete as per direction of Engineer-in-charge (Make E&H,Trios,Chemipech,Hach) |
20 | Range0-100 NTU, Transmitted light principle,Resolution-0.001 NTU, Repeatability-Better than 1% span, Pressure-3 Bar, Accuracy-+/- 0.2% of reading,Controller shall be panel mounted type, It shall have De-Bubbler chamber. |
21 | WTP |
22 | Online Turbidity (0-3000 NTU) |
23 | Clear Water |
24 | Online Turbidity (0-100 NTU) |
25 | Supplying all material, labour, T & Pfor RESIDUAL CHLORINE ANALYSERincluding all cost, taxes and transportation etc all complete as per direction of Engineer-in-charge (Make E&H,Trios,Chemipech,Hach) |
26 | Clear Water |
27 | Free Residual Chlorine (0-20PPM(mg/I) |
28 | Dosing PUMP SET (Positive displacement) SAPA TOOLS (LIME) 3 PHASE |
29 | Dosing PUMP SET (Positive displacement) SAPA TOOLS (ALUM) 3 PHASE |
30 | Dosing PUMP SET (Positive displacement) SAPA TOOLS (PAC) 3 PHASE |
31 | VFD for Chemical house panel for all dosing pumps |
32 | Level switch for alam mixing tank |
33 | Supplying all material, labour, T & P for Loss Of Head TRANSMITTERincluding all cost, taxes and transportation etc all complete as per direction of Engineer-in-charge |
34 | Two indical Electrodes with weather proof Transmitter, 6 digits LCD display, 5 Nos SS needle valves, PVC tube,Sc angle. |
35 | FILTER BED |
36 | LOH Meter |
37 | Supplying all material, labour, T & P for Rate Of Flow TRANSMITTERincluding all cost, taxes and transportation etc all complete as per direction of Engineer-in-charge |
38 | Two indical Electrodes with weather proof Transmitter, 6 digits LCD display, 5 Nos SS needle valves, PVC tube,Sc angle. |
39 | FILTER BED |
40 | ROF Meter |
41 | Level Switch for wash water over head tank |
42 | Supplying all material, labour, T & Pinstallation & commissioning with all accessories with replacement of valves includingnuts,bolts etcwithactuator of e-pack 12 series forReplacement of existing manually operated to multi-Turn 3ph, 415V AC Actuator operated valve for remote controlincluding all cost, taxes and transportation etc all complete as per direction of Engineer-in-charge. (FILTER BED)300mm to 350mm |
43 | Valve 350mm(2 X10) |
44 | Valve 300mm(2 X10) |
45 | Gate (400 X 400) (1 X 10) |
46 | Mushroom Valve 400 mm Dia (1 X 10) |
47 | Air Wash 150 mm Dia (2 X 10) |
48 | Supplying all material, labour, T & Pfor MAGNETIC FLOW METERincluding all cost, taxes and transportation etc all complete as per direction of Engineer-in-charge of E & H,Krone,Forbes Marshal,Bermad. |
49 | Clear Water |
50 | Flow Meter |
51 | Supplying all material, labour, T & Pfor PLC for following works including all cost, taxes and transportation etc all complete as per direction of Engineer-in-charge including Data Communication to Central Server. |
52 | PLC Panel for Chemical Dosing System with 10" HMI |
53 | PLC Panel clarifaculator-1 & 2 with Radio Modem with 10" HMI |
54 | PLC Panel at Chlorine House with 10" HMI |
55 | PLC Panel at CWR with 10" HMI |
56 | PLC Panel with Console (DI-60,DO-32,AI-12) at Filter Bed with 10" HMI |
57 | Main PLC Panel with Redundant CPU & Redundant Power Supply (DI-100, DO-60,AI-24,AO-12,MODBUS-74) with 10" HMI |
58 | Supplying all material, labour, T & Pfor SCADA based Operator Stationincluding all cost, taxes and transportation etc all complete as per direction of Engineer-in-charge |
59 | Engineering Server Station with 21 inch Moniotor |
60 | Operator Station PC with 21inch Monitor |
61 | Printer - A3 Colourjet |
62 | Control Desk |
63 | Operator Chairs |
64 | Ethernet Switches |
65 | Supplying all material, labour, T & PforPower & Control Cableincluding all cost, taxes and transportation etc all complete as per direction of Engineer-in-charge |
66 | Copper Armoured cables |
67 | 1 Pair x 1.00 sqmm |
68 | 12 Core x 1.5 sqmm |
69 | 24 Pair x 2.5 sqmm |
70 | 3 Core x 1.5 sqmm |
71 | 3 Core x 4 sqmm |
72 | Earthing Cable |
73 | 1 Core x 6 sqmm |
74 | Supplying all material, labour, T & PforCable Laying accessoriesincluding all cost, taxes and transportation etc all complete as per direction of Engineer-in-chargeCABLE TRAY |
75 | Junction BOX with fuse TB |
76 | Local Control Panel for motor and Pumps (With On,off,Emergency stop & key) |
77 | Earth pits with all accessories in normal soil |
78 | Cable Post and bracket |
79 | Supplying of All materials labour, T&Pinstallation & Commissioning for industrial grade laptop for confrugation of PLC & Programme of intake well & WTPetc complete. |
80 | Supplying of All materials labour, T&Pinstallation & Commissioning for civil works for PLC room afterconversion of existingpump house to panel & PLC room . |
81 | Supplying of All materials, labour, T&Pinstallation & Commissioning for fitting , fixing of stainless steeldismatiling joint of approve make.(400mm Dia) |
82 | Supplying of All materials, labour, T&Pinstallation & Commissioning for fitting , fixing of non return valve with damper kit of VAGmake etc. |
83 | Supplying of All materials, labour, T&Pinstallation & Commissioning for fitting , fixing of Aluminium earthing strips over PLC room including lightening arrester & 6no electronic earthing pits. |
84 | Supplying of All materials, labour , T&Pinstallation & Commissioning for fitting , fixing of Vertive make 1.5 ton precssion air conditioner of 3phase line power supply line etc complete. |
85 | Supplying of All materials, labour, T&Pinstallation & Commissioning ofchlorination PLC panel for chlorinatoretc complete |
86 | Supplying of All materials, labour, T&P & Commissioninginstallation & forgas chlorinator scrubber of 900 kg capacity etc complete |
87 | Supply,Installation & Commissioning of SCADA software (Make-Schiender/Simens) with Graphical processor visualisation Advanced alaram management,historical and Real time trending,Built-in-reporting,Stastical process control,Multithreaded citect VBA and Cicode programming language with 2048 Tag SCADA Software (ES+OS) (Make- Schneider, Siemens),1KVa online Ups with 30Min batery backup- 1Nos,CPU Having Preloaded win-10 Proffessional, I3-10gen 2.4 Ghz Prrocessor, DDR4 8gb Ram, 500 gb 7200 Rpm HDD-1 Nos ( Make- HP,DELL,LENOVO),USB based keyboard - 1Nos,USB based Optical Mouse- 1Nos,43"" LED monitor - 1Nos,A4 size laserPrinter - 1Nos,Wooden Computer table - 1 Nos ,Preparation of P&I diagram, Creation of Multi visualization screen for Process control,alarm managenent, Historical and realtime process trend, Daily reporting etc complete as per requirement & direction of Engineer - in - Charge (Including license key) |
88 | A)BPE 3KVA MP1103L8, rack-mounted Online UPS with 12V/65AH X 08 Nos. internal battery-1 No, B)Switch Brand: Schneider Main Input Breaker: 63A/1P*1 UPS Input Breaker: 40A/1P*1 UPS Output Breaker: 32A/1P*1 Maintenance Bypass: 32A/2P*1 Surge Protection Breaker: 32A/1P*1, including C-level surge protection Cooling Breaker: 40A/1P*2 UPS Output Distribution: 32A*1P*8 (PDU), 16A/1P*3 (light strip, monitoring, emergency ventilation each 1 way), 12V power supply: 12.5A Switch monitoring: with mains meter, UPS output main circuit with power distribution meter (Height 4U)-1No, C)3.5KW precision air conditioner, rack-mounted, constant temperature type, frequency conversion, including outdoor unit, height 5U, does not support optional expansion components-1No, D)800*1200*2000mm (width * depth * height) (fully equipped with blind panels and casters) Including case, side door, hot and cold aisle, front door with glass closed door, back door with sheet metal closed door, emergency cooling system, blind panel, guide rail, cable tie plate, cable management slot, cable management rack, lamp tube, auxiliary materials, etc.-1No, E)Input 32A, output C13*12+C19*4-2Nos, F)Monitoring system, 7-inch touch screen, monitoring power distribution, air conditioning, ambient temperature and humidity, smoke detection and other basic equipment in the Rack, no USB camera, standard genuine operating system software (Height 1U)-1No, G)Support face recognition, fingerprint recognition, password, card, 12VDC power supply-1No, H)Detect the water leakage state, after detecting the water leakage through the water leakage sensor line, a relay alarm signal is output through the collector, and a buzzer alarm can be issued, occupying a switch detection port, and the sensitivity is adjustable-1No, I)The cable is long and is used to cooperate with the water leakage detection alarm to detect whether there is water leakage-1No, J)Sound and light alarm-1No, K)Temperature and humidity sensor (small screen LCD)-1No, L)Smoke sensor-1No, M)NOVEC 1230 Based Fire Suppression Unit with accessories-1No, N)3KVA Isolation TX with Rack Mount Cabinet-1No, O)Installation & Commisining Charger Included 15 mtr. AC Indoor-Outdoor Connecting Copper Tube with isulation & drain Pipe-1No. |
89 | Supplying Fiting Fixing & Commissioning of 2U Rack Server Intel Xeion Double Gold Processer 11 Generation 16MB or Higher Chache Memory of 32 X 2 GB DDR RAM Dual Power Supply RAD Driver,24 Port Giga Manage Switch with 2 SFP,Cesco Fire Wall,Cisco Make Road Balancing Router,24 Port SAP Fibre Switch with 4 Port Ethernate Switch including 1 TB X 5 SSD Hard disk |
90 | Stainless Steel hex bolt as per AISI 304 |
91 | 16 mm dia 55 mm long |
92 | 12 mm dia 55 mm long |
93 | Stainless Steel hex nut as per AISI 304 |
94 | 16 mm dia |
95 | 12 mm dia |