Tender For Execution Of Contract For Extension Of Supply Works And Other Works In Respect Of Cheranmahadevi Sub Division / Kallidaikurichi Division /Tirunelveli Edc - Normal Ground- Excavation Of Pole Pits (1.25M * 0.5M*1.5M) For 7.32M, 7.5M, 8M, 8.23M Po
Tender Overview
Project Description
Execution Of Contract For Extension Of Supply Works And Other Works In Respect Of Cheranmahadevi Sub Division / Kallidaikurichi Division / Tirunelveli Edc - Normal Ground- Excavation Of Pole Pits ( 1.25M * 0.5M*1.5M ) For 7.32M, 7.5M, 8M, 8.23M Poles 2 Normal Ground- Erection Of 7.32M, 7.5M, 8M, 8.23M Poles 3 Rocky Ground ( Medium ) - Excavation Of Pole Pits ( 1.25M * 0.5M*1.5M ) For 7.32M, 7.5M, 8M, 8.23M Poles 4 Rocky Ground- Erection Of 7.32M, 7.5M, 8M, 8.23M Poles 5 Hard Rock Requiring Blasting And Chisseling- Excavation Of Pole Pit ( 1.25M * 0.5M*1.5M ) For 7.32M, 7.5M, 8M, 8.23M Poles 6 Hard Rock Requiring Blasting And Chisseling- Erection Of 7.32M, 7.5M, 8M, 8.23M Poles 7 Normal Ground- Excavation Of Pole Pits ( 1.25M * 0.6M*1.83M ) For 9M & 9.14M Poles 8 Normal Ground- Erection Of 9M & 9.14M Poles 9 Rocky Ground- Excavation Of Pole Pits ( 1.25M * 0.6M*1.83M ) For 9M & 9.14M Poles 10 Rocky Ground- Erection Of 9M & 9.14M Poles 11 Hard Rock Requiring Blasting And Chisseling- Excavation Of Pole Pit ( 1.25M * 0.5M*1.5M ) For 9M & 9.14M Poles 12 Hard Rock Requiring Blasting And Chisseling- Erection Of 9M & 9.14M Poles 13 Normal Ground- Excavation Of Pole Pits ( 1.25M * 0.6M*2.19M ) For Above 9.14M Poles & 36 Length Rs Joists 14 Normal Ground- Erection Ofabove 9.14M Poles & 36 Length Rs Joists 15 Rocky Ground- Excavation Of Pole Pits ( 1.25M * 0.6M*2.19M ) For Above 9.14M Poles & 36 Length Rs Joists 16 Rocky Ground- Erection Ofabove 9.14M Poles & 36 Length Rs Joists 17 Hard Rock Requiring Blasting And Chisseling- Excavation Of Pole Pit ( 1.25M * 0.5M*1.5M ) For Above 9.14M Poles & 36 Length Rs Joists 18 Hard Rock Requiring Blasting And Chisseling- Erection Of Above 9.14M Poles & 36 Length Rs Joists 19 Normal Ground- Excavation Of Pole Pits ( 1.25M * 0.6M*2.19M ) For 42 Length Rs Joists 20 Normal Ground- Erection Of42 Length Rs Joists 21 Rocky Ground- Excavation Of Pole Pits ( 1.25M * 0.6M*2.19M ) For 42 Length Rs Joists 22 Rocky Ground- Erection Of 42 Length Rs Joists 23 Hard Rock Requiring Blasting And Chisseling- Excavation Of Pole Pit ( 1.25M * 0.5M*1.5M ) For 42 Length Rs Joists 24 Hard Rock Requiring Blasting And Chisseling- Erection Of 42 Length Rs Joists 25 Transporting Of Poles From Road Side To Pole Pit Upto 2Km - 7.32M, 7.5M, 8M, 8.23M Rcc Pole 26 Transporting Of Poles From Road Side To Pole Pit Upto 2Km- 9M, 9.14M Rcc / Psc Pole 27 Transporting Of Poles From Road Side To Pole Pit Upto 2Km - Rsj 36 Pole 28 Transporting Of Poles From Road Side To Pole Pit - Rsj 42 And Above 29 Loading And Unloading Of Poles - 7.32M, 7.5M, 8M, 8.23M Rcc Pole 30 Loading And Unloading Of Poles - 9M, 9.14M Rcc / Psc Pole 31 Loading And Unloading Of Poles - Rs Joists, Tubular & Rail Pole ( Above 9.14M ) 32 Concreting Of Poles As Per Board Standards ( 2*2*5 ) . The Material Such As Cement, Sand, Jelly, Etc., Have To Be Supplied By The Contractor ( Cement Concrete Mix 1:4:8 Using 40Mm Hard Broken Stone Including Cost Of Labour Charges.For Placing Transporting Of Sant, Jally, From Box And Water Curing For 14 Days Etc, .Complete ) 33 Coping Of Pole ( 0.6M*0.6M*0.35M ) 34 Concreting Of Stay ( O.3M * 0.3M * 1.5M ) Including Materials 35 Coil Earthing Per Pole & Pole Earthing 36 Normal Ground- Excavation Of Stay Pit ( 1.00M * 0.5M*1.5M ) With Transporting Of Materials To Site ( For Stay Set ) 37 Normal Ground- Erection Of Stay Set 38 Rocky Ground ( Medium ) - Excavation Of Stay Pit ( 1.00M * 0.5M*1.5M ) With Transporting Of Materials To Site ( For Stay Set ) 39 Rocky Ground- Erection Of Stay Set 40 Hard Rock Requires Blasting & Chisseling- Excavation Of Stay Pit ( 1.00M * 0.5M*1.5M ) With Transporting Of Materials To Site ( For Stay Set ) 41 Hard Rock Requires Blasting & Chisseling- Erection Of Stay Set 42 Loadingand Unloading Charges Of Oil Drums ( With Oil ) 43 Loadingand Unloading Charges Of Oil Drums ( Withoutoil ) 44 Loadingand Unloading Charges Of Conductor Drum, Cable Drum 45 Loadingand Unloading Charges Of Line Materials 46 Loadingand Unloading Charges Of Metering Set 47 11Kv Lines- ( Pin Point ) Fixing Of V & Channel Cross Arm 5.5 Including Transporting Of Materials From Road Side To Site 48 11Kv Lines- ( Cut Point ) Fixing Of V & Channel Cross Arm 5.5 Including Transporting Of Materials From Road Side To Site 49 11Kv Lines- ( Pin Point ) Fixing Of V & Channel Cross Arm 4.5 Including Transporting Of Materials From Road Side To Site 50 11Kv Lines- ( Cut Point ) Fixing Of V & Channel Cross Arm 4.5 Including Transporting Of Materials From Road Side To Site 51 11Kv Lines- ( Pin Point ) Fixing Of V & Channel Cross Arm 3.5 Including Transporting Of Materials From Road Side To Site 52 11Kv Lines- ( Cut Point ) Fixing Of V & Channel Cross Arm 3.5 Including Transporting Of Materials From Road Side To Site 53 11Kv Lines-Fixing Of Lt 3Phase Cross Arm Including Transporting Of Materials From Road Side To Site 54 11Kv Lines-Fixing Of Lt 1Phase Cross Arm Including Transporting Of Materials From Road Side To Site 55 11Kv Lines-Fixing Of Ht Lt Ti Fitting Including Transporting Of Materials From Road Side To Site 56 11Kv Lines-Erection Of Ht Side Arm With Stud Including Transporting Of Materials From Road Side To Site 57 11Kv Lines-Erection Of Lt Side Arm With Stud Including Transporting Of Materials From Road Side To Site 58 11Kv Lines-Fixing Of Insulator ( Per Location ) Including Transporting Of Materials From Road Side To Site 59 11Kv Lines-Fixing Of 11Kv Disc Including Transporting Of Materials From Road Side To Site 60 11Kv Lines-Fixing Of Tapping Channel Cross Arm Including Transporting Of Materials From Road Side To Site 61 Ht Lines ( 33Kv ) - Stringing, Sagging, Binding Including Transporting Of Materials From Road Side To Site-For Dog Conductor ( 1Span / Wire ) 62 Ht Lines ( 33Kv ) - Stringing, Sagging, Binding Including Transporting Of Materials From Road Side To Site-For 7 / 4.09 Acsr Conductor ( 1Span / Wire ) 63 Ht Lines ( 33Kv ) - Stringing, Sagging, Binding Including Transporting Of Materials From Road Side To Site-For Dog Conductor ( 1Span / Wire ) With- Line Clear Works 64 Ht Lines ( 33Kv ) - Stringing, Sagging, Binding Including Transporting Of Materials From Road Side To Site-For 7 / 4.09 Acsr Conductor ( 1Span / Wire ) With Line Clear Works 65 11Kv Lines - Stringing, Sagging, Binding Including Transporting Of Materials From Road Side To Site-For 7 / 2.59 Acsr ( 1Span / Wire ) 66 11Kv Lines - Stringing, Sagging, Binding Including Transporting Of Materials From Road Side To Site-For 7 / 3.35 Acsr ( 1Span / Wire ) 67 Ht Lines - Stringing, Sagging, Binding Including Transporting Of Materials From Road Side To Site-For 7 / 4.09 Acsr ( 1Span / Wire ) 68 11Kv Lines - Stringing, Sagging, Binding Including Transporting Of Materials From Road Side To Site-For 7 / 2.59 Acsr ( 1Span / Wire ) -With Line Clear Works 69 11Kv Lines - Stringing, Sagging, Binding Including Transporting Of Materials From Road Side To Site-For 7 / 3.35 Acsr ( 1Span / Wire ) With Line Clear Works 70 Ht Lines - Stringing, Sagging, Binding Including Transporting Of Materials From Road Side To Site-For 7 / 4.09 Acsr ( 1Span / Wire ) With Line Clear Works 71 Lt Lines - Stringing, Sagging, Binding Including Transporting Of Materials From Road Side To Site- For 7 / 2.59 Acsr, 7 / 2.50Aaac 72 Lt Lines - Stringing, Sagging, Binding Including Transporting Of Materials From Road Side To Site- For 7 / 3.35 Acsr, 7 / 3.15 Aaac 73 Lt Lines - Stringing, Sagging, Binding Including Transporting Of Materials From Road Side To Site- For 7 / 2.59 Acsr, 7 / 2.50Aaac With Line Clear Works ( 1Span / Wire ) 74 Lt Lines - Stringing, Sagging, Binding Including Transporting Of Materials From Road Side To Site- For 7 / 3.35 Acsr, 7 / 3.15 Aaacwith Line Clear Works ( 1Span / Wire ) 75 Guarding Per Span Length- Spilt Neutral Guarding 76 Guarding Per Span Length- Flat Guarding ( 2 Wires ) 77 Guarding Per Span Length- Flat Guarding ( 4 Wires ) 78 Guarding Per Span Length- Flat Guarding ( 6 Wires ) 79 Guarding Per Span Length- Cradle Guarding ( Fixing Of X Arm Lacing ) 80 Guarding Per Span Length- Fixing Of One Earthing Device With Stud 81 Erection Of Transformer / Dismantling Upto 200Kva 82 Erection Of Transformer / Dismantling Upto 250Kva 83 Erection Of Transformer / Dismantling Upto 500Kva 84 Erection Of Centre Support ( Including Concrete ) 85 Erection Of Metering Set 86 Erection Of Feeder Cable With Open Type Fuse Unit Per Feeder 87 Erection Of Feeder Cable With Open Type Fuse Unit - For Each Addl Feeder 88 Erection Of Feeder Cable -Bus Bar Arrangement With Open Type 89 Loading & Unloading Of Distribution Transformer Below 250Kva 90 Loading & Unloading Of Distribution Transformer 250Kva 91 Loading & Unloading Of Distribution Transformer 500Kva 92 Plinth Work For 500Kva Dt With Construction Material 93 Fabrication , Erection And Excavation For Centre Support Etc For 250 / 500 Dt Including Transporting 94 Tube Light Erection-1*40W Tube Light Complete Set ( Including Transport ) 95 Tube Light Erection-For Sv Lamp And Mercury Lamp Complete Set ( Including Transport ) 96 Tube Light Erection-For Cfl Lamp Complete Set ( Including Transport ) 97 Painting Of Sc Number Including Painting 98 Tube Light 72W Led Erection 99 Manufacturing Of Clamps 50*8 Mm 100 Manufacturing Of Clamps 65*10 Mm 101 Alteration Of Clamps 102 Street Light Switching Point Arrangement 103 Drilling / Less Than 23Mm Holes Per Hole / Slotted Holes 104 Cutting Of Channel 105 Cutting Of Flat 106 Cutting Of Angle 107 Rsj Pole Cutting 108 Tubular Pole Cutting 109 Rail Pole Cutting 110 Fabrication Of Lightning Arrestor Frame 111 Lt-Changing Of Pin Point To Cut Point 112 Ht-Changing Of Pin Point To Cut Point 113 Erection Of Service Connection Materials-1Ph Service 114 Erection Of Service Connection Materials-3Ph Service 115 Dismantling Of Deteriorated Poles With Concrete In Damaged Condition Including Grill Separation Etc., 116 Dismantling Of Poles Without Concrete In Damaged Condition Including Grill Separation Etc., 117 Providing Jumpering At Cut Point 118 Complete Replacement Of Worn Out Earth Wire Per Structure 119 Labour For Manufacturing Of Open Type Fuse Unit ( Materials Supplied By Board ) 120 Manufacturing Of Hg Fuse Stool Incl. Materials 121 Tree Clearence In Ht Or Lt Location- For Ordy. Tree Clearence And Throng Bushes & Trees 122 Tree Clearence In Ht Or Lt Location- For Coconut Trees 123 Tree Clearence In Ht Or Lt Location- For Palmrah Trees 124 Painting-Double Pole Transformer Structure Materials ( Double Coat ) ( Including Cost Of Paint ) 125 Painting-Pole ( Colour Washing With Distember ) 2 Nos ( Including Cost Of Paint ) 126 Painting-For Transformer Only ( Double Coat With Paint ) 127 Numbering Of Poles With Backround Colour Paint 128 Numbering Of Distribution Transformer ( Painting And Writing Of Name Board Size-1-1 / 4*1 Incl Cost Of Paint & Board And Ms Sheet 129 Writing In Seating Channel ( Paint To Be Supplied By Contractor ) 130 Painting Of Rcc Strcucture Poles All Metal Parts, Snowcem & Aluminium Paint To Be Supplied By Contractor 131 Painting Of Rsj Structure Poles & Metal Parts-Aluminium Paint To Be Supplied By Contrcator 132 Set Right Of Leaning Ht Pole / Lt Pole Including X Arms, Ti Fittings 133 Transformer Structure Erection-Excavation Of Structure Pole Pits ( 2Nos ) 134 Transformer Structure Erection-Erection Of Structure Poles ( 2Nos ) 135 Transformer Structure Erection-Excavation Of Stay Pits ( 4Nos ) 136 Transformer Structure Erection-Erection Of Stay Set ( 4Nos ) 137 Transformer Structure Erection-Concreting Of Structure Poles Incl.Materials Mass Concrete With Coping ( 2 Poles ) 138 Transformer Structure Erection-Concreting Of Stays ( 4Nos ) Incl.Materials 139 Erection Of Structure Materials-Top Channel 140 Erection Of Structure Materials-Transformer Seating Channel And Belting Angle 141 Erection Of Structure Materials-Ab Switch ( Complete ) 142 Erection Of Structure Materials-Hg Fuse ( Complete ) 143 Erection Of Structure Materials-Jumpering 144 Erection Of Structure Materials-Ht Las 145 Erection Of Structure Materials-Lt Las 146 Erection Of Structure Materials -Transformer Lt Cable Wiring / Lt Bus Bar 147 Erection Of Structure Material-Erection Of Lt Open Type Fuse Unit Including Cablejumbering Up To The Line Including Cutting Welding Bending , Fabrication Etc 148 Earthing System-Excavation Of 4 Nos. Earth Pits 149 Earthing System-Excavation Of Earth Wire Trenches And Paving Of Earth Wire, Erection Of 4 Nos. Earth Pipe And Giving Earth Connection, Earthing Of All Metal Parts, Las Etc., Including Central Connection 150 Earthing System-Mason Works With Bricksforearth Pits4 Nos ( Cementsupplied By Contractor ) 151 Earthing System-Painting Of Transformer Structure 2 Coats Incl.Paint 152 Earthing System-Painting With Distember Paint On Poles With Paint Cost 153 Earthing System-Spreading Yard Jelly And Cut Stone And Bricks Including Material 154 Earthing System-Writing Of Name Board And Target Board 155 Earthing System-Transporting Of Structure Materials Abs, Hg Fuse, Cable Etc Except Pole 156 Earthing System-Fixing Of Danger Board ( Labour Only ) 157 Erection Of Tapping Structure-Excavation Of Structure Pole Pit. ( 2Nos ) 158 Erection Of Tapping Structure-Erection Of Structure Pole. ( 2Nos ) 159 Erection Of Tapping Structure-Excavation Of Stay Pit ( 2Nos ) 160 Erection Of Tapping Structure-Erection Of Stay Set ( 2Nos ) 161 Erection Of Tapping Structure- Concreting Of Structure Poles Including Materials Mass Concrete With Copping ( 2Nos ) 162 Erection Of Tapping Structure-Concreting Of Stay ( 2Nos ) 163 Erection Of Structure Materials-Top Channel 164 Erection Of Structure Materials-Ab Switch ( Complete ) 165 Erection Of Structure Materials-Assemble, Operating Pipe Fixing Etc., Fixing Of Cross Bracing 166 Earthing System-Excavation Of 1 No. Earth Pits Excavation Of Earth Wire Trench And Paving Of Earth Wire, Erection Of 1 No. Earth Pipe And Giving Earth Connection, Earthing Of All Metal Parts, For Tapping Structure. 167 Earthing System-Mason Works With Bricks For Earth Pit ( Including Material ) 168 Colour Coating On Poles With Iron Materials Including Paint And Distember 169 Transporting Of 42 Twin Rsj Pole From Roadside Pole Pit 170 Fabrication Of 42 Twin Rsj Pole, Materials Supplied By Board. 171 Excavation & Erection Of Twin 422 Fabricated Rsj Pole 172 Concreting Of 42 Twin Rsj Pole 173 Loadiing & Unloading Of 42 Twin Rsj Pole 174 Resagging Of Various Conductor ( Please Mention In Percentage Of Respectie Conductor ) 175 Dismantling Of 7.5M / 8M Pole With Out Damage 176 Dismantling Of 9.14M Pole / Rsj With Out Damage 177 Dismantling Of Stay Set Complete 178 Replacement Of Detoriated Stay Rod 179 Replacement Of Rsj / Tubular Poles Below 30 Feet 180 Replacement Of Rsj / Tubular Poles Aove 30 Feet 181 Dismantling Of Detoriated Cables Of Various Size ( 95, 120, 185 Sq.Mm ) From Dt, Lt Bushing To Lt Open Type Clamp Anderection Of Suitable Lug At Both Ends 182 Replacement Of New 10 Earthpipe Replacing The Corroded Earth Pipe And Renewal Of Earthing Including Burying , Looping And Binding 183 Mass Concrete For Poles On The Line ( All Materials Including Cementratio 1:2:4 ) ( 1 Loc ( 0.72 M3 ) ( 0.65*0.65*1.65 M, 0.6*0.6*0.35 Cum ) 184 Sleeveconcrete For Poles On The Line ( All Materials Including Cementratio 1:2:4 ) ( 1 Loc ( 0.202 ) ( 0.5*0.45*0.9M ) 185 Providing Of Spacers In Lt Lines 186 Hiring Of Jcb 187 Hiring Of Crane 188 Exceeding 1 Hour For Every Hour 189 Transporting Of Charges Of Dt / Line Materials Using Private Vehicle Upto 20 Km ( Up And Down ) 190 Beyond 20 Km For Every Km 191 Single Pole Structure Erection- Excavation Of Structure Pole Pit 3’ X 6’ By Using Jcb Or Manual 192 Single Pole Structure Erection- Transportation Of Pole From Road Side To Pole Pit By Using Jcb Or Manual 193 Single Pole Structure Erection-Erection Of Poles By Using Jcb Or Manual 194 Single Pole Structure Erection Excavation Of Stay Pit By Jcb Or Manual ( 2Nos ) 195 Single Pole Structure Erection- Erection Of Stay Set Complete ( 2Nos ) 196 Single Pole Structure Erection -Mass Concreting For Structure 197 Single Pole Structure Erection -Stay Concrete ( 2Nos ) 198 Single Pole Structure Erection -Erection Of Structure Materials- Tapping Channel 199 Single Pole Structure Erection -Erection Of Structure Materials- Transformer Bed Stucture 200 Single Pole Structure Erection -Erection Of Ab Switch 201 Single Pole Structure Erection -Erection Of H.G. Fuse ( 3Nos ) 202 Structure Earthing Complete With 3 Pits And Earth Loops 203 Single Pole Structure Erection-Fixing Of Mcd Box 204 Single Pole Structure Erection-Ht-Las Fixing ( 3Nos ) 205 Singple Pole Structure Erection-Lt-Las Fixing ( 3Nos ) 206 Single Pole Structure Erection-Ht Jumpering Complete 207 Singple Pole Structure Erection-Painting Of All Clamps And Other Iron Materials And Painting Of Structure Pole 208 Single Pole Structure Erection-Ltcable Arrangement 209 Single Pole Structure Erection-Fixing Of Danger Board 210 Dismantling Of Other Line Materials - ( Please Mention In Percentage For Respective Line Material Errection Works )
BOQ
| Sl. No. | Item Description |
| 1 | Normal ground- Excavation of Pole pits (1.25m * 0.5m*1.5m) for 7.32m, 7.5m, 8m, 8.23m poles |
| 2 | Normal ground- Erection of 7.32m, 7.5m, 8m, 8.23m poles |
| 3 | Rocky ground (Medium)- Excavation of Pole pits (1.25m * 0.5m*1.5m) for 7.32m, 7.5m, 8m, 8.23m poles |
| 4 | Rocky ground- Erection of 7.32m, 7.5m, 8m, 8.23m poles |
| 5 | Hard rock requiring Blasting and chisseling- Excavation of pole pit (1.25m * 0.5m*1.5m) for 7.32m, 7.5m, 8m, 8.23m poles |
| 6 | Hard rock requiring Blasting and chisseling- Erection of 7.32m, 7.5m, 8m, 8.23m poles |
| 7 | Normal ground- Excavation of Pole pits (1.25m * 0.6m*1.83m) for 9M & 9.14M poles |
| 8 | Normal ground- Erection of 9M & 9.14M poles |
| 9 | Rocky ground- Excavation of Pole pits (1.25m * 0.6m*1.83m) for 9M & 9.14M poles |
| 10 | Rocky ground- Erection of 9M & 9.14M poles |
| 11 | Hard rock requiring Blasting and chisseling- Excavation of pole pit (1.25m * 0.5m*1.5m) for 9M & 9.14M poles |
| 12 | Hard rock requiring Blasting and chisseling- Erection of 9M & 9.14M poles |
| 13 | Normal ground- Excavation of Pole pits (1.25m * 0.6m*2.19m) for above 9.14M poles & 36\" length RS Joists |
| 14 | Normal ground- Erection ofabove 9.14M poles & 36\" length RS Joists |
| 15 | Rocky ground- Excavation of Pole pits (1.25m * 0.6m*2.19m) for above 9.14M poles & 36\" length RS Joists |
| 16 | Rocky ground- Erection ofabove 9.14M poles & 36\" length RS Joists |
| 17 | Hard rock requiring Blasting and chisseling- Excavation of pole pit (1.25m * 0.5m*1.5m) for above 9.14M poles & 36\" length RS Joists |
| 18 | Hard rock requiring Blasting and chisseling- Erection of above 9.14M poles & 36\" length RS Joists |
| 19 | Normal ground- Excavation of Pole pits (1.25m * 0.6m*2.19m) for 42\" length RS Joists |
| 20 | Normal ground- Erection of42\" length RS Joists |
| 21 | Rocky ground- Excavation of Pole pits (1.25m * 0.6m*2.19m) for 42\" length RS Joists |
| 22 | Rocky ground- Erection of 42\" length RS Joists |
| 23 | Hard rock requiring Blasting and chisseling- Excavation of pole pit (1.25m * 0.5m*1.5m) for 42\" length RS Joists |
| 24 | Hard rock requiring Blasting and chisseling- Erection of 42\" length RS Joists |
| 25 | Transporting of poles from road side to pole pit upto 2KM - 7.32m, 7.5m, 8m, 8.23m RCC pole |
| 26 | Transporting of poles from road side to pole pit upto 2KM- 9m, 9.14m RCC/PSC pole |
| 27 | Transporting of poles from road side to pole pit upto 2KM - RSJ 36\" Pole |
| 28 | Transporting of poles from road side to pole pit - RSJ 42\" and above |
| 29 | Loading and Unloading of poles - 7.32m, 7.5m, 8m, 8.23m RCC pole |
| 30 | Loading and Unloading of poles - 9m, 9.14m RCC/PSC pole |
| 31 | Loading and Unloading of poles - RS Joists, tubular & rail pole (above 9.14m) |
| 32 | Concreting of poles as per Board Standards (2\"*2\"*5\"). The materialsuch as cement, sand, jelly, etc., have to be supplied by the contractor (Cement concrete mix 1:4:8 using 40mm hard broken stone including cost of labour charges.for placing Transporting of sant,jally,from box and water curing for 14 days etc,.complete) |
| 33 | Coping of pole (0.6m*0.6m*0.35m) |
| 34 | Concreting of stay (o.3m * 0.3m * 1.5m) including materials |
| 35 | Coil earthing per pole & pole earthing |
| 36 | Normal ground- Excavation of stay pit (1.00m * 0.5m*1.5m) with transporting of materials to site (For stay set) |
| 37 | Normal ground- Erection of stay set |
| 38 | Rocky ground (Medium)- Excavation of stay pit (1.00m * 0.5m*1.5m) with transporting of materials to site (For stay set) |
| 39 | Rocky ground- Erection of stay set |
| 40 | Hard Rock requires blasting & chisseling- Excavation of stay pit (1.00m * 0.5m*1.5m) with transporting of materials to site (For stay set) |
| 41 | Hard Rock requires blasting & chisseling- Erection of stay set |
| 42 | Loadingand unloading charges of Oil drums (with oil) |
| 43 | Loadingand unloading charges of Oil drums (withoutoil) |
| 44 | Loadingand unloading charges of Conductor Drum, Cable Drum |
| 45 | Loadingand unloading charges of Line Materials |
| 46 | Loadingand unloading charges of Metering Set |
| 47 | 11KV Lines-(Pin point) Fixing of V & Channel cross arm 5.5\" including transporting of materials from road side to site |
| 48 | 11KV Lines-(Cut Point) Fixing of V & Channel cross arm 5.5\" including transporting of materials from road side to site |
| 49 | 11KV Lines-(Pin point) Fixing of V & Channel cross arm 4.5\" including transporting of materials from road side to site |
| 50 | 11KV Lines-(Cut Point) Fixing of V & Channel cross arm 4.5\" including transporting of materials from road side to site |
| 51 | 11KV Lines-(Pin point) Fixing of V & Channel cross arm 3.5\" including transporting of materials from road side to site |
| 52 | 11KV Lines-(Cut Point) Fixing of V & Channel cross arm 3.5\" including transporting of materials from road side to site |
| 53 | 11KV Lines-Fixing of LT 3Phase cross arm including transporting of materials from road side to site |
| 54 | 11KV Lines-Fixing of LT 1Phase cross arm including transporting of materials from road side to site |
| 55 | 11KV Lines-Fixing of HT LT TI fitting including transporting of materials from road side to site |
| 56 | 11KV Lines-Erection of HT Side arm with stud including transporting of materials from road side to site |
| 57 | 11KV Lines-Erection of LT Side arm with stud including transporting of materials from road side to site |
| 58 | 11KV Lines-Fixing of insulator (per location) including transporting of materials from road side to site |
| 59 | 11KV Lines-Fixing of 11KV Disc including transporting of materials from road side to site |
| 60 | 11KV Lines-Fixing of Tapping channel Cross arm including transporting of materials from road side to site |
| 61 | HT lines (33KV)- Stringing, Sagging, binding including transporting of materials from road side to site-For Dog conductor (1Span/Wire) |
| 62 | HT lines (33KV)- Stringing, Sagging, binding including transporting of materials from road side to site-For 7/4.09 ACSR conductor (1Span/Wire) |
| 63 | HT lines (33KV)- Stringing, Sagging, binding including transporting of materials from road side to site-For Dog conductor (1Span/Wire) with- Line clear works |
| 64 | HT lines (33KV)- Stringing, Sagging, binding including transporting of materials from road side to site-For 7/4.09 ACSR conductor (1Span/Wire) with Line clear works |
| 65 | 11KV lines - Stringing, Sagging, binding including transporting of materials from road side to site-For 7/2.59 ACSR (1Span/Wire) |
| 66 | 11KV lines - Stringing, Sagging, binding including transporting of materials from road side to site-For 7/3.35 ACSR (1Span/Wire) |
| 67 | HT lines - Stringing, Sagging, binding including transporting of materials from road side to site-For 7/4.09 ACSR (1Span/Wire) |
| 68 | 11KV lines - Stringing, Sagging, binding including transporting of materials from road side to site-For 7/2.59 ACSR (1Span/Wire)-with line clear works |
| 69 | 11KV lines - Stringing, Sagging, binding including transporting of materials from road side to site-For 7/3.35 ACSR (1Span/Wire) with line clear works |
| 70 | HT lines - Stringing, Sagging, binding including transporting of materials from road side to site-For 7/4.09 ACSR (1Span/Wire) with line clear works |
| 71 | LT lines - Stringing, Sagging, binding including transporting of materials from road side to site- For 7/2.59 ACSR, 7/2.50AAAC |
| 72 | LT lines - Stringing, Sagging, binding including transporting of materials from road side to site- For 7/3.35 ACSR, 7/3.15 AAAC |
| 73 | LT lines - Stringing, Sagging, binding including transporting of materials from road side to site- For 7/2.59 ACSR, 7/2.50AAAC with line clear works (1Span/Wire) |
| 74 | LT lines - Stringing, Sagging, binding including transporting of materials from road side to site- For 7/3.35 ACSR, 7/3.15 AAACwith line clear works (1Span/Wire) |
| 75 | Guarding per span length- Spilt Neutral Guarding |
| 76 | Guarding per span length- Flat Guarding (2 wires) |
| 77 | Guarding per span length- Flat Guarding (4 wires) |
| 78 | Guarding per span length- Flat Guarding (6 wires) |
| 79 | Guarding per span length- Cradle Guarding (Fixing of \" X\" arm Lacing ) |
| 80 | Guarding per span length- Fixing of one earthing device with stud |
| 81 | Erection of transformer/dismantling upto 200KVA |
| 82 | Erection of transformer/dismantling upto 250KVA |
| 83 | Erection of transformer/dismantling upto 500KVA |
| 84 | Erection of centre support (Including concrete) |
| 85 | Erection of Metering set |
| 86 | Erection of feeder cable with open type fuse unit per feeder |
| 87 | Erection of feeder cable with open type fuse unit - for each addl feeder |
| 88 | Erection of feeder cable -Bus bar arrangement with open type |
| 89 | Loading & unloading of Distribution transformer below 250KVA |
| 90 | Loading & unloading of Distribution transformer 250KVA |
| 91 | Loading & unloading of Distribution transformer 500KVA |
| 92 | Plinth work for 500KVA DT with construction material |
| 93 | Fabrication ,erection and excavation for centre support etc for 250 /500 DT including transporting |
| 94 | Tube light erection-1*40W tube light complete set (including transport) |
| 95 | Tube light erection-For SV lamp and mercury lamp complete set (including transport) |
| 96 | Tube light erection-For CFL lamp complete set (including transport) |
| 97 | Painting of Sc Number including Painting |
| 98 | Tube light 72W LED Erection |
| 99 | Manufacturing of clamps 50*8 mm |
| 100 | Manufacturing of clamps 65*10 mm |
| 101 | Alteration of clamps |
| 102 | Street light switching point arrangement |
| 103 | Drilling / Less than 23mm holes per hole /slotted holes |
| 104 | Cutting of channel |
| 105 | Cutting of Flat |
| 106 | Cutting of Angle |
| 107 | RSJ pole cutting |
| 108 | Tubular pole cutting |
| 109 | Rail pole cutting |
| 110 | Fabrication of lightning arrestor frame |
| 111 | LT-Changing of pin point to cut point |
| 112 | HT-Changing of pin point to cut point |
| 113 | Erection of service connection materials-1Ph service |
| 114 | Erection of service connection materials-3Ph service |
| 115 | Dismantling of deteriorated poles with concrete in damaged condition including grill separation etc., |
| 116 | Dismantling of poles without concrete in damaged condition including grill separation etc., |
| 117 | Providing jumpering at cut point |
| 118 | complete replacement of worn out earth wire per structure |
| 119 | Labour for manufacturing of open type fuse unit (Materials supplied by board) |
| 120 | Manufacturing of HG fuse stool incl. materials |
| 121 | Tree clearence in HT or LT location- For ordy. Tree clearence and Throng bushes & trees |
| 122 | Tree clearence in HT or LT location- For coconut trees |
| 123 | Tree clearence in HT or LT location- For Palmrah trees |
| 124 | Painting-Double pole Transformer structure materials (Double coat) (Including cost of paint) |
| 125 | Painting-Pole (Colour washing with distember) 2 Nos (Including cost of paint) |
| 126 | Painting-For transformer only (Double coat with paint) |
| 127 | Numbering of poles with backround colour paint |
| 128 | Numbering of Distribution Transformer (Painting and writing of name board size-1-1/4*1 incl cost of paint & board and MS sheet |
| 129 | Writing in seating channel (Paint to be supplied by contractor) |
| 130 | Painting of RCC Strcucture poles all metal parts, snowcem & aluminium paint to be supplied by contractor |
| 131 | Painting of RSJ structure poles & metal parts-aluminium paint to be supplied by contrcator |
| 132 | Set right of leaning HT pole/LT pole including x arms, TI fittings |
| 133 | Transformer structure erection-Excavation of structure pole pits ( 2Nos) |
| 134 | Transformer structure erection-Erection of structure poles ( 2Nos) |
| 135 | Transformer structure erection-Excavation of stay pits(4Nos) |
| 136 | Transformer structure erection-Erection of stay set (4Nos) |
| 137 | Transformer structure erection-Concreting of structure poles incl.materials Mass concrete with coping (2 poles) |
| 138 | Transformer structure erection-Concreting of stays (4Nos) incl.materials |
| 139 | Erection of Structure materials-Top Channel |
| 140 | Erection of Structure materials-Transformer seating channel and belting angle |
| 141 | Erection of Structure materials-AB switch (Complete) |
| 142 | Erection of Structure materials-HG fuse (Complete) |
| 143 | Erection of Structure materials-Jumpering |
| 144 | Erection of Structure materials-HT LAS |
| 145 | Erection of Structure materials-LT LAS |
| 146 | Erection of structure materials -Transformer LT cable wiring / LT Bus Bar |
| 147 | Erection of structure material-Erection of LT Open type fuse unit including cablejumbering up to the line including cutting welding bending ,fabrication etc |
| 148 | Earthing system-Excavation of 4 Nos. earth pits |
| 149 | Earthing system-Excavation of earth wire trenches and paving of earth wire, Erection of 4 Nos. earth pipe and giving earth connection, Earthing of all metal parts, Las etc., including central connection |
| 150 | Earthing system-Mason works with bricksforearth pits4 nos (cementsupplied by Contractor) |
| 151 | Earthing system-Painting of transformer structure 2 coats incl.paint |
| 152 | Earthing system-Painting with Distember paint on poles with paint cost |
| 153 | Earthing system-Spreading yard jelly and cut stone and bricks including material |
| 154 | Earthing system-Writing of name board and target board |
| 155 | Earthing system-Transporting of Structure materials ABS,HG Fuse,cable etc Except Pole |
| 156 | Earthing system-Fixing of Danger Board ( labour only) |
| 157 | Erection of Tapping structure-Excavation of structure pole pit. (2Nos) |
| 158 | Erection of Tapping structure-Erection of structure pole. (2Nos) |
| 159 | Erection of Tapping structure-Excavation of stay pit (2Nos) |
| 160 | Erection of Tapping structure-Erection of stay set (2Nos) |
| 161 | Erection of Tapping structure- Concreting of structure poles including materials Mass Concrete with Copping (2Nos) |
| 162 | Erection of Tapping structure-Concreting of stay (2Nos) |
| 163 | Erection of Structure materials-Top channel |
| 164 | Erection of Structure materials-AB switch (complete) |
| 165 | Erection of Structure materials-Assemble, operating pipe fixing etc., fixing of cross bracing |
| 166 | Earthing system-Excavation of 1 No. earth pits Excavation of earth wire trench and paving of earth wire, Erection of 1 No. earth pipe and giving earth connection, Earthing of all metal parts, for tapping structure. |
| 167 | Earthing system-Mason works with Bricks for earth pit (including material) |
| 168 | Colour coating on poles with iron materials including paint and distember |
| 169 | Transporting of 42\" twin RSJ pole from roadside pole pit |
| 170 | Fabrication of 42\" Twin RSJ pole, Materials supplied by Board. |
| 171 | Excavation & Erection of Twin 42\"2\" fabricated RSJ pole |
| 172 | Concreting of 42\" twin RSJ pole |
| 173 | Loadiing & Unloading of 42\" Twin RSJ pole |
| 174 | Resagging of various conductor (Please mention in percentage of respectie conductor) |
| 175 | Dismantling of 7.5m /8m pole with out damage |
| 176 | Dismantling of 9.14m pole/ RSJ with out damage |
| 177 | Dismantling of stay set complete |
| 178 | Replacement of detoriated stay rod |
| 179 | Replacement of RSJ/Tubular poles below 30 feet |
| 180 | Replacement Of RSJ/Tubular poles aove 30 feet |
| 181 | Dismantling of detoriated cables of various size(95,120,185 sq.mm) from DT,LT bushing to LT open type clamp anderection of suitable lug at both ends |
| 182 | Replacement of new 10\" earthpipe replacing the corroded earth pipe and renewal of earthing including burying , looping and binding |
| 183 | Mass Concrete for poles on the line ( All Materials including cementRatio 1:2:4) ( 1 Loc ( 0.72 m3) (0.65*0.65*1.65 m,0.6*0.6*0.35 Cum) |
| 184 | SleeveConcrete for poles on the line ( All Materials including cementRatio 1:2:4) ( 1 Loc ( 0.202 ) (0.5*0.45*0.9M) |
| 185 | Providing of Spacers in LT Lines |
| 186 | Hiring of JCB |
| 187 | Hiring of Crane |
| 188 | Exceeding 1 Hour for every hour |
| 189 | Transporting of Charges of DT / Line materials using private vehicle upto 20 KM( Up and Down) |
| 190 | Beyond 20 KM for every KM |
| 191 | Single pole structure erection- Excavation of structure pole pit 3’ x 6’ by using JCB or Manual |
| 192 | Single pole structure erection- Transportation of pole from road side to pole pit by using JCB or Manual |
| 193 | Single pole structure erection-Erection of poles by using JCB or Manual |
| 194 | Single pole structure erection Excavation of stay pit by JCB or Manual (2Nos) |
| 195 | Single pole structure erection- Erection of stay set complete (2Nos) |
| 196 | Single pole structure erection -Mass concreting for structure |
| 197 | Single pole structure erection -Stay Concrete (2Nos) |
| 198 | Single pole structure erection -Erection of Structure materials- Tapping channel |
| 199 | Single pole structure erection -Erection of Structure materials- Transformer Bed Stucture |
| 200 | Single pole structure erection -Erection of AB switch |
| 201 | Single pole structure erection -Erection of H.G. Fuse (3Nos) |
| 202 | Structure earthing complete with 3 pits and earth loops |
| 203 | Single pole structure erection-Fixing of MCD Box |
| 204 | Single pole structure erection-HT-LAS fixing (3Nos) |
| 205 | Singple pole structure erection-LT-LAS fixing (3Nos) |
| 206 | Single pole structure erection-HT jumpering complete |
| 207 | Singple pole structure erection-Painting of all clamps and other iron materials and painting of structure pole |
| 208 | Single pole structure erection-LTCable arrangement |
| 209 | Single pole structure erection-Fixing of Danger board |
| 210 | Dismantling of other line materials - (Please mention In percentage for respective line material errection works) |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender