Construction Of Link Road Harijan Basti To Naian From Chowkimaniar Sohari Takoli Road Km. 0/0 To 1/0 (Sh:- C/O 600Mm Dia Hume Pipe Culvert At Rd 0/835And 0/997, P/L Paver Block Between Rd 0/790 To 0/840 And C/O Breast Wall At Rd 0/650 To 0/725 Including
Tender Overview
Project Description
Construction Of Link Road Harijan Basti To Naian From Chowkimaniar Sohari Takoli Road Km. 0 / 0 To 1 / 0 ( Sh:- C / O 600Mm Dia Hume Pipe Culvert At Rd 0 / 835And 0 / 997, P / L Paver Block Between Rd 0 / 790 To 0 / 840 And C / O Breast Wall At Rd 0 / 650 To 0 / 725 Including U-Shape Drain ) Under Sccp.
BOQ
| Sl. No. | Item Description |
| 1 | Excavation in earth work in foundation and trenches etceterain all kind and classification of soil such as pick work,jumper work, pick jumper work, blasting workand hard blasting workand saturated soil any other mixed verity of soil in dry or saturated condition upto any depth and lift upto any height includingchiseling/wedging out rocks where blasting prohibited dewatering pumping or bailing out water where required and/ removalof slush seprately as directed which may arise during the execution including stacking the serviceable and unserviceable material and then returning stacked soil in any thickness of layers when required into plinth side of foundation etceteraconsolidating each deposited layers by ramming and watering then disposing of all surplus unserviceable excavated earth as specified dumping place as per CPWD specifications 2019 complete and direction of Engineer-in-charge including carriage of materials/machinery required to execute the work in all leads and lifts and other incidentials.The rate includes octroi, royality, Malkana, toll tax, goods service tax, labour cess or other taxes imposed by the Government. |
| 2 | Providing and laying in position cement concrete 1:4:8(one cement: four sand: eightgraded/crushed stone aggregate 40mm (forty miillmeter) nominal size mechanically mixed and curing complete including cost of centering and shuttering in foundation and plinth level as per CPWD specifications 2019 complete and direction of Engineer-in-charge including carriage of materials/machinery required to execute the work in all leads and lifts and other incidentials.The rate includes octroi, royality, Malkana, toll tax, goods service tax, labour cess or other taxes imposed by the Government. |
| 3 | Providing and laying in position cement concrete 1:3:6 (onecement:three sand: six graded/crushed stone aggregate 40mm(forty millimeter) nominal size mechanically mixed and curing complete including cost of centring and shuttering infoundation and plinth level as per the directionby the Engineer in charge including carriage of materialswith in all leads and lifts and other incidentals. The rate including octroi, royality, Malkana, toll tax, sale tax or other taxes imposed by the Government. |
| 4 | Providing and laying mechanically mixed and vibrated concretefor plain/reinforced cement concrete 1: 2½:5 (one cement: two and half sand: five graded crushed stone aaggregate)in open foundation for all type of structure complete of plain cement concrete grade M-15 (M-fifteen) nominalmix cement contents not less than 275 kg (two hundred seventy five kilogram) per cubic metre on ground or under water and curing complete including pumping or bailing out water, dewatering removal of slush as required at site which may arise at the time of laying under water complete for all heights/ depths including the cost of form work as per CPWD specification 2019 and direction of the Engineer-in-charge , including carriage of materials within all leads and lifts and other incidentals.The rate includesoctroi, royalty, Malkana, toll tax , goods service tax, labour cess or other taxes imposed by the Government. |
| 5 | Providing and laying cement concrete 1:2:4 (one cement : two coarse sand : four graded/crushed stone aggregate 40 mm (forty millimeter) nominal size in pavements, laid to required slope and camber in panels as required including consolidation finishing and tamping complete. as per CPWD specifications 2019 complete and direction of Engineer-in-charge including carriage of materials/machinery required to execute the work in all leads and lifts and other incidentials.The rate includes octroi, royality, Malkana, toll tax, goods service tax, labour cess or other taxes imposed by the Government. |
| 6 | Providing and laying (to level or slope) 600mm dia (six hundred millimetre ) diametre reinforced cement concrete heavy duty non pressure pipes IS Class NP-2 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1 : 2 ( One cement : two sand)but excluding the cost of excavation, protection works, back filling, concrete and masonry work in head walls and parapetsas perdrawing and CPWD specification 2019 and as per direction of Engineer – in- Charge including carriage of materials within all leads and liftsand other incidentals . The rate includes octroi,royalty, Malkana, toll tax, goods service tax, labour cess orother taxesimposed by the Government. |
| 7 | Providing weepholes in brick masonry/ stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100mm (one hundred millimeters) dia PVC pipe OF MAKE D-PLAST/POLY.having pressure of 4.5 kg per square meter extending through the full width of the structures with slope of 1(V):20(H) (one vertical : twenty horizontal) towards drawing face complete as per CPWD specifications 2019 complete and direction of Engineer-in-charge including carriage of materials/machinery required to execute the work in all leads and lifts and other incidentials.The rate includes octroi, royality, Malkana, toll tax, goods service tax, labour cess or other taxes imposed by the Government. |
| 8 | Back filling with granular material behind abutment, wing wall and return wall complete as per drawing and direction of Engineer in charge including carriage of materials/machinery required to execute the work as per CPWD specifications 2019 complete and direction of Engineer-in-charge including carriage of materials/machinery required to execute the work in all leads and lifts and other incidentials.The rate includes octroi, royality, Malkana, toll tax, goods service tax, labour cess or other taxes imposed by the Government. |
| 9 | Providing and laying factory made chamfered edge Cement Concrete paver blocks in footpath, parks, lawns, drive ways or light traffic parking etc, of required strength, thickness and size/ shape, made by table vibratory method using PU mould, laid in required colour and pattern over 50mm (fifty millimeter) thick compacted bed of sand, compacting and proper embedding/laying of inter locking paver blocks into the sand bedding layer through vibratory compaction by using plate vibrator, filling the joints with sand and cutting of 80 mm (eighty millimeter) thick C.C. paver block of M-30 (M thirty) grade with approved color design and pattern as per required size and pattern, finishing and sweeping extra sand complete all upto any floor level/ height as per CPWD specification 2019the directionby the Engineer in charge including entire carriage of materialswith in all leads and lifts and other incidentials . The rates are inclusive octroi, royality, Malkana, toll tax, goods service tax, labour cess or other taxes imposed by the Government. |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender