Ministry Of Road Transport And Highways has published Tender For Consultancy Services For Feasibility Study And Preparation Of Dpr For Widening And Strengthening To 2-Lane With Paved Shoulder In Km 0 To 115 (Bariyarpur To Vamdah) Of Nh-333 With Land Acquisition In The State Of Bihar.. Submission Date for this Tender is 01-04-2023. Consultancy Service Tenders in Bariyarpur Bihar. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 17-Mar-2023 | Correigendum-1 | Other | 01-04-2023 |
2 | 23-Mar-2023 | CorrigendumII | Other | 01-04-2023 |
Sl. No. | Item Description |
1 | KEY PERSONNEL : |
2 | Team Leader cum Senior Highway Engineer |
3 | Senior Bridge Engineer |
4 | Highway cum Pavement Engineer |
5 | Material cum Geotechnical Engineer - Geologist |
6 | Senior Survey Engineer |
7 | Traffic and Safety Expert |
8 | Environmental Specilist |
9 | Quantity Surveyor / Documentation Expert |
10 | Land Acquisition Expert |
11 | Utility Expert |
12 | SUB-PROFESSIONAL STAFF :(To be assessed by consultant as per requirement of assignment and one sub professional be a fresh graduate) |
13 | .. |
14 | .. |
15 | .. |
16 | .. |
17 | .. |
18 | .. |
19 | .. |
20 | SUPPORT STAFF : |
21 | Office Manager |
22 | Typist |
23 | Office Boy |
24 | Night Watchman |
25 | Transportation (Fixed Costs) |
26 | The Vehicles Provided by the consultants shall include the cost for rental drivers operation, maintenance, Repairs, insurance etc., A. For use of Consultant |
27 | Duty Travel to Site(Fixed Costs): |
28 | Office Rent (Fixed Costs) The rent includes maintenance, cleaning, repairing etc., |
29 | .. |
30 | OFFICE SUPPLIES, UTILITIES AND COMMUNICATIONS (Fixed Costs) |
31 | Office Supplies |
32 | Drafting Supplies |
33 | Computer Running Costs |
34 | Domestic and International Communication |
35 | OFFICE FURNITURE AND EQUIPMENT (Rental) |
36 | Office Furniture and Ecquipment( L.S) |
37 | REPORTS & DOCUMENTS PRINTING ( For Clubbed Projects) |
38 | Monthly report (3copies per Month) |
39 | Inception Report & QAP |
40 | Environment and Social Impact Screening Report |
41 | Draft Feasibility Report |
42 | Final Feasibility Report |
43 | Strip Plan with LA Reports |
44 | Draft LA and Clearances I Report |
45 | Final LA and Clearances I Report |
46 | Draft Environmental Assessment Report & RAP |
47 | Final Environmental Assessment Report and RAP |
48 | Draft Detailed Design Report & Drawings etc. |
49 | Draft EMP |
50 | Draft Bidding Documents |
51 | Final Detailed Project Report with Bill of Quantities, Cost Estimates, Updated Drawings etc. |
52 | Final EMP. |
53 | Final Bidding Documents |
54 | Draft 3(a),3(A) and 3(D) notification for land acquisition (3 copies each) |
55 | LA & Clearances II Report |
56 | Survey and Investigation |
57 | Topographic Survey including hire charges for equipment and supply of survey teams comprising of project survey filed staff etc. inclusive of cost of materials, labourer. |
58 | Detailed topographic surveys using mobile / aerial LiDAR or better Technology |
59 | Investigation (Fixed Cost) |
60 | Road and Bridge Inventory |
61 | FWD Test and Pavement Evaluation |
62 | Roughness Survey |
63 | Axle Load Survey |
64 | Material Survey and Investigation |
65 | Sub-grade Investigation |
66 | Traffice Survey |
67 | Socio-economic & Census Survey/Studies |
68 | Land Acquisition Studies |
69 | Any other Investigations/Surveys |
70 | Sub-Soil Investigation (Boring) |
71 | a) Boring in all type of soils (other than hard rock) |
72 | b) Boring in hard rock |
73 | Network Survey and GPR |
74 | Network Survey of the existing Highways as a repository for civil works as per directions from Authority |
75 | GPR Survey for detection of under ground utilities |
76 | Cost of Supply and Fixing Boundary pillars |
77 | Procuring and fixing boundary pillars and its installation, complete in all respect as per IRC:25,1967: Wherever the proposed alignment follows the existing alignment, the boundary pillars shall be fixed atan interval of 200m on either side of proposed Right of Way. Wherever there is a proposal of realignment of the existing Highway and/ or construction of New Bypasses, Consultant shall fix boundary pillars along the proposed alignment on the extreme boundary on either side of the project Highway at 50 m interval. (lumpsum ) |
78 | Land Acquisition Team including support staff and logistics/ transportation |
79 | Ex-Land Revenue Inspector/ Officer or equivalent |
80 | Ex-Kanoogo/Girdwar or equivalent |
81 | Ex-Patwari or Equivalent |
82 | Typist |
83 | Peon |
84 | B. Logistics for Land Acquisition Team |
85 | Computer including necessary peripherals |
86 | Printers |
87 | Vehicles (Bolero or Equivalent) with monthly running limit of 4000 km |
88 | Estimate of Costs for Expatriate Consultants (in Indian Rupees) |
89 | I. Remuneration of Expatriate Staff including per diem allwances |
90 | II.Mobiliation and Demobilization |
91 | 1. International Airfares (Fixed Costs) |
92 | Total Cost Net of Tax: |
93 | I.Income Tax (Expatriate Staff) |
94 | II.Other Taxes/ duties (if any) Specify Clearly |
95 | Goods and Service Taxes @ 18% |