Supply Of Materials To Formation Of Public Ground At Phc Place At Hanumsagar Village In Kustagi Tq , Add 5% Cost Of Material For Riveting, Bolting And Welding Accessories, Water Tanker, Laboratory Asst. ( Sslc Passed ) / Mate / Supervisor, Add Sundries Charges At 1 % On Material, Add Handling , Loading And Unloading At 1% On Material, Burnt Stone Slabs 10 Cms Thick, Fine Grass, Stone Dresser ( With Tools ) , Add, Ms Flat, Broken Stone Aggregate 12 Mm To 10 Mm Size, Add Providing And Removing Scaffolding At 3% On Labour, Vibratory Roller 8 Tonne, Cobble Stones Of 60 Mm Thick, Pvc Pipe Of 4Kg Cum, 75 Mm, Broken Granite Metal 20 Mm, Add Brush At 1% On Cost Of Paint, Enamel Metal Paint, Portland Cement, Transportation / Loading And Unloading Of Material / Lifting Of Material / Wastage / Unforeseen Charges / Miscellaneous Which Are Necessary During Execution., Mason Class I ( With Tools ) , Water, Mason Class Ii ( With Tools ) , Broken Stone Aggregate 20 Mm Size, Add Sundries Charges At 1 % On Labour, Sludge / Farm Yard Manure @ 0.18 Cum Per 100 Sqm, Mixer ( Concrete Small Used In Culvert ) , Plate Vibrator Having 3 Ton Compaction Force, Burnt Bricks Class 35 ( Non Modular ) , Tractor - 40 Hp, Blacksmith Assistant, Add Handling , Loading And Unloading At 2% On Material, Mixer ( Concrete ) - 1 Cum Capacity, Painter Class I, Gravel 2.36 Mm / Murrum, Broken Stone Aggregate 40 Mm Size, Add Watering Charges At 1 % On Material, Coarse Sand ( Zone Iii )