Tender For Construction Of Road From Bashir Chowk To Patti Tand Via Peepal Chowk Bela Karali In Panchayat Peto Block Keredari District Hazaribag
Tender Value
1.48 Crore
Estimated cost
Bid Submission
24 Feb 2023
0 days left
EMD
2.98 Lakhs
Bank guarantee accepted
Document Fee
10000
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
keredari → Jharkhand
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Construction Of Road From Bashir Chowk To Patti Tand Via Peepal Chowk Bela Karali In Panchayat Peto Block Keredari District Hazaribag
BOQ
| Sl. No. | Item Description |
| 1 | Clearing grass and removal of rubbish up to a distance of 30 m outside the periphery of the area as per Technical Specification Clause 201 |
| 2 | Clearing and Grubbing Road Land (Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness.) |
| 3 | Compacting original ground supporting subgrade (Loosening of the ground upto a level of500 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of table 300-2 for subgrade construction.) |
| 4 | Construction of Subgrade and Earthen Shoulders (Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2) |
| 5 | Excavation for roadwork in soil with hydraulic excavator of0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3 |
| 6 | Construction of Embankment with Material Deposited from Roadway Cutting (Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2) Rolling with smooth wheeled roller |
| 7 | Granular Sub-base with Close Graded Material (Table:- 400-1)By Mix in Place Method (Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401) With Grading-III Material |
| 8 | Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing. |
| 9 | Construction ofun-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design,laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days using curing compound (where specified) and water finishing to lines and grade as per drawingand Technical Specification Clause 1501 |
| 10 | E/W in excavation for structure as per drawing and technical specification clause 305.1 including setting out, construction of shoring and brading, removal of stumps and other deleterious material and disposal utp a lead of 50m, dressing of sides and bottom backfilling in trenches with excavated suitable material. |
| 11 | Providing and laying of dry rubble flooring complete as per drawings and technical specifications Clause 1303.3 |
| 12 | Plain/Reinforced cement concrete in open foundation complete as per drawing and Technical Specifications(P.C.C. Grade M-15) |
| 13 | Stone masonry work in cement mortar in foundation complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203Square Rubble Coursed Rubble Masonry (1st sort) in C.M. (1:3) |
| 14 | Stone masonry work in cement mortar in sub-structure complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203.Coarse Rubble Masonary in C.M. (1:3) in sub-structure |
| 15 | Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications(P.C.C. Grade M-15) |
| 16 | Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications(P.C.C. Grade M-25 in Deck Slab) |
| 17 | Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications |
| 18 | Plastering with cement mortar (1:4), 15 mm thick on brick or stone masonary work in substructure as per technical specification Clauses 613.4 & 1204. |
| 19 | Carriage of materials by diesel truck including loading at source, unloading at work site and stacking properly, labour etc. all complete as per direction of E/I.Cement |
| 20 | Sand |
| 21 | Stone Chips |
| 22 | Stone Metal |
| 23 | Stone Boulder |
| 24 | Steel |
| 25 | Goods & Services Tax (G.S.T.) - 18% |
| 26 | Labour Cess - 1% |
AI Tender Summary
Tender Timeline
Feb 16, 2023
11:30 IST
Tender Published
Tender notice published.
CompletedFeb 24, 2023
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedFeb 27, 2023
Bid Opening Date