| 1 | Erection of structures, including fixing & alignment of templates for grouted /bolted type structure foundations, tightening of nuts & bolts washers, etc.,& including alignment & levelling of structure |
| 2 | Stringing of over head gantries vertical droppers with ACSR conductor including fixing ofinsulator string spare, clamp, etc(SingleZebra Conductor) |
| 3 | Shifting of 33 KV Circuit Breaker up to Civil Foundation& placementon structure andincludingall accessories & making all connections etc. |
| 4 | Shifting of 33 KV Current Transformer from S/s premises to civil foundationand placement on Structure and Erection of CT , fixing of Junction Box & all accessories making all interconnections etc. including its earthing. |
| 5 | Shifting and placement of33 KV isolator on structure and its earthing along with mounting of mechanism Box, interconnections piping, alignment of contacts & all accessories along with application of Petroleum Jelly on Jaws & Contracts. |
| 6 | Placement of33 KV Lighting Arrester on structure and fixing ofall accessories & making all connections etc. |
| 7 | Unloading of 33 KV control and relay panel, shifting up to the control room & placement of panel complete with relays and all other accessories. The placement of C&R panel to be done on MS Channel frame which is to be suitably grouted in the control room as per drawing. earthing of the control panel to be properly done, all interconnection of the C&R panel on terminal block as per drawing including all AC & DC connections. |
| 8 | Fitting of Lighting Fixtures |
| 9 | Laying of cables2 Core x 2.5 Sq.mm on racks/cable trays/angle support overhead racks, conduits including dressing of cables with accessories for copper conductor and armor control cables |
| 10 | Laying of cables 4 Core x 2.5 Sq.mm on racks/cable trays/angle support overhead racks, conduits including dressing of cables with accessories for copper conductor and armor control cables |
| 11 | Laying of cables 8 Core x 2.5 Sq.mm on racks/cable trays/angle support overhead racks, conduits including dressing of cables with accessories for copper conductor and armor control cables |
| 12 | Laying of cables 19 Core x 2.5 Sq.mm on racks/cable trays/angle support overhead racks, conduits including dressing of cables with accessories for copper conductor and armor control cables |
| 13 | Cable terminations consisting the work of providing holes for cable entry, fixing of cable glands, lugs etc. for 2 Core x 2.5 Sq.mm control / Power cables, including terminations at both end |
| 14 | Cable terminations consisting the work of providing holes for cable entry, fixing of cable glands, lugs etc. for 4 Core x 2.5 Sq.mm control / Power cables, including terminations at both end |
| 15 | Cable terminations consisting the work of providing holes for cable entry, fixing of cable glands, lugs etc. for 8 Core x 2.5 Sq.mm control / Power cables, including terminations at both end |
| 16 | Cable terminations consisting the work of providing holes for cable entry, fixing of cable glands, lugs etc. for 19 Core x 2.5 Sq.mm control / Power cables, including terminations at both end |
| 17 | Preparation of earth pit 1.5X1.5X3 as per MPPTCL drawing and embedding 4 Nos. GI pipe size 40 mm dia. 3 Mtr. long. These GI pipes are to be welded with MS flats by making mesh frame and making holes in the pipes for water seepage |
| 18 | Installation of 25mm dia. 3000mm long MS rod earth electrodes by directly driving /drilling the (6\"dia) to in earth including excavation(irrespective of type of soil encountered), backfilling with bentonite soil, welding to earth conductor etc . |
| 19 | Laying of Flat (50 mm x 6 mm ) duly buried at a depth of 0.5 mtr. providing or risers for structures earthing including back filling welding etc. structure earthing of following length. |