|
| 1 | Add Handling , loading and unloading at 1% on Material |
| 2 | Cobble Stones of 60 mm thick |
| 3 | Add Brush at 1% on cost of paint |
| 4 | Add sundries charges at 2 % on Material |
| 5 | Portland Cement |
| 6 | Add providing and removing scaffolding at 3% on Labour |
| 7 | Broken stone aggregate 40 mm size |
| 8 | 15 mm Bolt |
| 9 | Solid concrete blocks (40 x 15 x 20 cms)-4.00 N/Sqmm |
| 10 | Size stone 20 x 20 x 25 cms |
| 11 | Painter Class I |
| 12 | Welding Charges @ 10% on Material |
| 13 | Add watering charges at 1 % on Material |
| 14 | Mason Class II (with tools) |
| 15 | Casurina poles 100 - 150 mm |
| 16 | Add Handling , loading and unloading at 2% on Material |
| 17 | M.S. Angles 65 x 65 x 6 mm 34.7 kgs |
| 18 | Broken stone aggregate 20 mm size |
| 19 | Aluminium paint |
| 20 | Broken stone aggregate 12 mm to 10 mm size |
| 21 | Gravel 2.36 mm/Murrum |
| 22 | Coarse sand (zone III) |
| 23 | 60 x 60 x 10 Guage sq. plate washer |
| 24 | Bond stone 20 x 20 x 45 cm |
| 25 | Transportation/loading and unloading of material/lifting of material /Wastage/Unforeseen charges/Miscellaneous which are necessary during execution. |
| 26 | Fitter Class I |
| 27 | 20 mm dia hold fast rod |
| 28 | Mason Class I (with tools) |
| 29 | Plate vibrator having 3 Ton compaction force |
| 30 | PVC pipe of 4kg\cum,63 mm |
| 31 | Add sundries charges at 1 % on Material |
| 32 | Mixer (concrete small used in culvert) |
| 33 | The cost of all materials, centering, transportation, fixing, wastage and other extra charges etc, excluding the cost of Unskilled labour. |
| 34 | Stone Chistler Class II |
| 35 | Wire mesh 50mm x 50mm |
| 36 | Mixer (concrete) - 1 cum Capacity |
| 37 | Boulders |