| 1 | Stone Chistler Class II |
| 2 | Add Handling , loading and unloading at 2% on Material |
| 3 | Painter Class I |
| 4 | Aluminium paint |
| 5 | Broken stone aggregate 12 mm to 10 mm size |
| 6 | Add sundries charges at 2 % on Material |
| 7 | Plasticizer / super plasticizer |
| 8 | Transportation/loading and unloading of material/lifting of material /Wastage/Unforeseen charges/Miscellaneous which are necessary during execution. |
| 9 | Coarse sand (zone III) |
| 10 | Add Brush, putty, sand paper at 2% on cost of paint |
| 11 | HOM of Vibrator 0.71 days |
| 12 | Motor Grader 3.35 meter blade |
| 13 | Bond stone 20 x 20 x 45 cm |
| 14 | Water Tanker |
| 15 | Add |
| 16 | Add Brush at 1% on cost of paint |
| 17 | Silver oak or equivalent planks 38 mm thick |
| 18 | Mason Class I (with tools) |
| 19 | Welding Charges @ 10% on Material |
| 20 | Portland Cement |
| 21 | Mixer (concrete) - 1 cum Capacity |
| 22 | Broken stone aggregate 20 mm size |
| 23 | Add Handling , loading and unloading at 1% on Material |
| 24 | 38 mm dia of 14 guage MS Black pipe |
| 25 | Casurina poles 100 - 150 mm |
| 26 | Add sundries charges at 1 % on Material |
| 27 | Wheeled Dozer (D50 BEML) |
| 28 | Mason Class II (with tools) |
| 29 | Unit Cost as per the Specification |
| 30 | Binding wire |
| 31 | Add watering charges at 1 % on Material |
| 32 | Broken stone aggregate 40 mm size |
| 33 | water proofing cement paint |
| 34 | Size stone 20 x 20 x 25 cms |
| 35 | Water |
| 36 | Wire mesh 50mm x 50mm |
| 37 | TMT bars Fe 500 |
| 38 | Burnt bricks class 35 (non modular) |
| 39 | Laboratory Asst. (SSLC Passed)/Mate/Supervisor |
| 40 | Casurina Poles 75 - 100 mm dia |
| 41 | Super Plasticizer admixture IS marked as per 9-103-1999 |
| 42 | Jungle wood runners and planks |
| 43 | Gravel 2.36 mm/Murrum |
| 44 | Boulders |
| 45 | Vibratory Roller 8 Tonne |
| 46 | Fitter Class I |
| 47 | Mixer (concrete small used in culvert) |
| 48 | Add providing and removing scaffolding at 3% on Labour |