Tender For E-Procurement Notice No. 48/Occl/2022-23 (On-Line), jajpur-Odisha

Orissa Construction Corporation Limited has published Tender For E-Procurement Notice No. 48/Occl/2022-23 (On-Line). Submission Date for this Tender is 01-03-2023. Lifting Equipment Tenders in jajpur Odisha. Bidders can get complete Tender details and download the document.




Tender Notice

36266675
Tender For E-Procurement Notice No. 48/Occl/2022-23 (On-Line)
Open Tender
Indian
Odisha
jajpur
01-03-2023

Tender Details

E-Procurement Notice No. 48/Occl/2022-23 (On-Line) Erection, Commissioning, Testing And Painting Of 06 Sets Of Barrage Bay And 02 Sets Of Under Sluice Vertical Gates With 2Nd Stage Embedded Parts, 14T Hoist And Its Supporting Structures And 2Nd Stage Concreting Of Saptamatruka Barrage Project

Key Value

Document Fees
INR 11800 /-
EMD
INR 125000.0 /-
Tender Value
Refer document

BOQ Items

Name of Work:Erection, Commissioning, Testing of 06(six) sets of Barrage Bay vertical fixed wheel Gatesof size 8000mm x 2800mm with 2nd Stage Embedded Parts & 14 T hoists and 02(two) sets of Under sluice vertical fixed wheel Gates of size 8000mm x 3300mm with 2nd Stage Embedded Parts & 14 T hoists,Hoist supporting structures, Trestles, Stoplogs, Monorail Supporting structure & walkway for operation of Monorail, Painting & 2nd stage concreting of Saptamatrukabarrage (Right Arm) as per approved drawings pertaining to Saptamatruka Barrage project and direction of the Engineer-in-Charge.
Sl. No. Item Description
1BARRAGE BAY GATES
2Erection of 1 st stage & 2nd Stage Embedded Parts for 06(six) sets of Barrage Bay Gatesof size 8000mm x 2800mm
3Erection, Commissioning, Testing of 06(six) sets of Barrage Bay Gatesof size 8000mm x 2800mm
4Erection, Commissioning, Testing of 06(six) sets of14 T rope drum hoistfor 06(six) sets of Barrage Bay Gatesof size 8000mm x 2800mm
5Erection, Commissioning, Testing of Trestles & hoist supporting Structures for 06(six) sets of14 T rope drum hoist
62ndstage concreting of embedded parts of 06(six) sets of Barrage Bay Gatesof size 8000mm x 2800mmincluding hoist supporting structures & trestles by M25 grade concrete using 20mm and down grade agregates.
7Painting of 06(six) sets of Barrage Bay Gatesof size 8000mm x 2800mmafter blast cleaning process performed with as per requirements & class "A" of IS 14177: 1994. After blast cleaning, the surface should be cleaned from loose dust & debris by air blast with help of blower. Over the prepared surfaces, two coats of zinc richprimer (containing not less than 85% zinc rich on dry film) should be applied to give a dry film thickness of70 ±5 microns. First coat of primer should be applied within sixhours of sand blasting. Fnishingcoat should consist of 02 coats of solventless coal tar epoxy paints. These should be applied at an interval of24 hours.Each coat should give minimum dry film thickness of 150 ±5 microns. Total dry film thickness of all coats including primer coat should not be less than 350 microns. The rate should include compressor, paints, thinner, painting equiments, labour, other machinery, scaffolding etc. required for painting.
8Painting of 06(six) sets of 14 T rope drumHoists for 06(six) sets Barrage Bay Gatesof size 8000mm x 2800mm after blast cleaning process performed with as per requirements & class "B" of IS 14177: 1994. After blast cleaning, the surface should be cleaned from loose dust & debris by air blast with help of blower. Over the prepared surfaces, two coats of zinc phosphateprimershould be applied to give a dry film thickness of40 ±5 microns per each coat. First coat of primer should be applied within sixhours of sand blasting. Fnishingcoat should consist of 01 coat of alkyed based micaceous iron oxide paint at dry film thickness of65 ±5 followed by 02 coats of synthetic enamel paintconfirming to IS 2932 : 1974 to givedry film thickness of 25 ±5 microns per coat of synthetic enamel paint. Total dry film thickness of all coats including primer coat should not be less than 175 microns.The rate should include compressor, paints, thinner, painting equiments, labour, other machinery, scaffolding etc. required for painting.
9Painting of Hoist supporting structure & Trestles for 06(six) sets of 14 T rope drumHoists for 06(six) sets Barrage Bay Gatesof size 8000mm x 2800mm after blast cleaning process performed with as per requirements & class "A" of IS 14177: 1994. After blast cleaning, the surface should be cleaned from loose dust & debris by air blast with help of blower. Over the prepared surfaces, two coats of zinc phosphateprimershould be applied to give a dry film thickness of40 ±5 microns per each coat. First coat of primer should be applied within sixhours of sand blasting. Fnishingcoat should consist of 01 coat of alkyed based micaceous iron oxide paint at dry film thickness of65 ±5 followed by 02 coats of synthetic enamel paint to givedry film thickness of 25 ±5 microns per coat of synthetic enamel paint. Total dry film thickness of all coats including primer coat should not be less than 175 microns. The rate should include compressor, paints, thinner, painting equiments, labour, other machinery, scaffolding etc. required for painting.
10UNDER SLUCE GATE
11Erection of 1 st stage & 2nd Stage Embedded Parts for 02(two) sets of Under Sluice Gatesof size 8000mm x 3300mm
12Erection, Commissioning, Testing of 02(two) sets of Under Sluice Gatesof size 8000mm x 3300mm
13Erection, Commissioning, Testing of 02(two) sets of14 T rope drum hoistfor 02(two) sets of Under Sluice Gatesof size 8000mm x 3300mm
14Erection, Commissioning, Testing of Trestles & hoist supporting Structures for 02(two) sets of14 T rope drum hoist
152ndstage concreting of embedded parts of 02(two) sets of Under Sluice Gatesof size 8000mm x 3300mmincluding hoist supporting structures & trestles by M25 grade concrete using 20mm and down grade agregates.
16Painting 02(two) sets of Under Sluice Gatesof size 8000mm x 3300mmafter blast cleaning process performed with as per requirements & class "A" of IS 14177: 1994. After blast cleaning, the surface should be cleaned from loose dust & debris by air blast with help of blower. Over the prepared surfaces, two coats of zinc richprimer (containing not less than 85% zinc rich on dry film) should be applied to give a dry film thickness of 70 ±5 microns. First coat of primer should be applied within sixhours of sand blasting. Fnishingcoat should consist of 02 coats of solventless coal tar epoxy paints. These should be applied at an interval of24 hours.Each coat should give minimum dry film thickness of 150 ±5 microns. Total dry film thickness of all coats including primer coat should not be less than 350 microns. The rate should include compressor, paints, thinner, painting equiments, labour, other machinery, scaffolding etc. required for painting.
17Painting of 02(two) sets of 14 T rope drumHoists for 02(two) sets Under Sluice Gatesof size 8000mm x 3300mm after blast cleaning process performed with as per requirements & class "A" of IS 14177: 1994. After blast cleaning, the surface should be cleaned from loose dust & debris by air blast with help of blower. Over the prepared surfaces, two coats of zinc phosphateprimershould be applied to give a dry film thickness of40 ±5 microns per each coat. First coat of primer should be applied within sixhours of sand blasting. Fnishingcoat should consist of 01 coat of alkyed based micaceous iron oxide paint at dry film thickness of65 ±5 followed by 02 coats of synthetic enamel paint to givedry film thickness of 25 ±5 microns per coat of synthetic enamel paint. Total dry film thickness of all coats including primer coat should not be less than 175 microns.The rate should include compressor, paints, thinner, painting equiments, labour, other machinery, scaffolding etc. required for painting.
18Painting of Hoist supporting structure & Trestles for 02(two) sets of 14 T rope drumHoists for 02(two) sets of Under Sluice Gatesof size 8000mm x 3300mm after blast cleaning process performed with as per requirements & class "A" of IS 14177: 1994. After blast cleaning, the surface should be cleaned from loose dust & debris by air blast with help of blower. Over the prepared surfaces, two coats of zinc phosphateprimershould be applied to give a dry film thickness of40 ±5 microns per each coat. First coat of primer should be applied within sixhours of sand blasting. Fnishingcoat should consist of 01 coat of alkyed based micaceous iron oxide paint at dry film thickness of65 ±5 followed by 02 coats of synthetic enamel paint to givedry film thickness of 25 ±5 microns per coat of synthetic enamel paint. Total dry film thickness of all coats including primer coat should not be less than 175 microns. The rate should include compressor, paints, thinner, painting equiments, labour, other machinery, scaffolding etc. required for painting..
19STOPLOGS & LATCH ARRANGEMENTS
20Erection of 1 st stage & 2nd Stage Embedded Parts for 08(eight) Nos. of stoplog grooves of size 8000mm x 1150mm for Barrage Bay& Under Sluice
21Erection of 03(three) sets of stoplog leaf segments of size 8000mm x 1150mm for Barrage Bay& Under Sluice
22Erection of latch arrangements for 06(six) Nos. of Barrage Bay& 02(two) Nos. of Under Sluice Bay
232ndstage concreting of embedded parts for 08(eight) Nos. of stoplog grooves of size 8000mm x 1150mm for Barrage Bay& Under Sluice by M25 grade concrete using 20mm and down grade agregates.
24Painting 03(three) sets of Stoplog segmentsof size 8000mm x 1150mmafter blast cleaning process performed with as per requirements & class "A" of IS 14177: 1994. After blast cleaning, the surface should be cleaned from loose dust & debris by air blast with help of blower. Over the prepared surfaces, two coats of zinc richprimer (containing not less than 85% zinc rich on dry film) should be applied to give a dry film thickness of 70 ±5 microns. First coat of primer should be applied within sixhours of sand blasting. Fnishingcoat should consist of 02 coats of solventless coal tar epoxy paints. These should be applied at an interval of24 hours.Each coat should give minimum dry film thickness of 150 ±5 microns. Total dry film thickness of all coats including primer coat should not be less than 350 microns. The rate should include compressor, paints, thinner, painting equiments, labour, other machinery, scaffolding etc. required for painting.
25Painting of 08(eight) sets of latch arrangements for 08(eight) Nos. of bay after blast cleaning process performed with as per requirements & class "A" of IS 14177: 1994. After blast cleaning, the surface should be cleaned from loose dust & debris by air blast with help of blower. Over the prepared surfaces, two coats of zinc phosphateprimershould be applied to give a dry film thickness of40 ±5 microns per each coat. First coat of primer should be applied within sixhours of sand blasting. Fnishingcoat should consist of 01 coat of alkyed based micaceous iron oxide paint at dry film thickness of65 ±5 followed by 02 coats of synthetic enamel paint to givedry film thickness of 25 ±5 microns per coat of synthetic enamel paint. Total dry film thickness of all coats including primer coat should not be less than 175 microns.The rate should include compressor, paints, thinner, painting equiments, labour, other machinery, scaffolding etc. required for painting.
26LIFTING BEAM, MONORAIL SUPPORTING STRUCTUREAND MONORAIL WALKWAY
27Erection of 01(one) set of Lifting Beam for 03 (three) Nos. of stoplog leaf segments of size 8000mm x 1150mm for Barrage Bay& Under Sluice
28Painting of 01(one) set of Lifting Beamafter blast cleaning process performed with as per requirements & class "A" of IS 14177: 1994. After blast cleaning, the surface should be cleaned from loose dust & debris by air blast with help of blower. Over the prepared surfaces, two coats of zinc phosphateprimershould be applied to give a dry film thickness of40 ±5 microns per each coat. First coat of primer should be applied within sixhours of sand blasting. Fnishingcoat should consist of 01 coat of alkyed based micaceous iron oxide paint at dry film thickness of65 ±5 followed by 02 coats of synthetic enamel paint to givedry film thickness of 25 ±5 microns per coat of synthetic enamel paint. Total dry film thickness of all coats including primer coat should not be less than 175 microns. The rate should include compressor, paints, thinner, painting equiments, labour, other machinery, scaffolding etc. required for painting.
29Erection of 10(ten) set of Monorail supporting structures for 08 (eight) Nos. ofBay
30Painting of 10(ten) set of Monorail supporting structures after blast cleaning process performed with as per requirements & class "A" of IS 14177: 1994. After blast cleaning, the surface should be cleaned from loose dust & debris by air blast with help of blower. Over the prepared surfaces, two coats of zinc phosphateprimershould be applied to give a dry film thickness of40 ±5 microns per each coat. First coat of primer should be applied within sixhours of sand blasting. Fnishingcoat should consist of 01 coat of alkyed based micaceous iron oxide paint at dry film thickness of65 ±5 followed by 02 coats of synthetic enamel paint to givedry film thickness of 25 ±5 microns per coat of synthetic enamel paint. Total dry film thickness of all coats including primer coat should not be less than 175 microns.The rate should include compressor, paints, thinner, painting equiments, labour, other machinery, scaffolding etc. required for painting.
31Erection of 08(eight) set of Monorail walkway for 08 (eight) Nos. ofBay
32Painting of 08(eight) set of Monorail walkway after blast cleaning process performed with as per requirements & class "A" of IS 14177: 1994. After blast cleaning, the surface should be cleaned from loose dust & debris by air blast with help of blower. Over the prepared surfaces, two coats of zinc phosphateprimershould be applied to give a dry film thickness of40 ±5 microns per each coat. First coat of primer should be applied within sixhours of sand blasting. Fnishingcoat should consist of 01 coat of alkyed based micaceous iron oxide paint at dry film thickness of65 ±5 followed by 02 coats of synthetic enamel paint to givedry film thickness of 25 ±5 microns per coat of synthetic enamel paint. Total dry film thickness of all coats including primer coat should not be less than 175 microns.The rate should include compressor, paints, thinner, painting equiments, labour, other machinery, scaffolding etc. required for painting.
332ndstage concreting of Monorail supporting structures & Monorail walkway for Barrage Bay& Under Sluice by M25 grade concrete using 20mm and down grade agregates.
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.