Orissa Construction Corporation Limited has published Tender For E-Procurement Notice No. 48/Occl/2022-23 (On-Line). Submission Date for this Tender is 01-03-2023. Lifting Equipment Tenders in jajpur Odisha. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | BARRAGE BAY GATES |
2 | Erection of 1 st stage & 2nd Stage Embedded Parts for 06(six) sets of Barrage Bay Gatesof size 8000mm x 2800mm |
3 | Erection, Commissioning, Testing of 06(six) sets of Barrage Bay Gatesof size 8000mm x 2800mm |
4 | Erection, Commissioning, Testing of 06(six) sets of14 T rope drum hoistfor 06(six) sets of Barrage Bay Gatesof size 8000mm x 2800mm |
5 | Erection, Commissioning, Testing of Trestles & hoist supporting Structures for 06(six) sets of14 T rope drum hoist |
6 | 2ndstage concreting of embedded parts of 06(six) sets of Barrage Bay Gatesof size 8000mm x 2800mmincluding hoist supporting structures & trestles by M25 grade concrete using 20mm and down grade agregates. |
7 | Painting of 06(six) sets of Barrage Bay Gatesof size 8000mm x 2800mmafter blast cleaning process performed with as per requirements & class "A" of IS 14177: 1994. After blast cleaning, the surface should be cleaned from loose dust & debris by air blast with help of blower. Over the prepared surfaces, two coats of zinc richprimer (containing not less than 85% zinc rich on dry film) should be applied to give a dry film thickness of70 ±5 microns. First coat of primer should be applied within sixhours of sand blasting. Fnishingcoat should consist of 02 coats of solventless coal tar epoxy paints. These should be applied at an interval of24 hours.Each coat should give minimum dry film thickness of 150 ±5 microns. Total dry film thickness of all coats including primer coat should not be less than 350 microns. The rate should include compressor, paints, thinner, painting equiments, labour, other machinery, scaffolding etc. required for painting. |
8 | Painting of 06(six) sets of 14 T rope drumHoists for 06(six) sets Barrage Bay Gatesof size 8000mm x 2800mm after blast cleaning process performed with as per requirements & class "B" of IS 14177: 1994. After blast cleaning, the surface should be cleaned from loose dust & debris by air blast with help of blower. Over the prepared surfaces, two coats of zinc phosphateprimershould be applied to give a dry film thickness of40 ±5 microns per each coat. First coat of primer should be applied within sixhours of sand blasting. Fnishingcoat should consist of 01 coat of alkyed based micaceous iron oxide paint at dry film thickness of65 ±5 followed by 02 coats of synthetic enamel paintconfirming to IS 2932 : 1974 to givedry film thickness of 25 ±5 microns per coat of synthetic enamel paint. Total dry film thickness of all coats including primer coat should not be less than 175 microns.The rate should include compressor, paints, thinner, painting equiments, labour, other machinery, scaffolding etc. required for painting. |
9 | Painting of Hoist supporting structure & Trestles for 06(six) sets of 14 T rope drumHoists for 06(six) sets Barrage Bay Gatesof size 8000mm x 2800mm after blast cleaning process performed with as per requirements & class "A" of IS 14177: 1994. After blast cleaning, the surface should be cleaned from loose dust & debris by air blast with help of blower. Over the prepared surfaces, two coats of zinc phosphateprimershould be applied to give a dry film thickness of40 ±5 microns per each coat. First coat of primer should be applied within sixhours of sand blasting. Fnishingcoat should consist of 01 coat of alkyed based micaceous iron oxide paint at dry film thickness of65 ±5 followed by 02 coats of synthetic enamel paint to givedry film thickness of 25 ±5 microns per coat of synthetic enamel paint. Total dry film thickness of all coats including primer coat should not be less than 175 microns. The rate should include compressor, paints, thinner, painting equiments, labour, other machinery, scaffolding etc. required for painting. |
10 | UNDER SLUCE GATE |
11 | Erection of 1 st stage & 2nd Stage Embedded Parts for 02(two) sets of Under Sluice Gatesof size 8000mm x 3300mm |
12 | Erection, Commissioning, Testing of 02(two) sets of Under Sluice Gatesof size 8000mm x 3300mm |
13 | Erection, Commissioning, Testing of 02(two) sets of14 T rope drum hoistfor 02(two) sets of Under Sluice Gatesof size 8000mm x 3300mm |
14 | Erection, Commissioning, Testing of Trestles & hoist supporting Structures for 02(two) sets of14 T rope drum hoist |
15 | 2ndstage concreting of embedded parts of 02(two) sets of Under Sluice Gatesof size 8000mm x 3300mmincluding hoist supporting structures & trestles by M25 grade concrete using 20mm and down grade agregates. |
16 | Painting 02(two) sets of Under Sluice Gatesof size 8000mm x 3300mmafter blast cleaning process performed with as per requirements & class "A" of IS 14177: 1994. After blast cleaning, the surface should be cleaned from loose dust & debris by air blast with help of blower. Over the prepared surfaces, two coats of zinc richprimer (containing not less than 85% zinc rich on dry film) should be applied to give a dry film thickness of 70 ±5 microns. First coat of primer should be applied within sixhours of sand blasting. Fnishingcoat should consist of 02 coats of solventless coal tar epoxy paints. These should be applied at an interval of24 hours.Each coat should give minimum dry film thickness of 150 ±5 microns. Total dry film thickness of all coats including primer coat should not be less than 350 microns. The rate should include compressor, paints, thinner, painting equiments, labour, other machinery, scaffolding etc. required for painting. |
17 | Painting of 02(two) sets of 14 T rope drumHoists for 02(two) sets Under Sluice Gatesof size 8000mm x 3300mm after blast cleaning process performed with as per requirements & class "A" of IS 14177: 1994. After blast cleaning, the surface should be cleaned from loose dust & debris by air blast with help of blower. Over the prepared surfaces, two coats of zinc phosphateprimershould be applied to give a dry film thickness of40 ±5 microns per each coat. First coat of primer should be applied within sixhours of sand blasting. Fnishingcoat should consist of 01 coat of alkyed based micaceous iron oxide paint at dry film thickness of65 ±5 followed by 02 coats of synthetic enamel paint to givedry film thickness of 25 ±5 microns per coat of synthetic enamel paint. Total dry film thickness of all coats including primer coat should not be less than 175 microns.The rate should include compressor, paints, thinner, painting equiments, labour, other machinery, scaffolding etc. required for painting. |
18 | Painting of Hoist supporting structure & Trestles for 02(two) sets of 14 T rope drumHoists for 02(two) sets of Under Sluice Gatesof size 8000mm x 3300mm after blast cleaning process performed with as per requirements & class "A" of IS 14177: 1994. After blast cleaning, the surface should be cleaned from loose dust & debris by air blast with help of blower. Over the prepared surfaces, two coats of zinc phosphateprimershould be applied to give a dry film thickness of40 ±5 microns per each coat. First coat of primer should be applied within sixhours of sand blasting. Fnishingcoat should consist of 01 coat of alkyed based micaceous iron oxide paint at dry film thickness of65 ±5 followed by 02 coats of synthetic enamel paint to givedry film thickness of 25 ±5 microns per coat of synthetic enamel paint. Total dry film thickness of all coats including primer coat should not be less than 175 microns. The rate should include compressor, paints, thinner, painting equiments, labour, other machinery, scaffolding etc. required for painting.. |
19 | STOPLOGS & LATCH ARRANGEMENTS |
20 | Erection of 1 st stage & 2nd Stage Embedded Parts for 08(eight) Nos. of stoplog grooves of size 8000mm x 1150mm for Barrage Bay& Under Sluice |
21 | Erection of 03(three) sets of stoplog leaf segments of size 8000mm x 1150mm for Barrage Bay& Under Sluice |
22 | Erection of latch arrangements for 06(six) Nos. of Barrage Bay& 02(two) Nos. of Under Sluice Bay |
23 | 2ndstage concreting of embedded parts for 08(eight) Nos. of stoplog grooves of size 8000mm x 1150mm for Barrage Bay& Under Sluice by M25 grade concrete using 20mm and down grade agregates. |
24 | Painting 03(three) sets of Stoplog segmentsof size 8000mm x 1150mmafter blast cleaning process performed with as per requirements & class "A" of IS 14177: 1994. After blast cleaning, the surface should be cleaned from loose dust & debris by air blast with help of blower. Over the prepared surfaces, two coats of zinc richprimer (containing not less than 85% zinc rich on dry film) should be applied to give a dry film thickness of 70 ±5 microns. First coat of primer should be applied within sixhours of sand blasting. Fnishingcoat should consist of 02 coats of solventless coal tar epoxy paints. These should be applied at an interval of24 hours.Each coat should give minimum dry film thickness of 150 ±5 microns. Total dry film thickness of all coats including primer coat should not be less than 350 microns. The rate should include compressor, paints, thinner, painting equiments, labour, other machinery, scaffolding etc. required for painting. |
25 | Painting of 08(eight) sets of latch arrangements for 08(eight) Nos. of bay after blast cleaning process performed with as per requirements & class "A" of IS 14177: 1994. After blast cleaning, the surface should be cleaned from loose dust & debris by air blast with help of blower. Over the prepared surfaces, two coats of zinc phosphateprimershould be applied to give a dry film thickness of40 ±5 microns per each coat. First coat of primer should be applied within sixhours of sand blasting. Fnishingcoat should consist of 01 coat of alkyed based micaceous iron oxide paint at dry film thickness of65 ±5 followed by 02 coats of synthetic enamel paint to givedry film thickness of 25 ±5 microns per coat of synthetic enamel paint. Total dry film thickness of all coats including primer coat should not be less than 175 microns.The rate should include compressor, paints, thinner, painting equiments, labour, other machinery, scaffolding etc. required for painting. |
26 | LIFTING BEAM, MONORAIL SUPPORTING STRUCTUREAND MONORAIL WALKWAY |
27 | Erection of 01(one) set of Lifting Beam for 03 (three) Nos. of stoplog leaf segments of size 8000mm x 1150mm for Barrage Bay& Under Sluice |
28 | Painting of 01(one) set of Lifting Beamafter blast cleaning process performed with as per requirements & class "A" of IS 14177: 1994. After blast cleaning, the surface should be cleaned from loose dust & debris by air blast with help of blower. Over the prepared surfaces, two coats of zinc phosphateprimershould be applied to give a dry film thickness of40 ±5 microns per each coat. First coat of primer should be applied within sixhours of sand blasting. Fnishingcoat should consist of 01 coat of alkyed based micaceous iron oxide paint at dry film thickness of65 ±5 followed by 02 coats of synthetic enamel paint to givedry film thickness of 25 ±5 microns per coat of synthetic enamel paint. Total dry film thickness of all coats including primer coat should not be less than 175 microns. The rate should include compressor, paints, thinner, painting equiments, labour, other machinery, scaffolding etc. required for painting. |
29 | Erection of 10(ten) set of Monorail supporting structures for 08 (eight) Nos. ofBay |
30 | Painting of 10(ten) set of Monorail supporting structures after blast cleaning process performed with as per requirements & class "A" of IS 14177: 1994. After blast cleaning, the surface should be cleaned from loose dust & debris by air blast with help of blower. Over the prepared surfaces, two coats of zinc phosphateprimershould be applied to give a dry film thickness of40 ±5 microns per each coat. First coat of primer should be applied within sixhours of sand blasting. Fnishingcoat should consist of 01 coat of alkyed based micaceous iron oxide paint at dry film thickness of65 ±5 followed by 02 coats of synthetic enamel paint to givedry film thickness of 25 ±5 microns per coat of synthetic enamel paint. Total dry film thickness of all coats including primer coat should not be less than 175 microns.The rate should include compressor, paints, thinner, painting equiments, labour, other machinery, scaffolding etc. required for painting. |
31 | Erection of 08(eight) set of Monorail walkway for 08 (eight) Nos. ofBay |
32 | Painting of 08(eight) set of Monorail walkway after blast cleaning process performed with as per requirements & class "A" of IS 14177: 1994. After blast cleaning, the surface should be cleaned from loose dust & debris by air blast with help of blower. Over the prepared surfaces, two coats of zinc phosphateprimershould be applied to give a dry film thickness of40 ±5 microns per each coat. First coat of primer should be applied within sixhours of sand blasting. Fnishingcoat should consist of 01 coat of alkyed based micaceous iron oxide paint at dry film thickness of65 ±5 followed by 02 coats of synthetic enamel paint to givedry film thickness of 25 ±5 microns per coat of synthetic enamel paint. Total dry film thickness of all coats including primer coat should not be less than 175 microns.The rate should include compressor, paints, thinner, painting equiments, labour, other machinery, scaffolding etc. required for painting. |
33 | 2ndstage concreting of Monorail supporting structures & Monorail walkway for Barrage Bay& Under Sluice by M25 grade concrete using 20mm and down grade agregates. |