| 1 | Jungle clearance in borrow area,building premises,flanks and slopes on the road,canals and embankment by removing the grass and the jungle bushes from the topincluding weeding out shrubs including roots and levelling etc. complete as per direction of E/I.(Specification revised in meeting of regional Co-ordinators held on 11.01.84 in the office of T.E.C.) (Vide Item No.5.1.3.1 of WRD Part-B, Pg No.-97) / Common Part-A Page No.-195 Sl. No.- 2.02 |
| 2 | Trimming and dressing the side slope of dam to proper section with all leads and lifts as per drawing specification and direction of E/I.(Vide Item No.5.1.38. WRD Part-B) |
| 3 | Dismantling plain cement or lime concrete work including stacking serviceable materials in countable stacks within 15M. Lead and disposal of unserviceable materials with all leads all complete as per direction of E/I.(Vide Item No. 2.04(i)B WRD Part-A) |
| 4 | Dismantling pucca brick or lime work including stacking serviceable materials in countable stacks within 15M. Lead and disposal of unserviceable materials with all leads all complete as per direction of E/I.(Vide Item No. 2.04(ii)B WRD Part-A) |
| 5 | E/W in excavation of foundation trenches in ordinary soil (vide classification of soil item-A) and disposal of excavated earth so obtained to a distance upto 50m and average lift 1.5m including levelling, ramming the foundation trenches removing roots or shrubs etc all complete as per specification and direction of E/I.(Vide Item No. - 7.1.17 of WRD Part -B) |
| 6 | E/W in excavationin canal by the hydraulic excavator as per designed section in all kinds of soil,soil mixed with kankar,pebbles& boulders up to 300 mm size & disposal of soil up to 10 m with all lifts by tipper including construction & maintenance of haul road all complete as per specification & direction of E/I(Vide Item No. - 7.1.43.1 of WRD Part -B Pg-138) |
| 7 | E/W in excavationin canal by the hydraulic excavator as per designed section in all kinds of soil,soil mixed with kankar,pebbles& boulders up to 300 mm size& disposal of soil up to 500 m with all lifts by tipper including construction & maintenance of haul road all complete as per specification & direction of E/I.(Vide Item No. - 7.1.43.2 of WRD Part -B Pg-138) |
| 8 | Extra for wet earth all complete as per specification and direction of E/I. (Vide Item No. - 7.1.22of WRD Part - B ,Pg No.-135) |
| 9 | Dewatering by 10 HP diesel pump all complete job.(WRD Part-B, PM-29, Pg No.- 83, sl no. - 10) |
| 10 | Providing coarse clean local sand in filling in foundation trenches including ramming,watering,royality & all other taxes complete job as per specification and direction of E/I..(Vide Item No. - 7.1.37of WRD Part -B , Pg No.-137) |
| 11 | Providing and laying P.C.C or R.C.C M150 with nominal mix of (1:2:4) in various components of dam foundation with approved quality of 20mm graded coarse aggregate of required grade as per design and approved quality of sand of requisite F.M (2.5 to 3.0) washed and screened excluding cost of shuttering or form-work as of reinforcement its cutting, bending, binding and placing but including necessary tools and plants and vibra tion, curing, royalty all taxes etc. complete job as per specification and direction of E/l. (Vide item No.- 5.3.6 of WRD Part- B, Pg No.- 109) / Item No.-5.3.1.2 of BCD Part- B , Pg No.- 106 |
| 12 | Providiag rough dressed random rubble stone masonary in CM (1:4) in foundation with approved quality of coarse sand of requisite F.M (2.5 to 3) washed and screened with raking out joints, curing, scaffolding and its removal wherever required royalty etc. complete job as per specificition and direction of E/l. (Vide Item No.-5.4.8 of WRD Part- B, Pg No.- 111) /Vide Item No.- 5.2.28 of Common Part-A , Pg.No.-204 |
| 13 | Supplying and laying sand filter on slope of dam as per design, drawing with watering and cpmpaction including the cost of materials, royalty and all taxes etc. but excluding the cost of carriage all complete as per specification and direction of E/I.(Vide Item No.- 5.6.5 of Common Part-A Pg-209) |
| 14 | Supplying and laying stone metal (20mm to 63mm) filter on slope of dam as per design, drawing including the cost of materials, royalty and all taxes etc. but excluding the cost of carriage all complete as per specification and direction of E/I.(Vide Item No.- 5.6.7 of Common Part-A Pg-209) |
| 15 | Supplying and laying (properly as per design and drawing) rip-rap with good quality of boulders duly packed including the cost of materials, royalty and all taxes etc. but excluding the cost of carriage all complete as per specification and direction of E/I..(Vide Item No.- 5.6.8 of Common Part-A Pg-209) |
| 16 | Providing 25 mm thick cement plaster (1:4) with approved quality of sand of requisite F.M. (2.5 to 3.0) washed and screened including curing, scaffoldingwherever required and its removal royalty and all taxes etc. complete job as per specification and direcition of E/l.(Vide Item No. 5.5.5 of WRD Part -B, Pg No.- 113) / V ide Item No.- 5.7.12 of Common Part-A, Pg No.-200 |
| 17 | Providing 1.5mm thick cement punning including curing etc. complete job as per specification and direction of E/I. (Vide Item No. - 5.7.11, Part - A, Pg. No. - 57) |
| 18 | Providing shuttering, including strutting, proping etc. and its removal after use in foundation work as per specification and direction of E/I. (Vide Item No.- 5.3.17 of WRD Part- B, Pg No.- 110) |
| 19 | Carriage of materials |
| 20 | (i)Cement – Lead 20 KM(S) |
| 21 | (ii) Sand – Lead 40 KM(S) |
| 22 | (iii) Stone Chips – Lead 30 KM(S) |
| 23 | (iv) Metal – Lead 30 KM(S) |
| 24 | (iv) Boulder – Lead 30 KM(S) |
| 25 | 18 % GST on Estimated Amount |
| 26 | Labour Cess @1% on above total estimated amount |